CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.

Slides:



Advertisements
Similar presentations
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Advertisements

Construction Engineering 221
ISTISNA’.
THE PARTIES TO CONSTRUCTION-RELATED PRIME CONTRACTS Construction-related prime contracts involve owners, architect/engineers, construction managers, and.
Contracts – important issues
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
It the responsibility of the executive head of your state agency to maintain the property records of those assets under the control of the agency. This.
M.A. Young and Company 1 This is a slide show Just click your mouse button on the bar to the right each time you want to move to the next slide. Use your.
Renting vs. Buying Housing. Rental Terminology Landlord Owner of property –Expects rent to be paid on time and for tenant to keep the property in reasonable.
CONSTRUCTION ADMINISTRATION Bids and Proposals Dr. Alaattin Kanoğlu I.T.U. Faculty of Architecture Spring, 2013 Professional Practice Management I.B.U.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Chapter18 Contract Construction 1CE 417, King Saud University.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Revenue Audits Returns processed in a “non-judgemental” manner Revenue Audit of selected returns. Objective is to promote voluntary tax compliance. Audit.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Time for a new standard - AS General Conditions of Contract
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Project Close Out CTC-470.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
Conditions of the Contract for Construction
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
1 Extended Duration Warranties, Performance Warranties, and Liquidated Damages in Construction Contracts – What are the Risks? Presented by: Gene Rash.
Contract price & payment
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
Financial Statement Basics Roy Williams – FHA Deputy Chief Underwriter.
CONSTRUCTION ADMINISTRATION Changes and Extra Work in Construction Management Dr. Alaattin Kanoğlu Spring, 2013 Professonal Practice Management I.B.U.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Chapter 6 Liability Insurance. What is Liability Insurance? There are many different types of insurance policies available, but liability insurance is.
CONSTRUCTION CONTRACTS – MASTER CHART
Landlord and Tenant Business Law I Mrs. Oddo. What is a Lease? Lease: An agreement in which one party receives temporary possession of another’s real.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
TYPES OF CONTRACTS.
Chapter 15 Payments. Payments typically made monthly. Retainage typically withheld (5% - 10%) Project payment: –series of periodic payments –single final.
CDA COLLEGE BUS235: PRINCIPLES OF FINANCIAL ANALYSIS Lecture 10 Lecture 10 Lecturer: Kleanthis Zisimos.
CONSTRUCTION ADMINISTRATION Claims and Disputes Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CHANGE WORK ORDER A change work order may be issued by implementing official any increase or decrease in quantities of original work items in the contract.
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Measurement and Payment
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Warranties Review Questions.
Administration of a FIDIC Contract - Project Control
Design-Build Acquisition and Contract Incentives July 19, 2018
ARCH 435 PROJECT MANAGEMENT
Find the Problems with the Provisions May 11, 2016 Presented By:
Presentation transcript:

CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program ARCH_472

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS2 Outline Acceptance of work Gurantee period Contract time Liquidated damages for delay Cleanup The Punch List

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS3 Acceptance of work Acceptance of the work and final payment to the contractor must proceed in accordance with the terms of the construction contract documents. Although the methods may vary somewhat from job to job basically they all begin with a request from the contractor to make a final inspection of the work.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS4 Acceptance of work Generally there may be at least two inspections required to close out the project. The first will establish those areas still requiring correction or other remedial work, and the final inspection will be a checkoff to assure that all work is substantially complete and that all corrections have been made.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS5 Acceptance of work The checkoff list or Punch List as it is normally called, is a detailed list made near the end of the project, showing all items still requiring completion or correction before the work can be accepted and a Certifcate of Completion issued. Before acceptance, all workmanship must meet specified standards, all work must be installed and complete, and all equipment must be tested and operational.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS6 Acceptance of work In some cases it is possible to accept a project as being “substantially complete” if only minor items remain to be finished. This simply means that the project is close enough to being completed that it can be put to use it was intended, and that all remaining incomplete work is comprised of relatively minor items that the contractor agrees to correct while the building is occupied.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS7 Gurantee period Generally, the work covered in a construction contract includes a stated guarantee period, which is frequently one or two years. In some cases, the overall project may be guaranteed for only one year, although certain portions of the work may be covered by supplementary guarantees for longer periods.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS8 Gurantee period Although some contracts call for 100 percent of the performance bond to be continued in force during the entire guarantee period, many contracts allow for a reduced portion of performance bond to cover any defects noted during the guarantee period.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS9 Gurantee period After all, if the project is 100 percent complete, there is little reason to believe that it will all fail. Thus, many such bonds are reduced to 10 percent or some other reduced percentage of the performance bond during the guarantee period.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS10 Contract time When computing contract time, particular attention should be paid to the contract wording – is it “calendar days” or “working days”? The easiest time to compute is calendar days, as this method includes all days, including saturdays, sundays and holidays. Normally, construction time is computed from the date on the written Notice to Proceed given to te contractor at the beginning of the job.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS11 Liquidated damages for delay On many projects, where time is the essence of the construction, the owner and the contractor agree under the contract terms that if the contractor fails to complete the project by the stipulated date, it is financially liable to the owner for a preagreed sum of each day beyond the specified completion date that it takes the contractor to finish the work.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS12 Liquidated damages for delay This amount of money represents the financial losses to the owner for such delays, and because it is difficult to determine the real values of the owner’s losses, the preagreed sum is used in lieu of a determination of the actual actual damages suffered.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS13 Liquidated damages for delay This assessment is referred to as Liquidated Damages, and it is common practice throughout the construction industry to require that the contractor pay the owner this fixed sum of money for each calendar day that it exceeds the specified date of completion.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS14 Cleanup The constructor is obligated to clean up the construction site thoroughly at the end of the job before the work can be accepted. The final clean up is of significantly greater proportions than previous clean up work during the progress of the work, as all of the various items of demobilization rightfully are included under the clean up category.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS15 Cleanup This includes removal of temporary utilities, haul roads, temporary fences, field offices, detours, stockpiles, surplus materials, scrap, replacement of landscaping where it had been temporarily removed, street cleaning.

Dr. Alaattin Kanoglu, I.T.U. CONSTRUCTION MANAGEMENT & ECONOMICS16 The Punch List Theoritically, if every trade performed its work in strict compliance with the contract requirements and the best of craftsmanship, what is known as a Punchlist might never have come to exist.