1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Spring COPC 2008 FNMOC, Monterey, CA 28 May 2008.

Slides:



Advertisements
Similar presentations
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Advertisements

Texas Department of Information Resources Presents
PKE PP Mike Henry Jean Petty Entrust CygnaCom Santosh Chokhani.
Software Quality Assurance Plan
4/29/2009Michael J. Cohen1 Practical DIACAP Implementation CS526 Research Project by Michael J. Cohen 4/29/2009.
DTC AOP GSI October 1, FY09 Funding Resource/Tasks AFWA (February January 2010): – GSI code management and support (1.1FTE)
Committee for Operational Processing Centers (COPC) Update NOPC Program Council Meeting 13 June 2012 (OFCM – Silver Spring, MD) Dave McCarren WG-CSAB Chair.
Systems Engineering in a System of Systems Context
Joint Action Group for Operational Community Modeling (JAG/OCM) update Fall COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
1 COPC Shared-Network Infrastructure Brief Prepared for: COPC Working Group for Cooperative Support and Backup (WG/CSAB) October 21 and 22, 2008 Meetings.
ESDA Discussion Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Christopher P. Cabuzzi CS 591 DEFENSE INFORMATION ASSURANCE CERTIFICATION & ACCREDITATION PROCESS (DIACAP) Chris Cabuzzi, DIACAP, 12/8/10 1.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Configuration Management
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Project Management Process Overview
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
Bill Kuo Summary of DTC EC Meeting 26 th August 2010.
Working Group for Cooperative Support and Backup (WG-CSAB) Update Fall COPC 2007 John Zapotocny CSAB Chair.
Metadata for the Coupled Ocean/Atmosphere Mesoscale Prediction System (COAMPS) using the Earth System Modeling Framework (ESMF) Peter Bosler University.
NE II NOAA Environmental Software Infrastructure and Interoperability Program Cecelia DeLuca Sylvia Murphy V. Balaji GO-ESSP August 13, 2009 Germany NE.
ESMF Development Status and Plans ESMF 4 th Community Meeting Cecelia DeLuca July 21, 2005 Climate Data Assimilation Weather.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Spring COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
DTC HWRF Task AOP2009 & AOP /01/2009 Ligia Bernardet.
WG-CSAB Update Fall 2010 COPC Meeting (FNMOC – Monterey, CA) Allan Darling WG-CSAB Chair.
Earth System Modeling Framework Status Cecelia DeLuca NOAA Cooperative Institute for Research in Environmental Sciences University of Colorado, Boulder.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
Summary of EMC-DTC Meeting June 18, DTC AOP 2010 Tasks to be continued from 2009: – WRF-NMM + WPP community support (Jamie Wolff) – Reference configurations.
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
1 5. Overview of DTC Status and Annual Operating Plan WRF Executive Oversight Board Meeting 2 30 July 2004.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
Standards and Interoperability Framework Primer of S&I Phases, Procedures, and Functions.
Slides for NUOPC ESPC NAEFS ESMF. A NOAA, Navy, Air Force strategic partnership to improve the Nation’s weather forecast capability Vision – a national.
1 Report: JAG/OCM Operational Community Modeling COPC Meeting AFWA, Omaha, NB 2 May, 2007.
1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Fall COPC 2008 AFWA, Omaha, NB 13 November 2008.
1 National Environmental Modeling System (NEMS) Status M. Iredell and EMC Staff.
1 2. Overview of WRF Program Status WRF Executive Oversight Board Meeting 2 30 July 2004.
WG-CSAB Updates Spring 2013 COPC Meeting (FNMOC, Monterey, California) November 20-21, 2013 Dave McCarren WG-CSAB Chair.
Toward GSI Community Code Louisa Nance, Ming Hu, Hui Shao, Laurie Carson, Hans Huang.
State of Georgia Release Management Training
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
WG-CSAB Update Fall 2008 CDR Mark Moran, NOAA WG-CSAB Acting Chair.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Spring CSAB 2011 Mr. Evan Kuchera JAG/OCM Chair.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
WG-CSAB Update Spring 2010 COPC Meeting Allan Darling WG-CSAB Chair.
Developmental Testbed Center: Governance highlights
DSC Change Committee UK Link Future Releases Proposed Approach
Software Configuration Management
Proposed SysML v2 Submission Plan
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Outcome TFCS-11// February Washington DC
Outcome TFCS-11// February Washington DC
IS&T Project Reviews September 9, 2004.
Executive Project Kickoff
A brief introduction to NEMS
Presentation transcript:

