Horst Breuker AIDA March,29 2012 WP6 TA to Testbeams and Irradiation at CERN AIDA units : 600 in Testbeams; 200 in Irradiation Facility; 1 unit = 1 day;

Slides:



Advertisements
Similar presentations
Status and future measurements on Micron detectors Outline: Irradiation and measurement in dry atmosphere Measurements in vacuum.
Advertisements

Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
V. Re 1 INFN WP3 Microelectronics and interconnection technology WP3 AIDA meeting, CERN, May 19, 2010 Valerio Re - INFN.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
P. Tropea for the PH-DT CO 2 team CO 2 CERN 11 March 2015 CO 2 cooling activities in PH-DT.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Susanne Kersten, Wuppertal University November 21/22, 2013.
L. Serin LAL/Orsay/IN2P3 EUDET Meeting01/10/101 Organization & status of the project EUDET  LC activities in AIDA Conclusion
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
23 July 2012 Thoms Bergauer (HEPHY Vienna) Sensor Irradiations and Testbeams 12 th B2GM Bad Aibling.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
Joint Meeting ATLAS-CERN Detector Group / PH-Detector Technology Group Overview of the PH-DT group: Group Structure Current Projects Services White Paper.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association INSTITUT FÜR EXPERIMENTELLE KERNPHYSIK
Diamond detectors for the LHCb upgrade M. Artuso, A. Borgia, J. Garofoli, R.Mountain, P.Urquijo, J. Wang, Z. Xing 5/5/20101Marina Artuso Velo Upgrade Meeting.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
ATLAS Inner Detector MO_B 2012 closure 2013 mid-year status 2014 request H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
Report from Accommodation Facilities meeting ACCU A.Rozanov Outlook Accommodation Facilities meeting Patrick Geeraert, Chris Onions,
CMS Pixel upgrade test-beam summary (T992) Lorenzo Uplegger, Ryan Rivera for the CMS pixel upgrade collaboration 1.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
CERN Test Beam Update and Schedule
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
NA61 vertex detector Status update from RBI effort Tome Anticic Ru đ er Bošković Institute.
STANDING COMMITTEE ON APPROPRIATIONS BRIEFING 2011/12 EXPENDITURE Date: 29 August 2012.
Chris Parkes, Silvia Borghi, Christoph Hombach WP2 Alignment Task: Status Report Introduction Alignment Monitoring – LHCb VELO Weak Modes – LHCb VELO AIDA.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
Service Management Status 101 th ACCU Meeting Wednesday, September 11, 2013.
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
Breuker Feb Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
Georgia Gateway - Integrated Eligibility System (IES)Update
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
5 th Spanish Workshop on Future Accelerators IFIC, Valencia Oct I. Vila IFCA (CSIC-UC) Advanced European Infrastructures for Detectors at Accelerators.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Pixel 3D Sensor Test Beam Analysis
KIT TA Status Felix Bögelspacher, Bärbel Bräunling, Wim de Boer, Alexander Dierlamm Prof. Dr. Max Mustermann | Name of Faculty.
Test beams future plans - Discussion session-
Report on Transnational Access in AIDA2020 WP 10, 11, 12
Micro-channel Cooling
June 22, 2017 Burkhard Schmidt for the DT coordination team
WP8 – Improvement and equipment of irradiation beam lines
HR-HV CMOS activities and plans at Glasgow
Cooling Service and R&D activities
BOND/QART Lab and Pixel R&D
European Detector R&D: AIDA
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
EU Institution Board 1 representative of each participating institute
CERN Testbeam facilities
Use Appropriate Hashtags Maximize Emojis Engage with Users.
Production Scorecard Production Scorecard Production Scorecard
Update on ATLAS insertable B-layer
HEC-EMEC Test Beam Software
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Presentation transcript:

Horst Breuker AIDA March, WP6 TA to Testbeams and Irradiation at CERN AIDA units : 600 in Testbeams; 200 in Irradiation Facility; 1 unit = 1 day; Reimboursement : 138 CHF/day x person (Subsistance) + max 400 CHF/travel x person; WP6-TA is operational, with appropriate communications and a selection board; WP6 is still in agreement with the projected schedule concerning the allocated budget; The total budget is CHF.

Horst Breuker AIDA March, Applications 2011 Received and accepted : Belle II Silicon Vtx CALICE T3B ATLAS IBL CALICE W-AHCAL ATLA Planar Pixel LHCb VELO ATLAS BCM TIME PIX ATLAS Planar Pixel (2 nd team) ATLAS Diamond Beam Monitor

Applications 2011 cont NA63 BGO CALICE SDHCAL CMS SIBT Horst Breuker AIDA March,

Applications SPEC CALICE MMEGAS FastRPC Horst Breuker AIDA March,

Marie-Laure : Statistics 2011 Project Number and Name Persons per project (maximal 8) Users supported 64 (160 foreseen) Units of access 512 (600 foreseen) Horst Breuker AIDA March,

Irradiation Facility application (rejected); Users do not have to be present during Irradiation (Facility operated by CERN); Initial lack of advertisement; Communication is more complicated than for test beam users; this is the reason for the delay; Should improve for AIDA year 2. Horst Breuker AIDA March,