Detector Cooling Project Thermosiphon Project Status Report

Slides:



Advertisements
Similar presentations
Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Advertisements

M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Pierre Bonneau EN/CV/DC
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Chiller control system Lukasz Zwalinski – PH/DT.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Cooling System Solutions
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Full Scale Thermosiphon Risk Assessment Lukasz Zwalinski PH/DT/PO - Cooling.
60kW Thermosiphon control system
Michele Battistin Elena Perez Rodriguez 10 November 2010
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Kirill Egorov Indiana University 20 October, th Thermosyphon Workshop 3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit”
Installation of the T600 at Fermilab CSN2, September 22,
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
TE-CRG Activities D. Delikaris, TE-CRG.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
ATLAS ITk Baby-DEMO update
He Plant, LN2 Systems and Commissioing
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Francois and Lau EATM 17 July 2012
ATLAS Thermosiphon Readiness Review 17th March 2016
M. Battistin CERN EN/CV/DC 9th July 2009
ATLAS Thermosiphon Electrical Distribution and Run Modes
Status of the cryogenic system for B180
Low temperature chiller Market Survey
Status of CO2 Cooling tests at CERN for Pixel phase 1
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Detector Cooling Project Thermosiphon Project Status Report Michele Battistin EN/CV/Detector Cooling 14/12/2011 M. Battistin

Agenda Basic schematics Review process Integration Main Components Risk Analysis Project Management Cost tracking Planning Resources 14/12/2011 M. Battistin

Basics schematics R23 C3F8 H2O Real P&I EDMS 1101188 R404a 14/12/2011 C6F14 brine circuit Normal operation -65°C to -70°C Warm operation -15°C to -20°C liquid tank Water condenser Normal operation evap. Cascade condenser R404a R23 Surface USA15 cavern C3F8 H2O Warm operation evap. Air condenser UX15 cavern Real P&I EDMS 1101188 ATLAS ID Detector 14/12/2011 M. Battistin

Reviews process 14/12/2011 M. Battistin 1st Thermosiphon review: 6th July 2009 Pre-design and general lines of the project. Indico agenda and documents here. 2nd Thermosiphon review: 1st October 2009 Detailed design for the 2 kW Thermosiphon, mini-thermosiphon and blends. Indico agenda and documents here. 3rd Thermosiphon review: 28th May 2010 Advancement status of Thermosiphon project, oil free centrifugal compressors and sonar sensor. 4th Thermosiphon review: 19th of November 2010 Project Readiness Review. 5th Thermosiphon review: 20th of October 2011 Project advancement. 14/12/2011 M. Battistin

Integration: Point 1 overview Condenser Location Chiller and Brine Station Location SX1 SDX1 SH1 SUX1 PX15 USA15 14/12/2011 M. Battistin

Thermosyphon Piping and By-pass components SDX1 Piping connection to condenser SDX1 PX15 Pipe route to PX15 pit 72m vertical pipe line Thermosyphon by-pass By-pass integration on platform USA15 Components location 14/12/2011 M. Battistin

Water and Brine Circuits 14/12/2011 M. Battistin

Integration documentation status Approval Status Condenser integration EDMS 1141928 v1 Under Approval C3F8 pipe integration EDMS 1155062 v1 Approved Chiller & Brine Pumps Integration EDMS 1157706 v1 Electrical Requirements EDMS 1159012 v1 Electrical Cabinet Integration EDMS 1166645 v1 USA15 Integration EDMS 1164037 v1 Water Circuit Integration EDMS 1162726 v1 Brine Piping Integration EDMS 1166643 v1 Brine piping calculation specifications EDMS 1164132 v1 14/12/2011 M. Battistin

Chiller Construction Schedule Chiller: 170kW @ -70°C Chiller Construction Schedule Technical Specifications (Done) Market Survey (Done) Invitation to Tender (Done) Purchase Order (Done) Chiller Construction (On going) Contract started: 10% Completed (September 2011) Design phase completed 20% Completed (October 2011) Construction of the Chiller 30% On going (December 2011) Delivery and Installation at CERN 30% Planned to January 2012 Commissioning at CERN 10% Planned to June 2012 14/12/2011 M. Battistin

