IEEE-SA Attendance Tracking Tool Project Wrap Up for 802 Implementation Dallas – November 2008.

Slides:



Advertisements
Similar presentations
Two Components IMAT consists of two components
Advertisements

Ec-12-0xyz EC Rules November 2012 James Gilb (Tensorcom) IEEE 802 Rules Update November 2012 meeting.
IEEE Automated Meeting Attendance Tool Attendee Enrollment Process Michael Kipness Christina Sahr
IEEE Automated Meeting Attendance Tool Attendee Enrollment Process Michael Kipness Christina Sahr
IEEE Standards Association Attendance Tool Manager Access.
Doc.: IEEE /0741r1 Report July 2015 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report July 2015 Date: Authors:
Submission doc.: IEEE 11-14/1337r0 November 2014 Jon Rosdahl, CSRSlide 1 1 st Vice Chair Report – Nov 2014 – San Antonio Date: Authors:
IEEE E-Tools Offering Mentor IMAT –IEEE Meeting Attendance Tool.
Doc.: IEEE /0250r0 Submission March 2013 Adrian Stephens, Intel CorporationSlide Members: how to set up an IEEE- SA web account Date:
Doc.: IEEE /0096r8 Report November 2013 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report November 2013 Date:
All Unit Charter Renewals are due at the respective District’s Roundtable Meeting in November Last Updated 9/29/15.
Doc.: IEEE /0038r0 Submission Jan 2012 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report – Jan 2012 Date: Authors:
Doc.: IEEE /0058r0 Submission January 2008 Harry Worstell, AT&TSlide 1 Opening Network Information, Attendance and Documentation for January 2008.
IEEE-SA Public Review IEEE/PES PE/SPDC Committee San Diego, CA May 2015.
Doc.: IEEE /0994r0 Report September 2015 Jon Rosdahl (CSR - Qualcomm)Slide 1 1 st Vice Chair Report Sept 2015 Bangkok Date: Authors:
IEEE Working Group on Broadband Wireless Access (BWA) IEEE /0047.
Doc.: IEEE /0773r1 Submission July 2007 Rick Alfvin, VeriLANSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
IEEE-SA 802 EC – March 2012 Plenary Standards Development Solutions & ETools Update DCN: ec SA.
All Unit Charter Renewals are due at the respective District’s Roundtable Meeting in November Last Updated 9/29/15.
Doc.: IEEE /0252r1 Submission May 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
IEEE Standards Association IMAT Manager. 2 Sign in to IMAT Enter your IEEE Account username/ and password.
IEEE-SA Meeting Attendance Tool Attendee Enrollment Process Christina Sahr
IEEE-SA 802 EC – March 2013 Plenary Standards Development Solutions & ETools Update DCN:
Doc.: IEEE /0005r4 Submission September 2010 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report - Sept 2010 Date:
Submission doc.: IEEE /1214r0 November 2015 Jon Rosdahl, CSR-QualcommSlide 1 1st Vice Chair Report November Dallas Date: Authors:
Doc.: IEEE /0096r6 Report September 2013 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report September 2013 Date:
How to change a Sponsor ballot vote in myProject Sponsor Ballot – Vote Change Updated : 2 September 2011.
/16 Final Project Report By Facializer Team Final Project Report Eagle, Leo, Bessie, Five, Evan Dan, Kyle, Ben, Caleb.
Doc.: IEEE /2458r0 Submission September 2007 Harry Worstell, AT&TSlide 1 Opening Attendance Documentation and Network Info Date: Authors:
Doc.: IEEE /0051r1 Submission May 2011 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report - May 2011 Date: Authors:
Central Desktop Online Collaboration Tool. Background to E-Tools Identify, develop, integrate, and make available a set of best-in- class electronic tools.
IEEE PCIC Standards Working Group Officers’ Workshop IEEE-SA Public Review Overview for Sponsor Chairs, Working Group Chairs and Ballot Designees Pat Roder.
1st Vice Chair Report - Sept Waikoloa
1st Vice Chair Report – November 2016 – San Antonio
1st Vice Chair Report – November 2016 – San Antonio
nd Vice Chair’s Report November 2013
1st Vice Chair Report – November 2017 – Orlando, Florida
1st Vice Chair Report – September 2016 – Warsaw
nd Vice Chair’s Report - Jan 2011
nd Vice Chair’s Report - May 2011
MyProject Edit WG Web Site Data.
nd Vice Chair’s Report – Mar 2012
nd Vice Chair’s Report - July 2011
IEEE Standards Association IMAT Manager
nd Vice Chair’s Report March 2014
nd Vice Chair’s Report May 2013
nd Vice Chair’s Report – Nov 2012
nd Vice Chair’s Report - Sept 2011
nd Vice Chair’s Report March 2014
802.21Voting Membership Process
nd Vice Chair’s Report – May 2012
nd Vice Chair’s Report – July 2012
nd Vice Chair’s Report - Nov 2011
nd Vice Chair’s Report - Nov 2010
1st Vice Chair Report – November 2017 – Orlando, Florida
nd Vice Chair’s Report – Jan 2013
nd Vice Chair’s Report January 2014
nd Vice Chair’s Report July 2013
nd Vice Chair’s Report – March 2013
IEEE MEDIA INDEPENDENT HANDOVER DCN:
nd Vice Chair’s Report – Nov 2012
nd Vice Chair’s Report September 2013
nd Vice Chair’s Report – Sept 2012
1st Vice Chair Report - Jan St Louis
nd Vice Chair’s Report – Jan 2013
Month Year doc.: IEEE yy/xxxxr0 March 2012
1st Vice Chair Report – November 2016 – San Antonio
1st Vice Chair Report - Jan St Louis
Presentation transcript:

