Superconductivity UK Dr. Philip Sargent, Diboride Conductors Ltd. Superconductivity and the electricity supply industries Sponsored by: Dept. of Trade.

Slides:



Advertisements
Similar presentations
Slide 1 Insert your own content. Slide 2 Insert your own content.
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Objectives: Generate and describe sequences. Vocabulary:
David Burdett May 11, 2004 Package Binding for WS CDL.
What Was Judy's Old School Like?
Magnesium Diboride Program Hyper Tech Research Inc. Mike Tomsic Magnesium Diboride Workshop April 2003 Research Partners: Ohio State University-LASM National.
Welcome to Cambridge Dr. Philip Sargent, Diboride Conductors Ltd.
Welcome to Cambridge Dr. Philip Sargent, Diboride Conductors Ltd.
Applied Superconductivity Research - University of Cambridge B.A.Glowacki Bartek A. Glowacki Reader in Applied Superconductivity IRC in Superconductivity.
Superconductivity UK Dr. Philip Sargent, Diboride Conductors Ltd. Commercial superconductors, Cryogenics and Transformers.
Superconductivity UK Dr. Philip Sargent, Diboride Conductors Ltd. The coming revolution in electric drives Sponsored by: Dept. of Trade and Industry,University.
HTS Wires for Energy and Magnet Technologies Superconductivity and the electricity supply industries November 27th, 2003.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
0 - 0.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
The 24-hour clock 1 12-hour clock 24-hour clock
Introducing the UK cohort and panel studies Monday 21 June 2004 Royal Statistical Society, Errol Street, London Organised by: Economic and Social Data.
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
This module: Telling the time
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
PP Test Review Sections 6-1 to 6-6
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Multiplication Tables Test 3 and 5 Times Tables 3 and 5 times tables There are 10 questions. Each one will stay on the screen for 15 seconds. Write down.
Money Math Review.
Leading Australian Curriculum: Science Day 4. Australian Curriculum PURPOSE Curriculum leaders develop capacity to lead change and support schools and.
Education. When does your school start in the morning and finish in the afternoon? (approximately)
2 |SharePoint Saturday New York City
VOORBLAD.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Applied Technology CIS-400 Central State University Prof. Hicks.
1..
Adding Up In Chunks.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Multiply Binomials (ax + b)(cx +d) (ax + by)(cx +dy)
25 seconds left…...
Mail-merge and Contact Log Shaun Elliott – Business Consultant Enhance your knowledge, improve your organisation.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
Januar MDMDFSSMDMDFSSS
Let’s take a 15 minute break Please be back on time.
Essential Cell Biology
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Welcome to the international conference “Composites Testing and Model Identification” CompTest2003 Professor Michael WISNOM, Bristol University, UK Professor.
Clock will move after 1 minute
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
& dding ubtracting ractions.
Weekly Attendance by Class w/e 6 th September 2013.
Select a time to count down from the clock above
© 2006, François Brouard Case Real Group François Brouard, DBA, CA January 6, 2006.
Presentation transcript:

Superconductivity UK Dr. Philip Sargent, Diboride Conductors Ltd. Superconductivity and the electricity supply industries Sponsored by: Dept. of Trade and Industry,University of Cambridge IRC in Superconductivity, Rolls-Royce plc, Laurence, Scott & Electromotors Ltd., Diboride Conductors Ltd., Mahseer Ltd., Qi3 Ltd.

Superconductivity and the electricity supply industries Design of superconducting generators, fault current limiters, transformers, cables, synchronous condensers Experience of superconducting device demonstrator projects for electricity supply Materials for superconducting electric supply devices Cryogenics for superconducting devices Timescales for superconducting devices to get into transmission and distribution

Superconductivity UK DTI Technology Transfer 2003 April 12 th – Camdib03 MgB October 23 rd - electric motors 2003 November 27 th – electric utilities 2004 January 30 th – (provisional)

This Morning 10:15 Welcome 10:30 Dr. Bartek Glowacki (IRC, Cambridge) 11:05 Dr. Carsten Bührer (Trithor) 11:40 Dr. Philip Sargent (Diboride Conductors) 12:30 Lunch

Afternoon 14:00 Gareth Evans (OFGEM) 14:25 Philip Sargent (Diboride Conductors) 14:55 David Klaus (V A Tech) 15:15 Peter Malkin (Rolls-Royce) 15:35 Discussion and Close 15:45 Tea