The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Module N° 7 – SSP training programme
SAFETY MANAGEMENT WORKSHOP
© Integra A/S SAFETY MANAGEMENT WORKSHOP Karachi - January 2006 PRESENTERS: PETER THORSEN STEFAN REIB.
ICAO Safety Oversight Audit and Safety Oversight Status in Nepal
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
International Civil Aviation Organization Establishing and Sustaining an RSOO: Enablers, Obstacles and lessons learnt Meshesha Belayneh Regional Director,
The Role of the Regulator Session 5 Presentation 2.
International Civil Aviation Organization Nancy Graham Director - Air Navigation Bureau 28 October 2011 Symposium on RSOOs Meeting Outcomes.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar.
Continuous Climb Operations (CCO) Saulo Da Silva
States’ Action Plans and Assistance to States
Safety Oversight System in India
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
ICAO Provisions for Safety Management
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA 1973 to 2004.
International Civil Aviation Organization European and North Atlantic Office ICAO EUR HLSC Preparatory Seminar 9-11 February 2010 Baku, Azerbaijan Theme.
APAC PBN Seminar F.LECAT (ICAO)
CIVIL AVIATION BUREAU OF JAPAN Long term vision for Air Traffic Systems CARATS (Collaborative Actions for Renovation of Air Traffic Systems) CP01 /Ipxx.
AUDITS AND INSPECTIONS
Introduction to the national work plan on Capacity Development for the CDM under the Project Nguyen Khac Hieu Project coordinator International Cooperation.
One of the least known and most vital roles in support of international civil aviation is that of the Aeronautical Information Services (AIS). The AIS.
ATM Implementation Support by ICAO APAC RSO
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
6Th International Conference ICAO Global Aviation Training Office
Introduction to PBN Seminar ICAO PBN Implementation 1.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic Training on Management of.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
AIS/MAP Seminar Kiev May 2003 EUR/NAT Regional Officer AIS/MET Björn Hellroth EUR/NAT Regional Officer AIS/MET Björn Hellroth.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
Presented to: Pacific Aviation Directors’ Workshop By: Jim Spillane, Sr. FAA Representative, Pacific Rim Date: 3/14/2012 Transition to the USOAP Continuous.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
33rd APEC Transportation Working Group Tokyo, Japan October Presenter’s Name: Kinya ICHIMURA Special Assistant to the Director of the Office,
ICAO Requirements on Certification of Aerodromes Module - 2
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Module-3 OJT (Vietnam) on “Design Verification/Ground.
SEVERAL ISSUES OF CAPACITY BUILDING FOR CDM IN RESEARCH AGENCIES AND UNIVERSITIES Mr. Nguyen Mong Cuong Institute of Meteorological and Hydrology Mr. Bui.
International Aviation Safety Data Exchange Ms. Emily White, Chair, AEG and AEG-SAF United States April 15, 2008.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic PANS-OPS Procedure Design.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
ICAO COSCAP - SA May AERODROME CERTIFICATION COURSE How can aerodrome certification be achieved? Establish an appropriate regulatory system within.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
SUDAN CIVIL AVIATION AUTHORITY 1 3 rd AFI SAFETY WEEK 27 JUNE TO 1 JULY 2016 NSP IMPLEMENATION CHALENGES & BENEFITS 28/06/ rd AFI AVIATION WEEK.
APAC PBN Seminar F.LECAT (ICAO)
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
ATM Implementation Support by ICAO APAC RSO
Foreign Air Operator Validation & Surveillance Course
African Flight Procedure Programme Assistance (AFPP)
Familiarization Training on PBN Operations for ATC CLOSING
Presented by United Arab Emirates
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
AIS/MAP Seminar Kiev May 2003
Department of Civil Aviation Ministry of Information & Communications
Foreign Air Operator Validation & Surveillance Course
Technical Co-operation Challenges
Nancy Graham Director - Air Navigation Bureau 28 October 2011
Regional Director, Eastern & Southern African Office, ICAO
Development of energy balance statistics
Performance Based Navigation –Civil Aviation Authority Actions
ICAO SAFETY INITIATIVES Certification of Aerodromes
Long term vision for Air Traffic Systems CARATS
The Role of the Regulator
Aerodrome Certification Workshop
Aerodrome Certification Workshop
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar and Capability Survey For Vietnam Hanoi, 25 – 28 October 2011 “Inception Report” Briefing and Preparatory Meeting CAAV, 09:00-15:30, Tuesday, 25 October