IEEE-SA Attendance Tracking Tool Project Wrap Up for 802 Implementation Dallas – November 2008

Background Information –January  IMAT Project began with specification and discovery ( as lead). –March - November  development of tool following specification  First meeting try-out in September –December  Christina joined project group

Background Information –March  New WG leadership.  Removed voter calculations due to multiple interpretations/variances within 802 WGs.  All wireless groups using the tool (except.17) –July  adopts use of tool –September  Implemented web hosted version.  Successful use at.1,.3, and.16 interims.  All WGs adopted use of tool.

Review of 802 Requirements User compatibility – complete –VPN & multiple browser, compatibility –Web based and local server access Management functions –Add, delete, change attendees and percentage- complete –Add/delete meetings and sessions  add access is for staff only; will make available for officers by Dec 2008  Delete meetings and sessions is permanent (future enhancement to provide csv log for Attendance Manager to assist in manual undo changes) –Change attendee information (contact, user id, etc) is done by the attendee through Web Accounts

Review of 802 Requirements Management functions –Designated volunteer access to manager tool is provided to Sponsor & WG Chairs, Standards Rep, Funded Project Manager, Staff Liaison, Attendance Designee, Vice Chair and Secretary roles - complete –Reset local password – complete –Unique ID for attendance – complete –Automatically input registration DB – Need more information –Integrate with myProject – manual process until approved/mandated by SA –Detect duplicate attendees – meeting planner access (development in process); will not work for overlapping sessions at different locations – must use session code. –Meeting updates occur every 10 minutes (Manager  Local)

Review of 802 Requirements Reports –Track mgmt changes report – future enhancement provide log file as csv –Letter ballots, voting rights, historical voting membership info are not provided by IMAT –Multiple reports are available in both the attendee software and manager software (well documented). COMPLETE Attendance –Sign up restricted to specific time and task group –Display current % attendance – we do not display historic data to attendee – could be future enhancement

Review of 802 Requirements Attendance –Attendee manages their own contact info through Web Accounts –Reciprocal rights will only work if the Involvement Levels are kept up to date in myProject –Record AP where attendance is registered – could be future enhancement Misc. –Portability, resilience – complete –Source code in escrow 

Misc. Requirement – source code SA Staff will continue to support the tool as needed: –Chair training presentations –Staff Liaison knowledge –Maintain server for web-based access to manager tool and web hosted attendee tool Bugs fixes and enhancements –SA will continue to provide technical support to fix bugs that come up

Additional Enhancement Requests Process for submittal of enhancements to IEEE-SA –Only enhancements requested by the 802 EC (through James Gilb or other designated rep) will be accepted. –Requests are submitted to Walter and Christina via –Funding for enhancement will need to be determined