Thermosyphon Condenser Condenser Construction Schedule Technical Specifications (Done) Request for Quotation (Done) Purchase Order (Done) Condenser Construction (On going) Contract start: October 2011 Detailed design: November 2011  Purchasing of material: January 2012 Condenser construction: March 2012 Final pressure tests: May 2012 Insulation of the condenser: May 2012 Delivery at CERN: June 2012 14/12/2011 M. Battistin

Hydraulic Components Selection All project working documents on SharePoint Part list (reference #, order status, cost, specs, etc) Components Selection Criteria Fluids: Fluorocarbons C2F6, C3F8, C6F14 Pressure: PN16, PN40, DESP 97/23EC approval Temperature: 20°C to -70°C. Cryo extension Material: Stainless steel, flat metallic gasket, no fluorinated plastic Leak tightness: General 10-7 mbar.l/s Cleaning: every part degreased, driers, 1µm filter Safety: Twin relief valves with 3 ways valve, Deported sensors, Double switches on valves EDMS 14/12/2011 M. Battistin

Electrical Installed Power Surface – SX1 Underground – USA15 14/12/2011 M. Battistin

Risk Analysis 1. Usage limits Operating phases and procedures (2kW Thermosiphon) Control system (overall architecture) System users (accesses control) 2. Time limits (continues operation) 3. Space limits (Point 1, USA15, B3184 roof) 4. Other limits (properties of cooling fluids) Determination of the system limits Hazard identification – identifying the hazards and environmental aspects occurring in normal and exceptional conditions Risk estimation Risk evaluation 14/12/2011 M. Battistin

(New version with updated P&ID in work) Risk Analyses Considered: 240 hazards 202 hazardous events 76 individual components in 7 groups 98 risk reduction proposals mechanical, electrical and control failures included EDMS 1165951 document under approval EDMS 1165951 (New version with updated P&ID in work) Medium [A3, A4, B2, B3, C1, C2, D1] Unacceptable risk: actions are necessary to reduce the risk. 14/12/2011 M. Battistin

Cost and Planning – Earned Value Management Responsibility and Resources Matrix Project Breakdown Structure Conceptual design report Definition Project breakdown structure Equipment coding convention PBS Work breakdown structure List of working units WBS & WU’s Resource responsibility matrix RRM Work units dictionary WU Planning Project coordination schedule 14/12/2011 M. Battistin

Cost Tracking Cost rise from 2010. Last budget presented to ATLAS management on 08/2011. Chiller N2 is not accounted. Cost are constantly tracked on EVM. The project has negative cost variance The project has negative schedule variance 14/12/2011 M. Battistin

Planning Extended Technical Stop interference 14/12/2011 M. Battistin Time Autumn 2011 Winter 2011/2012 Spring 2012 Summer 2012 Autumn 2012 Winter 2012/2013 Design and integration Complete detailed design and integration Chiller system Manufacture Supply and installation Brine circuit Integration Tendering Installation connection Tank/condenser Contract signature C3F8 piping Design and Supports installation Installation of the pipes By-pass Detailed design Purchase of material Construction USA15 installation Instrumentation and control Functional analysis Purchase of hardware Programming Program tuning Electricity and Pneumatic installations Study the requirements Cupboards construction and installation Commissioning Tests with by-pass Tests with detector Extended Technical Stop interference 14/12/2011 M. Battistin

Conclusions The TS detailed design is well advanced The equipment integration is still an important open issue. We shall start and operate the 2 kW to obtain insight for the functional analysis. Chiller construction is under-control. Condenser order has been sent. Support Piping installation is going to start In general the project is late and needs extra-resources to get the target date (Dec 2012): one Catia draftsman for 2 week to finalize 3D integration. one member of ATLAS ID collaboration will be welcome to join the team. a polish technician team for the assembly of the hydraulic part. resource to develop the PVSS/UNICOS control system shall be guaranteed. A workshop shall still be identified to give space and tools or the assembly! 14/12/2011 M. Battistin