1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Spring COPC 2008 FNMOC, Monterey, CA 28 May 2008

2 JAG/OCM membership Status of initiatives 1. COPC AI : IA Status at DTC 2. COPC AI : Requirements, timeline, and milestones for convergence of mesoscale NWP to ESMF end state 3. Status update: DTC management & resources 4. Implementation plan for IEMCO: Initial steps Overview

3 NWS – Nelson Seaman (Chair)* FNMOC – Roger Stocker AFWA – Evan Kuchera NAVO – Frank Bub NRL/MRY – Pat Phoebus (temporary) NRL 7300 (Oceanog. Div., Stennis) – Steven Payne JAG/OCM Membership *Term ends Feb Changes in JAG membership since Fall 2007 COPC shown in blue.

4 1. COPC AI : IA Status at DTC Decision Request: - Recommend closure of AI - Is DTC’s IA plan acceptable? - Modifications requested?

5 Courtesy DTC, March 31, 2008 Goals for DTC Information Assurance Assure community-supported software residing at DTC is protected against common vulnerabilities. Provide procedural solutions for software certification. Document certification and authentication process. Define limits of DTC IA certification applied to public domain NWP software. – WRF software acquired from DTC may require further scrutiny before installation on systems requiring higher level of IA certification.

6 Strategy – Adapt DIACAP Standards to Community Software IA ItemComprehensive DIACAP Package Executive Package 1System Identification Profile 2Implementation Plan IA Controls – Inherited and implemented Implementation Status Responsible entities Resources Estimated completion date for each IA Control 3 Supporting Documentation for Certification Actual Validation Results Artifacts associated with implementation of IA Controls Other 4 (N/A) DIACAP Scorecard Certification determination Accreditation Determination DIACAP Scorecard Certification determination Accreditation Determination 5 (N/A) POA&M (If required) Source: PPT by Randy Gabel, MITRE Corp., 17 Aug Received from: Walt Coley, AFWA, 12 Feb. 2008

7 Courtesy DTC, March 31, 2008 System Identification Profile for NWP Community Modeling Software System Identification Components Vulnerability Baseline Public- Domain NWP Software DTC/MMM IA components include: -WRF Code Repository: - WRF (ARW & NMM) - WRFVAR - WPS - WPP - MET - Others (GSI, HWRF, etc.) -ESMF Code Repository (future) - Includes WRF science components Potential for embedded malicious codes Potential for loss of baseline code

8 Courtesy DTC, March 31, 2008 IA Controls – Inherited and New 1.Configuration management system for version control. (Inherited) WRF and associated software use SVN (subversion) for configuration management and version control. 2.Periodic backup of all baseline NWP model software. (Inherited) WRF code repository is backed up nightly. 3.Write/installation privileges limited to authorized personnel. (Inherited) WRF code repository has limited write permissions. Only authorized personnel are permitted write-access to the repository. Read-access is granted to a wider, but still limited audience. 4.Periodic review of code changes proposed to current baseline. (Inherited) Current procedures require review by the Developer’s Committee before code changes to the WRF repository are authorized. A full regression test is required prior to acceptance into the code repository. 5.Updates collected periodically to establish new WRF version. (Inherited) The WRF Release Committee establishes a new version Release based on new capabilities available from the community. 6.Initial line-by-line review and/or antivirus software check conducted on original version; System certified “clean” from malicious codes prior to release. (New) A proposal has been made by AFWA to share system/software scanning capabilities. DTC/MMM would implement a source code scan as part of the WRF regression test suite. Status is TBD. 7.Future ESMF-based repository to be managed in similar way. (New)

9 Courtesy DTC, March 31, 2008 DTC IA Implementation Plan/Schedule Identify IA officer at DTC/MMM. – July 2008 Enhance logging/reporting data of current IA practices at DTC/MMM. – FY09 Attend training for source code scanning tools at AFWA. – Provided by AFWA, date TBD Install and configure source code scanning tools at DTC/MMM. – TBD+3 mo. following training/availability of scanning tools Integrate source code scanning tools into regression test framework. – TBD+9 months Generate reports and certification documents from scanning tools. – TBD+12 months (continued, next slide)

