Overview of Transit Signal Priority Program in King County Prepared by Transit Signal Priority Unit.

Slides:



Advertisements
Similar presentations
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Advertisements

The Downtown Seattle Bus Monitoring System Collecting and Analyzing Transit Travel Time Data Owen Kehoe, PE, PTOE King County Metro Transit : Seattle,
Overview What is the National ITS Architecture? User Services
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.
WMATA Bus ITS Project Update Transit Signal Priority Briefing to the Traffic Signals and Operations Working Group April 21, 2005.
Network Design and Implementation
Los Angeles County Metropolitan Transportation Authority (Metro) Metro’s Countywide Signal Priority Program T3 Webinar January 22, 2008.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. Agenda  National Perspective  OGL Video Overview  Mid – America Regional Council  Program Elements  What.
Transit Signal Priority Work Group Report 7/30/13
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
ECM Project Roles and Responsibilities
TSP Must Fit Within An Overall Agency ITS Plan. Transit Priority Data Needs Vehicle Location –Speed Door & Lift Status –Predictions Passenger Counting.
Customized Simulation Modeling Using PARAMICS Application Programming Interface Henry Liu, Lianyu Chu & Will Recker.
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
Transit Priority Systems (TPS) Chun Wong, P.E. City of Los Angeles, Department of Transportation T3 Webinar.
1Prepared by AC Transit Service Development Transit Signal Priority For the San Pablo Rapid Bus.
Evolving TSP to meet the needs of the ITS community 1.
Web Development Process Description
Project Management Process Overview
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
ADAPTIVE SIGNAL CONTROL TECHNOLOGY MODEL SYSTEMS ENGINEERING DOCUMENTS 1 December 20, 2012.
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Transit Partnerships. Goal of Presentation Review the Transit Partnership Proposal Seek Ordinance Approval: –Authorizing the Mayor to submit Transit Partnership.
Traffic Management Transit Management Emergency Management Fixed Point-to-Fixed Point Communications Roadway Toll Administration Remote Traveler Support.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
Transit Signal Priority (TSP): Deployment Issues and R&D Needs as Identified by Practitioners Hallie Smith Brendon Hemily.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
Traffic Management System Status Update February, 2008.
Chapter 12 The Network Development Life Cycle
Overview of King County Transit Signal Priority Program T3 Webinar January 22, 2008.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
State of Georgia Release Management Training
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
The Indiana Local Technical Assistance Program Local Agency Perspective Neal Carboneau, PE Research Manager.
Gastonia Transit Expansion Study City Council/Planning Commission Joint Transportation Workshop September 13, 2007.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
Enterprise Content Management Owners Representative Contract Approval
Description of Revision
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
Department of Licensing HP 3000 Replatforming Project Closeout Report
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
PLANNING A SECURE BASELINE INSTALLATION
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Overview of Transit Signal Priority Program in King County Prepared by Transit Signal Priority Unit

Transit Speed & Reliability Program The Speed & Reliability Program at King County Metro makes capital improvements designed to improve transit performance. Most projects are in partnership with local cities, and are coordinated with larger projects. Typical improvements include: Bus zones: upgrades, relocations, consolidations and bus bulbs Trolley overhead modifications Roadway improvements: HOV/BAT lanes, parking removal Intersection improvements: turn radii, queue jumps Traffic signals: timing and signal phasing, and Transit Signal Priority

Goals for Transit Signal Priority (TSP) Increases amount of “green” time at intersections for selected bus trips Decrease average travel time Decrease variation in travel time Reduce signal related delay Minimize impact on general traffic

TSP Operating Philosophy Conditional priority rather than hand pre-empt Maintain signal coordination Concept of “green time” as a scarce resource led to Transit Priority Request System

Background on TPR System Selection Functional specifications developed by Regional Oversight Committee (ROC) Used negotiated Procurement process: price consideration but no low bid selection process Contract awarded to McCain Traffic for system development, integration and testing 99% read accuracy required Final contract closeout scheduled for December 2001

TPR Field Equipment

TPR Field Components Tag Antenna TPR Generator Tag Interface Unit for Dynamic Data Reader Cabinet

TPR Tag Interface Unit (TIU) Supplies route/run from AVL system to TPR system Dynamic data enables trip level discrimination TIU is interim arrangement until full feature “Smart Bus” is available TIU does not supply data relocated to passenger schedule

TPR Transponder “Tag” Amtech slot tag MHz “spread spectrum” band Field disturbance device 128 bit data packet: –system– run –agency– trip –vehicle ID– class –driver ID– lateness –route– ridership No input by driver required

TPR Antenna Log-Periodic (pictured) –unobtrusive –suitable for most applications Yagi (not pictured) –Used for longer range applications

TPR Reader Functions: –Detect tag –Acquire tag and validate data –Transfer data to interface unit

TPR Request Generator - specifications Compact size –8.5” wide, 8” deep –5.25” tall Serviceable –Connections at front panel PC-104 bus –Environmentally rugged –Modular –Off-the-shelf components