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Human resources development to having capability of design and publish the Instrument Flight Procedure (IFP) for Performance-based Navigation (PBN), which utilize Global Navigation Satellite System (GNSS), is one of the most important key factors for the Project. 2.However, Vietnam faces human resources challenges to implement adequate Flight Procedure Design (FPD) process, suffering with a shortage in human resources for PBN IFP. 3.ICAO’s Universal Safety Oversight Audit Programme (USOAP) pointed out inadequacy of FPD structure. 2

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Mr. Sadakazu KIRIHARA Special Assistant to the Director Flight Procedure and Airspace Program Office, Air Traffic Control Division, Air Traffic Services (ATS) Department, Civil Aviation Bureau (JCAB), Ministry of Land, Infrastructure, Transport and Tourism (MLIT) 3 Air Traffic Controller at Naha Area Control Center (ACC), Kansai (Osaka) Airport, Naha Airport, Osaka Regional CAB

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Mr. Hidehisa YOSHIDA Deputy Manager Flight Procedure Design, Airspace Group, First Division, NTT DATA i Corporation Assist JCAB in developing instrument flight procedure design and construction. 4 Architect and Civil Engineering Airport Planning Consultant Designed more than 100 Instrument Flight Procedures in Japan

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Exchange of Basic Knowledge relating to PBN Flight Procedure Design between Vietnamese Counterparts and JICA Experts; 2.Study by JICA PBN Experts on PBN Flight Procedure Design Capability of Vietnamese Counterparts; and 3.Recommendations by JICA PBN Experts to the Project with a view to improving the Project Programs. Through “the PBN Flight Procedure Design Seminar” and discussions with Vietnamese Stakeholders, such as CAAV, VATM, NAC/MAC/SAC, VAA, Airlines, the Ministry of Natural Resources and Energy (MONRE). 5

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Explanation and Confirmation of Inception Report (Tuesday) 2.Preparatory Meeting (Tuesday) 3.Seminar on PBN Flight Procedure Design (Wednesday) 4.Information Survey and Assessment on FPD Structure and Standards (Thursday) 5.Assessment on PBN Roadmap (Thursday & Friday) 6.Recommendation for Service Provider on PBN FPD Implementation (Friday) 7.Recommendation on Hanoi Flight Procedure Office (FPO) (Tuesday, Thursday & Friday) * only in Vietnam 8.Preparation and Submission of On-site Work Completion Report (Friday) 6

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Conducted based on Questionnaire forwarded to CAAV on 7 October and replied by CAAV on 20 October; Necessary information collected by interview with C/P and discussions at meetings on Tuesday, 25 and Thursday, 27; Visit at office or working area where FPD process is carried out as far as possible; Visit to ATC Facilities on Thursday, 27; Appreciate documented data and/or materials, such as regulations, standards, manuals, and record etc. 7 Very Important, equally to the PBN Seminar, for the PBN Capability Survey.

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Information to be covered by Survey 1.Flight Procedure Design Structure Organization Human Resources Equipment Materials Training 2.Flight Procedure Design Standards Flight Procedure Design Standards Manuals Forms 3.Other Terrain and Obstacle Data 8

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam ✈ Flight Procedure Office (FPO) will be established in Hanoi in accordance with the formal arrangements between CAAV and JICA under the Technical Corporation Agreement between the Government of Vietnam and Japan (Minutes of Meeting (M/M) signed on 8 June 2010, Record of Discussions (R/D), and M/M signed on 26 November 2010). ✈ Two (2) sets of Flight Procedure Design Software (Automation Tools) will be installed with necessary supporting systems by JICA. ✈ Software at Hanoi FPO will be used for PBN Flight Procedure Design- related training jointly for Cambodia, Lao PDR and Vietnam, during and after the Project period. ✈ First Flight Procedure Design training course will be programmed in May or June 2012 as earliest. ✈ Software at Hanoi FPO may be used for Flight Procedure Design and/or Validation by respective Counterpart. 9

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam ✈ JICA is currently undergoing procurement process of the Deign Software, and preparatory work of the Software installation is expected to begin November or December ✈ Location of Hanoi FPO needs to be decided as soon as possible; ✈ Adequate office space, facilities, equipment, personnel should be allocated to Hanoi FPO by Vietnamese Counterparts. ✈ Aeronautical Data necessary for the Software need to be provided (preferably in digital/electronic form, but if not available, in printed form) by Vietnamese Counterpart by 31 December They are a.Data of airports/aerodromes, runways, ground navigation aids, fixes/waypoints, FIR; b.Obstacle Data; c.Digital Elevation Model Data; d.Raster Map Image Data; e.National Border Lines or Coastlines Data. 10

