Air / Sound Lock Iso-Booth Mix Tape EFX Step Up ~18” Raised floor in CR Glass GLASSGLASS Bulkhead Plate with inputs to board below glass EFX rack also.

Slides:



Advertisements
Similar presentations
Common Components of a Traditional Wood Framed Building
Advertisements

YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. INTRODUCTION HOW DOES A CONTAINER BECOME HOUSE? DESIGN EXAMPLES A NEW HOME IN 12 STEPS TECHNICAL SPECIFICATIONS.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Barracks Safety.
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
IRC 2009 Habitable Attics.
Zone Valves.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
ACOUSTICAL FOAM PANELS ANTHONY andTORREFIEL. Acoustic foam is an open celled foam used for acoustic treatment. It attenuates airborne sound waves by increasing.
Residential Construction Unit 6 Interior finishes Mr. Todzia.
Wall and Ceiling Construction Vocabulary
One Level Paradise 212 Kennedy Lane in Powdersville Lovely one level, well-built custom home with workshop, one step entry from garage. Powdersville area.
Exploring CAD - Architectural Electrical Design. OVERVIEW TWO COMPONENTS –POWER –LIGHTS Power to House –Meter –Distribution Panel Box.
Constructing Homes and Other Buildings
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
ANALOG STUDIO SETUP Basic Overview of Recording Studio I/O.
What we would like to accomplish. In order for us to move forward from a technical stand point we need to make some serious changes in the audio systems.
HVACR116 – Trade Skills Mechanical Drawings.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Balloon Frame North-American invention, 1833
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Insulation and Infiltration
EXAMPLE ELECTRICAL DESIGN OF A SMALL OFFICE
Common Components of a Traditional Wood Framed Building
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
Minimizing Structural Energy Loss Andrew Layman Lisa Phillips.
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Keeps heat indoors in winter and outdoors in summer – means lower heating and cooling bills Rated by it’s R-value. The greater the R- value the better.
Wall and Ceiling Construction
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
CONSTRUCTION Housing Starting Out Building standards are set by: 1) State Agency 2) Federal Agency 3) Local Agency.
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Machinery Cooling Water System Locations and Operations.
Band: MiraCosta MTEC’s Event Date: February 13, 2014 Venue: Studio A Music Hall 1 Barnard Way, Oceanside, Ca Contact: Eric Clemens ( )
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Southeast Financial Center
SIZE - Top SERVER ROOM Designed by – openbox |
CONSTRUCTION Housing Starting Out Building standards are set by: 1) State Agency 2) Federal Agency 3) Local Agency.
APPLICATIONS OF TECHNOLOGY
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
Learning Outcome Lesson Objective
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
Eliminator 38 Pounds 19,100 BTU’s 200 CFM 15amp outlet compliant amps per heat elements Precise Temperature Settings Years of Field Testing Listed.
APPLICATIONS OF TECHNOLOGY
Energy loss in the home Insulation method including cost and saving
Components of Construction part 2
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Energy loss in the home Insulation method including cost and saving
Common Components of a Traditional Wood Framed Building
Common Components of a Traditional Wood Framed Building
Southeast Financial Center
APPLICATIONS OF TECHNOLOGY
Center for Advanced Technology and Training CATT Room Instruction Demo
Objective 6.02 part 2: Recognize components of construction
Boiler Room Atmospheric Boiler Power Boiler.
Wood Frame Systems Civil Engineering and Architecture®
Kiosk Discussion May 23, 2017.
International Building Materials and components
Common Components of a Traditional Wood Framed Building
Sound Attenuator (UPC-26C)
Adding Zones to Existing Systems
Common Components of a Traditional Wood Framed Building
Building standards Mr. Da Silva.
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Air / Sound Lock Iso-Booth Mix Tape EFX Step Up ~18” Raised floor in CR Glass GLASSGLASS Bulkhead Plate with inputs to board below glass EFX rack also had three Crown D-75 amps, one for CR; one for main; one for isolation. Speakers JBL Century L-100 in main; Yamaha NS-10 in CR & Iso-Booth Monitoring Avion-16 24’X24’ Stand alone garage w/o car 16’ door Glass Door Drum Riser A 110vac breaker panel was in the air-lock. All 110vac outlets on wall between control room and the main room. Each duplex outlet had its own 15A breaker. All wiring was accessible VIA panels in wall. There was quad outlets each on its own breaker, behind the EFX (and amps) rack in the wall to eliminate power strips and extension cords

Heat A/C Iso-Booth 24’X24’ Stand alone garage w/o car 16’ door The walls were 10’ tall. The control room ceiling was about 6’6” above floor. The entire HVAC unit sat upon rafters above top of the control room on an isolated floor. All return air and supply grills entered and exited in about a 1’ space although the attic space was much higher

Glass to control room Door is to Iso booth Door is to air lock Looking at CR from studio

Ext finish Int finish Batt insulation laid in. It does get crunched up on one side but no big deal Walls 8”2”X6”