10 Courtesy DTC, March 31, 2008 IA Supporting Documentation Write documentation for IA Plan – September 2008 Maintain logs of primary IA activities - A certification report would be provided with each major release of the WRF and/or ESMF public domain software covering… Code installation and update log Code certification log User identification and authentication log

11 Define requirements, timelines and milestones for convergence of limited-area NWP codes to ESMF end state. 2. COPC AI : ESMF end state Decision Request: - Recommend closure of AI - Does JAG/OCM’s assessment of way forward to ESMF end state satisfy COPC requirements? - Modifications requested?

12 ESMF Gridded Unstructured Nested-Grid Development: Fields Grids Infrastructure Regional NMMB: Dyn. Phys. I/O NAM In-Core HWRF HWRF/HYCOM Applications: (NCEP) Core Grid Nesting ARW: Dyn. Phys. RR In-Core HRRR (GSD) Core Grid Nesting ARW: In-Core ESMF-ARW (AFWA) Grid Nesting ESMF Development Path/Milestones Note: Milestones and timelines are subject to change. Boldface font represents operational date. COAMPS ® : In-Core I/O COAMPS /NCOM /Waves /HYCOM 1 (Navy) Grid Nesting COAMPS ® is a registered trademark of the Naval Research Laboratory. 1 Navy’s use of ESMF is primarily as a superstructure for coupling models. ? ( ) Coupled COAMPS coupled with…

13 Support of ESMF-Based Models to the NWP Research Community DTC in Boulder anticipates supporting the ESMF Framework and community NWP models run operationally under ESMF. User support expected to lag ~1-2 years behind operational implementation. WRF and ESMF code repositories will be maintained in parallel until the WRF repository is obsolete (no longer needed by either research or operations).

14 3. Status of DTC Management/Resource Plan Management Plan:DTC Charter - Briefed to WRF ExOB (July 2007); 1 st revisions added (Aug. 2007) - AFWA, NCAR, NWS and OAR agree to become signatories. (July 2007) - 2 nd round of review/revision completed (Sept. 2007) - 3 nd round draft distributed (Nov. 2007); no comments received. - NOAA legal opinion concluded Charter does not require formal legal review. (Mar. 2008) - All other WRF agencies (NRL, OON, ARL, FAA) have agreed to the 4-party Charter (by ), but decline to sign. (Apr. 2008) - Charter distributed (7 April 2008) for pre-sign briefing to agency signatories and final revision, as needed. Suspense date: 4 May. - Last step: Final approval and signing (before 1 July 2008). Resourcing: NOAA-NCAR Cooperative Agreement (CoOp Ag) - NOAA reviewer comments received; NCAR responses given (2 May ’08). - CoOp Ag provides mechanism to transfer govt. resources directly to NCAR/DTC. Information only

15 4. Implementation Plan for IEMCO Initial Steps Decision Request: - Does COPC concur with JAG/OCM’s planning for IEMCO implementation? - Modifications requested?

16 JAG/OCM IEMCO Planning: Initial Steps - Grid type - Vertical coordinate - Map projection - Framework (ESMF, other) Note – Items in purple give an example of a particular model-alignment initiative in IEMCO. Review IEMCO document to identify… - Model category(global, limited area, ocean, space) - Project element (e.g., align global ocean models, limited-area ensemble) - Project type(operational implementation, pathfinder project) - Source model(NOGAPS, HYCOM, NAM, etc.) - Provider & user(s) (e.g., NAVO  NCEP, NCEP  AFWA) - Target date (identified in IEMCO, or TBD) Prioritize elements & identify technical POCs Establish deliverable requirements for each element - Variables to be delivered - Formats & compression - Horizontal & vertical resolution - Temporal frequency of outputs Coordinate comms requirements with JAG/CCM - Dataset size - Delivery schedule - Cycle frequency (e.g., 4 X day)

