1 INPC07, Tokyo, June 8th Present Status and Future Prospects of the ITER Project N. Holtkamp June 8, 2007 INPC07, Tokyo.

Slides:



Advertisements
Similar presentations
ITER Organization, Cadarache, France
Advertisements

Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Extension of IEA Implementing Agreement on Large Tokamak Facilities Presented to Committee on Energy Research Technologies October 18-19, 2005 Paris, France.
Office of Central Integration and Engineering
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
EFDA Fusion Roadmap Status of implementation Francesco Romanelli EFDA Leader.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
ARIES-General Page 1 Summary of Findings of Lehman Committee to Assess ITER Costing L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.
1 Brief Status of ITER TBM A High-Level Ad Hoc Group (AHG) met April 10-11, per request of the ITER Council. In that meeting, Parties intentions were stated,
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
Activities and Strategy in Japan on Fusion Technology for DEMO Hiroshi Horiike Osaka University Graduate School of Engineering Fusion Power Associates.
ITER International Team 16th ANS Topical Meeting on Fusion Technology
ITER The past, present and future 1985 to 2007 Garry McCracken.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
Overview of Fusion Research Activities in Japan Presented by Masayoshi SUGIMOTO (JAEA) IAEA’s Technical Meeting on Nuclear Data Libraries for Advanced.
Norbert Holtkamp, October Status of the ITER Project Norbert Holtkamp Status of the ITER Project Norbert Holtkamp Principal Deputy Director General.
Report of the Burning Plasma Program Advisory Committee S.C. Prager November, 2003.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
General Overview of the Korean Domestic Agency Procurement Activities K. J. Jung ITER Korea (KODA) National Fusion Research Institute.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
25th JET Anniversary 20 May 2004 Prof. D.Palumbo“Setting JET on track” Setting JET on Track Prof. Donato Palumbo Honorary General Director Research EURATOM.
Overview of U.S. Preparations for ITER Ned Sauthoff Fusion Power Associates Washington, DC November 19, 2003 Positioning the US to achieve its Burning.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
ITER Control System Technology Study Klemen Žagar
Exploring Magnetically Confined Burning Plasmas in the Laboratory AAAS Annual Meeting Ned Sauthoff February 18, 2005 “Yearn to burn” “Burn to learn” Marshall.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
1 Subprojects of IFERC K.Lackner (as Chair of IFERC Project Committee) Garching – 14 Apr 2011.
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
Fusion Energy Sciences Program Department of Energy Perspective February 23, E xcellent S cience in S upport of A ttractive.
Report on Developing Industrial Cost Estimates for ITER Systems of Possible Interest to the US For Discussion with FESAC Gaithersburg, MD March 5, 2003.
Norbert Holtkamp, October The Engineering Challenges of ITER The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
ITPA12 Diagnostics - PPPL - 3/26-30/07 1 US ITER Project Plans David Johnson Diagnostics Team Leader March 26, 2007 ITPA12 Design Basis US Scope Port Plugs.
Workshop EU Fusion Roadmap April 13-15, 2011, Garching, Objective 1 STAC AHG Report on Objective 1: ITER construction Workshop EU Fusion Roadmap, April.
12th Mttg ITPA Diagnostic TG, PPPL, 26-30/3/07. 1 A E Costley ITERO, Cadarache, France 12th Meeting of the ITPA Diagnostic Topical Group Princeton Plasma.
EIROforumSchool on Instrumentation A. Murari May 2013, CERN. JET: the European Fusion Device Andrea Murari EFDA-JET Close Support Unit EIRO School.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
ITER-China Project Huo YuPing PT Leader, ITER-China Chief scientist.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
In-Kind Contributions Workshop – IKCW ITER Status of In-Kind Procurement Helium (3,5 MeV) Neutron (14,1 MeV) Deuterium Tritium Ken Blackler Construction.
O. Kester, NuSTAR annual meeting, 27/02/2013
Fusion: The Energy Source for the XXI Century Mohamed Abdou Distinguished Professor, Mechanical and Aerospace Engineering Department Director, Center for.
US Participation in the
Introductory Remarks and Meeting Goals
JET Programme in preparation of ITER
The European Power Plant Conceptual Study Overview
ITER & Expectations for Fusion Research in the Next Quarter Century
VLT Meeting, Washington DC, August 25, 2005
Proposal submission and evaluation
The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006 Norbert Holtkamp, October 2006.
Fusion for Energy & ITER Contribution to EU Added Value
Presentation transcript:

