ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
Contractor Assurance System AC Overview October 13, 2009.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Contractor Management and ISO 14001:2004
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Developing a Chemical Risk Management Program
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
1 The Standards Based Management System Approach to Deploying the Environmental Management System at Oak Ridge National Laboratory Dr. Fay Frederick, Division.
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
An Overview of Environmental Management Systems (EMS)
Occupational Health & Safety Management at IREL Units A.K.DAS G.M. (Safety & Env.) Corporate Office, Mumbai.
Ship Recycling Facility Management System IMO Guideline A.962
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Occupational Health and Safety
Engaging Contractors in the Environmental Management System (EMS) Department of Energy EMS Workshop: Implementation, Lessons Learned, and Best Practices.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
QA Requirements for DOE Accelerator Safety System Software K. Mahoney Group Leader, Safety Systems TJNAF Presented at the 2008 DOE Accelerator Safety Workshop.
QUALITY ASSURANCE TRAINING DOE O 414.1C AND 10 CFR 830, SUBPART A
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Hazards Identification and Risk Assessment
Industrial Risk Control
Safety Stand Down – Together We Will Make the Difference.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Software QA Safety Systems at SLAC Enzo Carrone Controls Department – Safety Systems SLAC National Accelerator Laboratory.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Environmental Management System Implementation. Practices, Aspects, Impacts- Concepts Mission Resource Impact Resource Impact Activities/ Operations Practices.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Sonya Barnette, DOE-HQ Office of Quality Assurance Policy and.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
OHSAS Occupational health and safety management system.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
APTA Rail Transit SMS Implementation Guide June, 2016.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.

Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
GS-R-3 vs. ISO 9001:2008 Requirements - 4
Flooding Walkdown Guidance
Training Course on Integrated Management System for Regulatory Body
HSE Case: Risk Based Approach.
Communication and Consultation with Interested Parties by the RB
Regulatory Oversight of HOF in Finland
Chemical Purchasing.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project

Bio  Tom is the Assurance Manager for the DOE SRS Salt Waste Processing Facility Project, and has also served as the ISMS & Assessment Manager, and Environmental Manager  Tom received his M.S. and Ph.D. at UT a couple of decades ago and has worked in the DOE environmental restoration/waste management arena since

Introduction  Integration: To bring differing elements or parts together as one.  Management System: An organization’s documented set of policies, plans, procedures, programs devised and implemented to obtain mission objectives  Problem Statement: How and what does the contractor need to do, if anything, to affect direction to integrate ISMS and QMS?

Requirements  DOE O 414.1C: The Quality Assurance Program (QAP) “Integrates, where practicable and consistent … with other … management system requirements … including... DOE P 450.4, Safety Management System Policy.”

Bring Together QMS & ISMS?  Obvious points of overlap: Corrective Action, Management Assessment, Training and Qualifications... HOWEVER: QA/QC is concerned with Items and Services QA/QC is concerned with Items and Services ISMS is about Protecting the Environment, the Worker and the Public ISMS is about Protecting the Environment, the Worker and the Public

D D Site Facility Activity Site Permits Security Emergency Management Facility Permits PDAS FHA ALARA Analysis JHA SWP NCSE Waste Management The ISMS – QMS Relationship Varies with Scope

Where they Diverge  QA and ISM diverge at the Activity Level  Activity-level ISMS finds little commonality with QA elements such procurement document control, item receipt inspection, design control, etc.  The controls delineated in NQA-1 find scant utility in the development of a JHA or a pre- job briefing

Where they Merge  QA/QC and ISM Converge at the Facility- Level ISMS  Quality in the nuclear business has its origins in facility safety : 10 CFR 50, Appendix B

QA/QC Assures Flow Down of Design Requirements  Nuclear or High-Hazard Facilities: ISMS - QMS become one for safety-related SSC Design Design Acquisition Acquisition Receipt Receipt Installation Installation Maintenance Maintenance Operation Operation