TPR Generator - Functions Interfaces with traffic controller Determines if bus is eligible for priority If eligible, places a request for priority to traffic controller Stores and logs priority settings

Conditional Priority Requests Issued by TPR Generator Request based upon –Time of Day –Frequency of Request –Vehicle ID –Bus Direction –Route Information –Lateness (Future) –Ridership (Future)

TPR Data Files Settings –Time of Day plans (TOD) –Eligible Vehicle Tables (EVT) Logs –Operations Logs –Transponder (Tag) Logs

TPR System Flow Diagram

Roles and Responsibilities in Initial TSP Implementation Traffic Jurisdictions –Participate in selection, approval and design of TPR installations –Approve the TSP Operating Plan –Establish transit priority control strategy that will be implemented –Insure that its traffic control system has the required functionality Transit Agency –Propose location for TPR equipment and develop draft TSP Operating Plan –Support traffic engineer in evaluation/selection of TSP. compatible traffic control equipment –Lead final design effort or approve final PS and E documents for TPR system

Roles and Responsibilities in Initial TSP Implementation - continued Traffic Jurisdiction –Establish frequency with which buses can request priority –In future, further discriminate calls based on passenger loads and schedule adherence –Set “budget” for green time for buses within signal timing plans Transit Agency –Determine which vehicles/trips will be eligible for performance –After initial activation, monitor system performance and request adjustments from traffic engineer as needed –Update transit operation plan if required.

Roles and Responsibilities in Initial TSP Implementation - continued Traffic Jurisdiction –Optimize signal timing prior to initial implementation of TSP. –Assist in testing and acceptance of TPR system –Assist in evaluation and adjustment of initial TSP settings Transit Agency –Lead the testing and acceptance effort for all new TPR installations –Provide system integration support –Lead effort to evaluate and adjust initial TSP settings

Roles and Responsibilities in TSP Operation - ongoing Traffic Jurisdiction –Coordinate future changes in signal timing that impact TSP intersections with transit agency –Review all proposed TSP. adjustments; accept and implement, or modify, or reject –Participate in the TSP Regional Oversight Committee –Support continued development of TSP. Functionality in traffic control system Transit Agency –Responsible for ongoing TSP system evaluation –Propose adjustments to TPR settings set by city or to TSP traffic control strategies employed by city – Convene regular meetings of a TSP Regional Oversight Committee composed of users to guide continued system development, including enhanced functionality.

Roles and Responsibilities in TPR Maintenance - ongoing Traffic Jurisdiction –Owns and maintains all TPR equipment in the street, including communication links –Responsible for power for street equipment –Coordinates repairs with transit agency in agreed upon response time –Maintain TPR equipment consistent with configuration management plan Transit Agency –Owns and maintains all aspects of the TPR system from the modem back to the server. –Maintain system access for all participants; serves as network administrator –Monitor system and notify traffic jurisdictions when field equipment is not functioning – Responsible for developing and implementing a configuration management plan

TSP Development Considerations Expect a steep learning curve with local traffic engineers; TPR/traffic control system integration is very labor intensive and highly technical TPR design is a highly interactive process; –adjustments in bus stop spacing/ location may be required to make TSP feasible –availability of interconnect, poles and power are limiting factors; city’s ability/willingness to provide interconnect significantly impacts cost –Rf field surveys are required to site and order TPR equipment

TSP Development Considerations - continued Few local consultants are familiar with TPR system design requirements Need to insure that existing traffic control cabinets have space for TPR equipment Need to secure commitments that traffic engineer will “exercise” TSP in a manner that makes a TPR investment worthwhile O and M issues should be resolved as part of the up front project planning/financing

Overview of TSP System Development Community Transit, Everett Transit and King County Metro will all utilize Rf-based bus detection developed by McCain; Pierce Transit will use Opticom Metro KC is prepared to administer the TPR Management System for King County O and M principles/expectation have been established for all active TSP projects sponsored by King County Metro

Overview of TSP System Development - continued City of Seattle and King County have operating experience with initial installations; King County is funding a Traffic Technician for the City of Seattle to support new TSP installations over the next 2 years KC Metro has a contract with Econolite to add improved TSP functionality to the AC2 controller; deliverables are due in July, 2002 City of Seattle is leading effort to improve TSP functionality in the Eagle and PEEK controllers Bellevue has added TSP functionality to their Computrans traffic control system and will first apply it to a two intersection demonstration that is under development

Overview of TSP System Development - continued King County has put a TPR parts contract in place with McCain Traffic; McCain Traffic has agreed to supply this equipment to any public agency for the same terms. –Equipment prices and escalation factors are set for a period of 3 years. –King County will insure that the parts list is kept current –All pricing has been subject to a FTA compatible cost/price analysis –Agencies must exercise this option within the constraints of their own purchasing rules and regulations. King County has a new contract with McCain for enhancements to the TPR system; new functionality will be added in modules over a period of two years. Development priority will be given to those modules that can improve TSP performance.

Project Design Issues Renton TSP First Ave S TSP

Project Design Issues continued Renton TSP

Project Design Issues continued First Ave S TSP