1 INPC07, Tokyo, June 8th Present Status and Future Prospects of the ITER Project N. Holtkamp June 8, 2007 INPC07, Tokyo

2 INPC07, Tokyo, June 8th ITER – the way to fusion power ITER (“the way” in Latin) is the essential next step in the development of fusion. Its objective: to demonstrate the scientific and technological feasibility of fusion power. The world’s biggest fusion energy research project, and one of the most challenging and innovative scientific projects in the world today.

3 INPC07, Tokyo, June 8th ITER history (CDA) Conceptual Design Phase –Start of common activities among EU,RF, USA and JA –Selection of machine parameters and objectives (EDA) Engineering Design Phase –Developed design capable of ignition - large and expensive –The Parties (EU, JA, RF, US) endorsed design but could not afford to build it 1999 – 2001 – (EDA continues) –US withdraws from project –Remaining Parties searched for less ambitious goal –New design: moderate plasma power amplification at about half the cost now (CTA and ITA) –End of EDA and start of negotiations on construction and operation –4 site offers, US re-joins, China & South Korea are accepted as full partners. –Cadarache selected as ITER site ( ), India joined in Dec 2005 –Agreement initialised on May 24, 2006

4 INPC07, Tokyo, June 8th Mutual trust is our greatest asset Ceremony ITER Agreement Signature, Elysee Palace, 21 November 2006

5 INPC07, Tokyo, June 8th Construction Sharing Overall sharing: EU 5/11, other six parties 1/11 each. Overall contingency of 10% of total. Total amount: 3577 kIUA (5079 Euro-2007) European Union CN IN RF KO JP US Total procurement value : 3021 Staff: 477 R&D: 80 Total kIUA: 3577

6 INPC07, Tokyo, June 8th Construction Cost Sharing C “Contributions in Kind” Major systems provided directly by Parties B Residue of systems, jointly funded, purchased by ITER Project Team A Systems suited only to Host Party industry - Buildings - Machine assembly - System installation - Piping, wiring, etc. - Assembly/installation labour Overall costs shared according to agreed evaluation of A+B+C Overall cost sharing: EU 5/11, Others 6 Parties 1/11 each, Overall contingency up to 10% of total.

7 INPC07, Tokyo, June 8th ITER – Key facts The current ITER building Cadarache Site Designed to produce 500 MW of fusion power (tenfold the energy input) for an extended period of time Will bring together most key technologies needed for future fusion power plants 10 years construction, 20 years operation 5 years deactivation Cost: 5 billion Euros for construction, and 5 billion for operation and decommissioning

8 INPC07, Tokyo, June 8th JET (1983) Q<1 t=1s Pfus: 16 MW R=3m Ip< 7 MA B T0 < 4T Volume: 100 m3 JET (1983) Q<1 t=1s Pfus: 16 MW R=3m Ip< 7 MA B T0 < 4T Volume: 100 m3 ITER (2016) Q=10 t=400s Q=5 t=3000s Pfus: 500 MW R= 6.2m Ip: 15 MA B T0 < 5T Plasma volume: 840 m3

9 INPC07, Tokyo, June 8th The Core of ITER Toroidal Field Coil Nb 3 Sn, 18, wedged Central Solenoid Nb 3 Sn, 6 modules Poloidal Field Coil Nb-Ti, 6 Vacuum Vessel 9 sectors Port Plug heating/current drive, test blankets limiters/RH diagnostics Cryostat 24 m high x 28 m dia. Blanket 440 modules Torus Cryopumps, 8 Major Plasma Radius 6.2 m Plasma Volume: 840 m 3 Plasma Current: 15 MA Typical Density: m -3 Typical Temperature: 20 keV Fusion Power: 500 MW Machine mass: t (cryostat + VV + magnets) - shielding, divertor and manifolds: 7945 t port plugs - magnet systems: t; cryostat: 820 t Divertor 54 cassettes