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Tuesday, 25 08:45-09:00Courtesy visit to Mr. Dinh Viet Thang, Deputy Director General, CAAV, as the Project Director 09:00-11:30Preparatory Meeting with CAAV & VATM Counterparts (Room 509 in CAAV) PBN Seminar arrangement PBN Capability Survey based on Questionnaire forwarded to CAAV on 7 and replied by CAAV on 20 October establishment of Hanoi Flight Procedure Office (FPO) under the JICA Project any relevant subjects 11:30-13:30Lunch 13:30-15:00Preparatory Discussions with CAAV & VATM Counterparts (continued) *Attendance of CAAV & VATM Counterparts who are involved in Project Output 1, including TF-1 Leaders and Members, is essential. 11

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Wednesday, 26 08:30-11:30PBN Flight Procedure Design Seminar at CAAV (Room 211) 11:45-13:30Lunch hosted by JICA 13:30-15:00PBN Flight Procedure Design Seminar Thursday, 27 09:00-11:30Discussions with Vietnamese Stakeholders (CAAV, VATM, NAC/MAC/SAC, VAA, Airlines, MONRE) (Room 211 in CAAV) PBN Capability Survey based on Questionnaire establishment of Hanoi Flight Procedure Office (FPO) under the JICA Project any relevant subjects 14:00-17:00ATC Facility Visit (Noi Bai Airport & Hanoi ACC), by JICA Experts and Stakeholders participants 12

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Friday, 28 09:30-11:30Submission of Summary Report to CAAV (Venue will be arranged by CAAV) 14:00-15:00Report to JICA Office (Experts only) *Attendance of CAAV Representative (Mr. Dinh Viet Thang, Deputy Director General) and Project Counterpart appropriate to review the contents of the Summary Report submitted by JICA Experts, and then receive the Report is essential. Additional attendance of VATM Counterparts who are involved in Project Output 1 is desirable. 13

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Wednesday, 26 08:30Registration (Room 211 in CAAV) 09:00Opening Remarks by Mr. Dinh Viet Thang, Deputy Director General, CAAV, as the Project Director Remarks by Representative of JICA Vietnam Office 09:15Session 1: Overview of Activities and Programs relating to PBN under “the Project for the Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam” (JICA Project Leader) 09:45Session 2: PBN Planning and Implementation in Japan - Roles of Civil Aviation Authority as the “Regulator” in Leading PBN Implementation (JICA Expert) 10:30Coffee Break (arranged by CAAV) 10:45Session 3: Roles of Flight Procedure Designers as the Service Provider in Flight Procedure Design in Japan- Services, Organization, Qualification/Certificate and Training (JICA Expert) 14

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Wednesday, 26 11:15Session 4: Vietnam PBN Roadmap (CAAV/VATM) 11:45Lunch at Restaurant “Nhat Viet” (hosted by JICA, transportation arranged by CAAV) 13:30Session 5: PBN To Improve Flight Efficiency in Japan (JICA Expert) 14:00Session 6: Flight Procedure Design Implementation in Japan- Situational Awareness, Flight Procedure Design, and Quality Assurance System (JICA Expert) 14:30Session 7: Questions and Answers 14:45Summary 15:00Closing Remarks by Mr. Dinh Viet Thang, Deputy Director General, CAAV MC: Mr. Nguyen Cong Long (CAAV) & Hiroshi Inoguchi 15

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Vietnamese Counterparts will understand the ideal Flight Procedure Design process through PBN FPD Seminar; 2.Vietnamese Counterparts will clearly recognize actual status and the issue to be challenged to achieve PBN Roadmap; 3.JICA Project will conduct succeeding training programs on PBN FPD implementation more efficiently; 4.Project Goal, transition to new CNS/ATM Systems, would be facilitated efficiently and effectively. 16

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.PBN Flight Procedure Design Seminar and Capability Survey was successfully conducted in Cambodia (17-19 October) and Lao PDR (20-24 October); 2.In Cambodia, there were 30 participants from all Stakeholders in PBN, representing SSCA, Air Navigation Service Provider (CATS), Airlines (3), Airport Operator (SCA), and Government Geographical Agency (MLUC); 3.In Lao ODR, there were 33 participants from all Stakeholders in PBN, representing DCA, Air Navigation Service Provider (LATM), Airlines (3), Military (Air Force), Airport Operator (LAA), and Government Geographical Agency (NGD); 4.Active participation by all resulted in completion of Survey based on Questionnaire in time and meaningful information exchange between Stakeholders and JICA Experts. 17