17 CategoryProject Element Project Type Source Model Target System ProviderUserTarget Date Priority Global NWP Global ensemblePathfinderNOGAPSGENSFNMOCNCEPDec Limited-area ensemble PathfinderNOGAPSNAEFSFNMOCNCEP Limited-area ensemble PathfinderNOGAPS, Others? JEFSFNMOCAFWA Limited- Area NWP Align CONUS windows OperationsNAMNCEPAFWA, FNMOC Dec High Align OCONUS Guam windows OperationsCOAMPSFNMOCNCEP Deconflict DoD OCONUS windows OperationsWRF, COAMPS AFWA, FNMOC FNMOC, AFWA IEMCO Planning Table – Draft – Part 1 of 2

18 CategoryProject Element Project Type Source Model Target System ProviderUserTarget Date Priority Oceans Align global ocean models OperationsHYCOMNAVONCEP Align global coastal ocean models OperationsNCOPNAVONCEP Align global wave models OperationsWW-III Ensemble NCEPFNMOC Align global wave models OperationsWW-III Unified Ensemble FNMOCNCEP, NAVO Space Wx Physics-based Space Wx model R & DNCEPAFWA Physics-based Space Wx model R & DAFWANCEP IEMCO Planning Table – Draft – Part 2 of 2

19 IEMCO Implementation Roadmap Complete IEMCO Planning Table (slides 17-18), including priorities. Identify “first-guess” deliverables for each model. Estimate dataset volumes and schedules for first-guess deliverables. Work with JAG/CCM to define communications load requirements for model datasets. Draft a modeling annex to the DAPE MOA. Draft model implementation plans for highest-priority model implementations. - Consistent with modeling annex to DAPE MOA. - Similar in scope & content to WRF Joint Implementation Plan. Refine and complete modeling annex to DAPE MOA. Refine and complete each model implementation plan.

20 Questions? Decision 2:- Does JAG/OCM’s assessment of way forward to ESMF end state satisfy COPC requirements? - Modifications requested? Decision 3: - Does COPC concur with JAG/OCM’s roadmap for IEMCO implementation (slide 19)? - Modifications requested? Summary of Decision Requests Decision 1:- Is DTC’s IA plan acceptable? - Modifications requested?

21 Backups

22 Review of ESMF End State Plan Accepted by COPC, Nov Proposal: Create a new ESMF-based code repository supported to user community; gradually decommission WRF repository. WRF Software Framework: Eventually decommissioned WRF Physics Interfaces Plug-Compatible Physics ARW solver solve_em.F NMM-E solver solve_nmm.F Module_MAIN_GRID_COMP Plug-Compatible Physics coupler physics module ARW-ESMF compatible solver NMM-B ESMF compatible solver dynamics module Red dashed line denotes GSD’s ARW translation path. Note – Diagrams above are highly simplified representations of fairly complex codes. frozen Global Space Wx Ocean Wave Land Sfc. Hydrolog. ESMF Framework: Supported for research & operations

23 Proposed Steps to ESMF End State* 1. NCAR/MMM & DTC temporarily continue support for WRF repository. 2. DTC & MMM establish new ESMF-based community repository. NCEP’s ESMF-NMM-B and physics GSD’s ESMF-ARW and NCAR physics 3. Tri-agencies provide resources for ESMF-based model codes to add grid nesting, pre- and post-processing, & other WRF functions needed by users, with MMM and NOAA as lead developers. 4. MMM extends ARW as global-regional system under ESMF and supports it to research community. (TBD) 5. NCEP extends ESMF-NMM-B as global regional system for operations. DTC supports it for research use. 6. MMM decommissions WRF-CMI repository when (if) ESMF system meets critical user requirements. (TBD) * End state was presented as Option 3 in JAG/OCM report at Fall 2007 COPC

24 Summary of ESMF End State Plan Fall 2007 COPC Code Support: - NCAR/MMM & DTC share support of common ESMF-based code repository. Advantages: Protects agency investments in WRF CMI until ESMF-based system develops proven flexibility & functionality. Maintains physics interoperability, dynamics options, etc. Consistent with NUOPC’s agreed path & links to global res. commun. Maximizes leveraging of resources for system development and code support/maintenance (funding and personnel). Little immediate impact to users who want to work… - ONLY with ESMF, or - ONLY with WRF CMI. Disadvantages: Risk – Not clear that OPCs and NCAR can agree on this path or a technical design.