10 INPC07, Tokyo, June 8th The ITER Site Will cover an area of about 60 ha Large buildings up to 170 m long Large number of systems Tokamak building Tritium building Cryoplant buildings Magnet power convertors buildings Hot cell Cooling towers

11 INPC07, Tokyo, June 8th Integrated Project Schedule Top Down 10 years 2 years 8 years

12 INPC07, Tokyo, June 8th Procurement Sharing Example of the Procurement Sharing Agreements Copy from the “Common understanding of procurement sharing”

13 INPC07, Tokyo, June 8th The Scope, the Schedule and the Cost of ITER The Schedule: begin construction in 2007 and have first plasma In The Construction Cost: kIUA (~5.000 M€) –Including 80 kIUA R&D –Including 477 kIUA Project Team Reserve: 358 kIUA on request by NDG Operations Cost for 25 years: 188 kIUA/year Deactivation for 5 years: 281 kIUA Decommissioning: 530 kIUA (host responsibility)

14 INPC07, Tokyo, June 8th Main Management Structure of the ITER IO See detailed chart

15 INPC07, Tokyo, June 8th New Proposal of Long Term Staffing during Construction 2250 professional years and 1860 support staff years consistent with 477 kIUA Smooth transition to operation

16 INPC07, Tokyo, June 8th Cadarache & Environs

17 INPC07, Tokyo, June 8th Site preparation site clearing access to the site ©AIF Main entrance Secondary Access

18 INPC07, Tokyo, June 8th Site preparation site clearing

19 INPC07, Tokyo, June 8th Contractors’ Area

20 INPC07, Tokyo, June 8th Design Review The first goal for 2007 is to create a new Baseline Design 2007 which –Confirms or redefines the physics basis and requirements for the project –Is the basis for the procurement of the long lead items (Vacuum Vessel, Magnets, Buildings), –provides input for the Preliminary Safety Report The second goal is to base the ITER design decisions also in detail on a broad basis by involving the worldwide fusion community (physics and engineering) –Thus the Fusion community and the parties can take ownership of the project The third goal is to broaden the knowledge basis into the parties which is essential for a successful procurement of the ITER components in kind –A significant part of technical coaching of industry and of the QA will rest with the Domestic Agencies (DAs) For components and systems which are procured at a later date or for issues with lower priority work will continue into the year 2008

21 INPC07, Tokyo, June 8th Design Review is performed by 8 Working Groups ~150 members (see Web Site ) Web Site Web Site WG-1 Design Reqs. & Physics Objectives. Chair: P.Thomas; IO D.Campbell WG-2 Safety and Licensing Chair: J-P Perves; IO J-P.Girard WG-3 Site and Buildings Chair: C.Strawbridge; IO J.Sovka WG-4 Magnets Chair: M.Huguet; IO N.Mitchell WG-5 Vacuum Vessel Chair: Songtao Wu; IO K.Ioki WG-6 Heating and Current Drive Chair: J.Jacquinot; IO A.Tanga WG-7 Tritium Plant Chair: D.Murdoch; IO M.Glugla WG-8 In-Vessel Components Chair: Igor Mazul; IO M.Pick/C.Lowry The membership consists of the leading experts of the fusion community in each party The groups have written manifestos explaining the scope of their work (see ITER technical web) In order to solve issues work packages have been agreed with the parties based on the work plans established by the design review working groups (80PPY)

22 INPC07, Tokyo, June 8th ITER Issues (Link: ITER Issues Data Base ) ITER Issues Data BaseITER Issues Data Base ~ 200 issues existed for several years but were for different reasons not solved or rejected Another ~ 250 were added by the parties last autumn when the design review process started Thus ~ 450 issue cards existed when the design review working groups were formed in December of 2006 and started their work At the moment we have 411 ongoing issues 186 issues require consideration by more than one group