Safety Basis Protection  PDSA and DAS define performance & functional requirements for credited SS/SC SSC  The facility Design Basis translates performance & functional requirements into specific design requirements: Drawings, Data Sheets, Specifications, Receipt Inspection Criteria Packages, Commercial Grade Dedication Packages, Inspection Test Plans, etc.  QA/QC’s primary function for Nuclear Facility (particularly design build) is to assure documented fidelity between the design requirements and the received and installed SSCs

Latent versus Active Hazards  QA/QC is of modest utility when considering active hazards, i.e., occupational safety and health  QA/QC was conceived to protect the environment, the worker and the public when considering latent hazards   NQA-1 - Condition adverse to quality: “... A significant condition adverse to quality is one which, if uncorrected, could have a serious effect on safety or operability.”

Analyze Hazards/ Define Controls  PDSA  FHA  Shielding Models  ALARA  Emission Models  Code Review Assure Acceptability - Work within Controls  Design Control  Document Control  Control of Items  Control of Services  Test Control  Procurement Doc Control  Control Non Conforming Items  QA Records Feedback for Improvement  Design Review  Audits  Management Assessment  Condition Reports  NCR  Corrective Action Define Scope  Design Input  Contract  Codes of Record  Specs  Drawings  Data Sheets ISMS Documented System QAP Design Phase ISMS QMS ISMS at Facility Level is QMS with Hazard Analysis

What Do We Integrate?  A robust QMS will assure safety-related systems meet design requirements  Design Controls assure SC/SS SSC functional and performance requirements flow down to the design requirements  QMS fits under the ISMS: QA/QC is a functional area no different from Nuclear Safety, Radiation Protection, Environmental Protection, Industrial Hygiene, etc. Each needs individual focus with integration to produce a safe product (e.g., waste treatment facility, power plant, processing facility). QA/QC is a functional area no different from Nuclear Safety, Radiation Protection, Environmental Protection, Industrial Hygiene, etc. Each needs individual focus with integration to produce a safe product (e.g., waste treatment facility, power plant, processing facility).

It’s The Management System...  NUREG-1055, 1987 Report to Congress Commercial nuclear quality failures in the 1970s and ‘80s resulted not from poor QMS Commercial nuclear quality failures in the 1970s and ‘80s resulted not from poor QMS Failures resulted from broader Management System weakness touching all aspects of the organization Failures resulted from broader Management System weakness touching all aspects of the organization We need to focus on THE MANAGEMENT SYSTEM from a holistic perspective We need to focus on THE MANAGEMENT SYSTEM from a holistic perspective

Human and Process Elements  Organizational performance is a function of processes and the qualities of the personnel  I contend that no organization can conduct complex missions successfully w/o a Management System containing the basic elements of ISMS

Human Element Guiding Principles (GP)… Approximately 1.Organizational priorities: Safety/Quality, Schedule, & Cost (GP4) 2.Authorities and Accountabilities (GP1) 3.Responsibilities and Functions (GP2, CR1) 4.Competencies & Qualifications (GP3, CR2) 5.Communication: Includes SCWE, HPI (The too often neglected “I” in ISMS) DOE O 414.1C : CR = Criteria 1 – 10,

Process Elements Core Functions (CF) + 2 Guiding Principles Approximately 1.Define scope and requirements: CF1, GP5 2.Analyze the risks (hazard if probability = 1): CF2 3.Tailor risk control strategies based on consequences or probabilities: CF3, GP6, CR4, Graded Approach 4.Verify that risk controls are in place: CF4, GP6 5.Authorize the activity within defined risk controls: GP6 6.Conduct activities based on controls and scope: CF4, CR5, 6, 7 7.Evaluate and measure performance: CF5, CR3, 8, 9, & 10 8.Improve based on performance analysis: CF5, CR3, 8, 9, & 10

It’s Not Just About Safety  If an organization with a complex or hazardous mission is not following the management system elements for major aspects of their endeavor – not just safety – it’s heading for performance problems if not failure

Conclusions  If the correct policies, plans and procedures are in place to support ISMS & QMS, then integration should be implicit and passive versus explicit and active.  Integration needs to be explicit and active between organizations and disciplines responsible for the identification, design, acquisition, acceptance and installation of safety-related SSC