CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Construction Contracting
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
INFORMED DECISIONS SURETY BONDS OR BANK LETTERS OF CREDIT 2013.
Session 8 Implementing PPPs
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Surety Bond Claims State of Colorado 05/15/2013. State of Colorado Surety Bond Overview Construction Contract Surety Bonds  Bid – Guarantees bidder will.
Facts About Lending The Cost of Credit. Consumer Credit Transactions Consumer Credit Sales – Finance the purchase of goods or services (autos, furniture,
Presented By: John D. Miller
JOINT VENTURES General Contractors’ Risk Management Perspective.
SURETY BONDS Managing the Risk of Contractor Default.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
CIVL202 Construction Engineering I
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
CIVL202 Construction Engineering I Tutorial 10 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
CIVL202 Construction Engineering I Tutorial 6 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Conditions of the Contract for Construction
PROCEDURES FOR SELECTING THE CONTRACTOR
Chapter 17 Construction Bonds Vanessa S. Werden
Construction Engineering 221 Contracts & Contractor Procurement.
Construction Engineering 221 Cost Estimating and Bidding.
111 Con E 221 Review graded exams on Monday Review presentation guideline for term papers Finalize presentation schedule on Monday.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Risk & Responsibility Understanding Contract Surety Understanding Contract Surety.
FAR Part 28 Bonds and Insurance. What is a Bond? Promise by a third party (the Surety) to fulfill the contractor’s responsibilities or compensate the.
Surety Bonds The Sensible Choice For Managing Risk.
Surety Bonds The Sensible Choice For Managing Risk.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Insurance & Bonding for Contractors February 2, 2009 Presented by: David Hale Hale & Associates, Inc. Fairbanks, Alaska.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
US SMALL BUSINESS ADMINISTRATION SURETY BOND GUARANTY ASSISTANCE PROGRAM Mark S. Romanak CIC The Brower Insurance Agency LLC April 20, 2004.
Surety Bonds Managing the Risk of Contractor Default.
An-Najah National University Graduating project II Delay in construction projects.
The Contractor Development Program
Construction Contracts and Project Delivery Methods
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
Providing Outsource Services Introduction Outsourcing is a great way for a company to fill a temporary need or to hire expertise they may not have within.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
4/28/2003CVEN Maxwell 1 Job Site Issues Module October 14, 2015.
CIVL202 Construction Engineering I Tutorial 5 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
LAUSD Boot Camp: Construction Bond Basics Presented by Patty Zenizo Preferred Bonding & Insurance Services September 11, 2013.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
King Fahd University of Petroleum & Minerals
Construction Engineering 380 Design Contracts. Design contracts are agency relationships Making “estimations” of an individual’s ability to perform Negotiate.
CONSTRUCTION CONTRACTS DOCUEMENTS
Joint Venture Agreements. Joint Ventures Joint Venture (JV) : Two or more construction contractors jointly competing for a particular project pooling.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
CHANGES AND WHAT THEY MEAN FOR YOU 2013 EJCDC CONSTRUCTION DOCUMENT SERIES Matthew Skidmore, P.E. NC AWWA-WEA 95 TH ANNUAL CONFERENCE.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Investment Protection For Today’s Construction Lender.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Surety Bonds The Sensible Choice for Managing Risk.
The Basics of Bonding & The Contractor Development Program Presented By: Navid Barkhordar.
Debts Recovery in Romania. INTRODUCTION Recovering a debt can be a complex process everywhere, for every business, regardless of the industry. The Romanian.
Request For Proposals. Request for Proposals Book 1 Contract Book 2 Project Requirements Book 3 Applicable Standards Reference Information Documents (RID)
FIDIC Tendering Procedures
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
Workshop for Architects, Engineers & Construction Contractors
Contractor Review and Prequalification
Lesson 13.2 The Home-Buying Process
Understanding The Benefits Of Surety Bonds
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
Directed Change Constructive Change
Presentation transcript:

CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50

Tutorial Outlines Performance Bond Payment Bond Cost and Requirement for Bonds Acceptance Period Award of Contract Contract Agreement Time extensions Rework Change Orders

Performance Bond Definition: A bond that protect the owner against default on the part of the contractor in performing the project as required Issued after award of contract Issued to pay for the damage to the owner Damage: time or money

Payment Bond Definition: protects the owner against any unpaid charges as a result of contractor’s default Issued after award of contract Issued as a kind of short-term financing for a contractor with financial difficulties

Cost and Requirement for Bonds Bonding capacity Definition: The amount that a bonding or surety company is prepared to put at risk in the bonds that it writes for the construction professional. Multiple of the net quick asset Usually, the more reliable the contractor, the greater value the multiple is

Acceptance Period Objective: to protect the bidders Prior to bid opening, bidders can withdraw without any penalties, but bidders cannot withdraw after bid opening After bid opening, there is an acceptance period of days If the owner do not act within the acceptance period, the bidder can withdraw and adjust the bids

Award of Contract Notification of award Time extensions Damage for failure to complete the project on time Duration If there are barriers to restrict the entry of construction site, letter of intent will be sent

Contract Agreement Formalized to sign a contract agreement Covers drawings, general conditions, supplementary conditions, technical specifications, addenda

Time Extension Claims for delays led by circumstances beyond contractor’s control, e.g. by owner, owner’s agent, acts of God Large percentage of delays are related to design-related problems

Rework Definition: Carry out the same job more than one time Can be caused by: site activities, ineffectiveness of prior project phase

Change Orders Changes during construction lead to alteration of original contract document Can be caused by poorly scoped or prepared contract document or changed conditions of the project Changed conditions: e.g. undetected subsurface conditions or any other conditions which are not detected during design phase