23 INPC07, Tokyo, June 8th Roles and Responsibilities for Construction ITER OrganizationSeven Parties Planning / Design Integration / QA / Safety / Licensing / Schedule Installation Testing + Commissioning Operation Detailing / Designing Procuring Delivering Supporting installation Conformance

24 INPC07, Tokyo, June 8th DG DAs Technical Work Tasks & R&D Proc. Arrangement IO – DAs collaboration scheme Config. Mngmt. ITER Engineering Departments Project Office Safety Security QA PDDG Field Teams Proc. Control

25 INPC07, Tokyo, June 8th The First Procurements: Magnet 1.1 MagnetsPkgIssue Date Toroidal Field Magnet Windings 1A & 1B Jan-08 Toroidal Field Magnet Structures 2A & 2B Jan-08 Magnet Supports2CJan-08 Poloidal Field Magnet 1 & 63AJan-08 Poloidal Field Magnets 2, 3, 4, 5 3BJan-08 Correction Coils3CJan-08 Central Solenoid Magnet 4A & 4B Jun-08 Feeders5AJun-08 Feeder Sensors5BJun-08 Toroidal Field Magnet Conductors 6A Aug- 07 Central Solenoid Magnet Conductors 6BOct-07 Poloidal Field Magnet Conductors 6COct-07

26 INPC07, Tokyo, June 8th Magnet Conductor cables tested in 2006 showed substantial degradation Ongoing field- cycling stress tests showing very promising results Tentative Conclusions The OST strand is significantly more sensitive to strain than EAS. The long twist pitches provide better strand support than short. This is critical for OST, not for EAS. With OST small changes in strand support can provoke major performance degradation –question on OST strand suitability for CICC Questions for further investigation (1) The TFPRO1-EAS1 leg performs better than TFAS-EAS leg. Why? Possibilities are: Higher joint resistance in TFAS is distorting interpretation. Overload of TFAS (high BI combination) at start of test. Comparing BI plots implies degradation model, not justified for different conductors

27 INPC07, Tokyo, June 8th Three equatorial ports are available for TBM testing Up to six different types of TBMs, with independent ancillary systems, could be simultaneously tested: Further time and space sharing not technically viable. TBM R&D and Testing Program: Exploitation of ITER Summary of minimum Members’ requests on TBM leadership Party Ceramic Breeder TBM Liquid LiPb TBM Liquid Li TBM CN1 HCCBDFLL EU1 HCCBHCLL IN- LLCB JA1 WCCB KO HCSBHCM RF (Li/V) US (DCLL) Total 43+(1)1+(1)

28 INPC07, Tokyo, June 8th The TBMs first wall is recessed of 50 mm and protected with a Be layer Shield plug Frame TBM Location TBM TBMs tests need a whole TBM system TBMs Arrangement in ITER and Interfaces TBM ports

29 INPC07, Tokyo, June 8th JT-60 Fusion Plasma Research Tokamak DEMO Reactor ITER ITER&DEMO Physics Support Activities Component Technology Test Blanket Module Blanket Technology Heavy Irradiation IFMIF Structure Development Structural Material Dev. Fusion Engineering Research JT-60 Superconducting Coils The Present and the Future Road Map to Fusion DEMO Reactor

30 INPC07, Tokyo, June 8th ITER Cadarache Satellite Tokamak International Fusion Energy Research Center DEMO Design and R&D Co-ordination Center DEMO Design and R&D Co-ordination Center ITER Remote Experimentation Center ITER Data Acquisition and Analysis Setting Experimental Parameters IFMIF-EVEDA IFMIF Fusion Computer Simulation Center Check of experimental conditions, Machine Control, etc International Fusion Energy Research Center

31 INPC07, Tokyo, June 8th

32 INPC07, Tokyo, June 8th Summary ITER is worldwide one of the largest, if not the largest scientific project. It is the first project based on “in kind” contributions to such an extent. While ITER is supported in many ways by CEA and Europe, it is also a “green field” site, which means the creation of a new international organization. With ITER and the Broader approach DEMO is well on its way to become the final step for implementation of fusion power as a reliable source of energy.