Washington Laboratories (301) 417-0220 web: www.wll.com7560 Lindbergh Dr. Gaithersburg, MD 20879 Opening the Door William H. Graff, AmericanTCB.

Slides:



Advertisements
Similar presentations
US Regulatory Process FCC Equipment Authorization Program
Advertisements

Industry Canada /strategis.ic.gc.ca Industrie Canada /strategis.ic.gc.ca March Canadian Experience with Suppliers Declaration of Conformity.
Amateur Radio Technician Class Element 2 Course Presentation ELEMENT 2 SUBELEMENTS T1 - FCC Rules, station license responsibilities T2 - Control operator.
International Telecommunication Union Accra, Ghana, June 2009 Conformance and Interoperability Testing: (WTSA-08) Resolution 76 Joshua Peprah Director,
1 Using the ILAC MRA to Gain Marketing Advantage Cheryl O. Morton, Director AIHA Laboratory Accreditation, LLC 2011 Accreditation Forum Sunday, May 15,
TRAINING FOR THE WEIGHTS AND MEASURES OFFICIAL COURSE CURRICULUM MODULE 1Introduction MODULE 2Laws & Regulations MODULE 3Enforcement Procedures MODULE.
ITU Regional Standardization Forum For Asia Pacific Region (Bangkok, Thailand, 25 August 2014) Standardization and Type Approval Procedure in Sri Lanka.
Nationally Recognized Testing Laboratories
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Cellphones and Licensed Radio Reports.
Step by Step Process. Checklist and Form Instructions A checklist is provided on the website to help applicants track their progress in completing the.
American Certification Body - Your Online Resource for Regulatory Training 1588 ENERGYSTAR®
5/10/2015TCB Council1 Navigating the FCC Online Resrouces Presented by: Chris Harvey Tim Dwyer Anne Liang.
August 8, 2005USCEL - August FCC Update William Hurst Chief, Technical Research Branch Federal Communications Commission Office of Engineering and.
Technician License Course Chapter 7 Lesson Module 15: Licensing Regulations: Terms & Working with the FCC.
1 Kentucky’s Public Safety Awareness Initiative Program Spectrum Management January 00, 2005.
Marcy Mealy Procurement Specialist CDBG Program
Conformity Assessment Practical Implications InterAgency Committee on Standards Policy June 2007 Gordon Gillerman Conformity Assessment Advisor Homeland.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15C Report.
The Newest Development of the Intellectual Property System of the Macao SAR December 11 th – 12 th, Beijing.
Industry Canada /strategis.ic.gc.ca Industrie Canada /strategis.ic.gc.ca 1 September 26, 2003, PCC.1 MRA Workshop Inter-American Mutual Recognition.
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
Dennis Ward ATCB FCC Overview. CFR 47 FCC Regulation Part 2 General Requirements Part 5 Experimental Radio Service Part 15 Subpart C, D, and E Unlicensed.
Records Management Fundamentals
Basics of Good Documentation Document Control Systems
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February.
Copyright. US Constitution Article I – Section 8 Congress shall have the power to promote the Progress of Science and useful Arts, by securing for limited.
NIMAC for New EOTs: Everything You Wanted to Know About NIMAC but Were Afraid to Ask! November 2013 Nicole Gaines.
RI Telecommunications Education Access Fund (RITEAF) RI Department of Education June 12, 2015.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15B Report.
FCC Equipment Certification / Verification / Declaration of Conformity: What They Are & What Needs Work National Spectrum Management Association Mitchell.
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
Document Control Basics of Good Documentation and
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to List a Test Site.
A cceptable U se P olicy A student’s guide to using technological tools safely and responsibly. Please see BOE Policy #7314 and Regulation #7314R * This.
National Considerations for the Preparation and Application of Conformity Assessment Procedures Conformity assessment procedures implemented by local and.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Desert William H. Graff President and Director of Engineering,
Certification Scheme for Information and Communications Equipment May 2005 Radio Research Laboratory Radio Research Laboratory Ministry of Information.
Cash Handling and Funds Collection Policies and Procedures.
HP Provider Relations October 2011 Medical Review Team.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
© 2015 Universal Service Administrative Company. All rights reserved. Direct BEAR Payment Process E-rate Program Applicant Training Washington DC Tampa.
Moveable Equipment Inventory Brown Bag February 11, 2009 Bob Marchitto Manager, Moveable Equipment Inventory ,
5/17/02month ##, 2002 Page 1 CA 101 Supplier’s Declaration of Conformity David Ling Regulatory Policy Manager Hewlett Packard Company October 15, 2002.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
The health and safety act was introduced to protect the welfare of people of the workplace. Before being introduced in 1974 it was estimated that 8.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
An Overview of the Administrative Council for Terminal Attachments (ACTA) The Federal Communications Commission’s Privatization of Certain 47 CFR Part.
Welcome! Users, Groups, Project Templates, and Custom user-defined search fields.
An Overview of the Administrative Council for Terminal Attachments (ACTA) The Federal Communications Commission’s Privatization of 47 CFR Part 68 Presented.
March 14, 2002 (revised 2/13/2002) 1 Version of CISPR 22 used in the United States by the FCC William S. Hurst Office of Engineering and Technology Federal.
AuthorizationAuthorization. Authorization Objectives To provide understanding of the authorization process and the procedures for its implementation.
Presented by: Francine Fast Horse Supply Management Officer.
Important Changes and Reminders for Fund Year 2016 E-rate Program Applicant Training November 2015.
Testing Liaison Basic Training. Who can be a Testing Liaison? ONE RULE: INSTRUCTORS AND INSTRUCTIONAL AIDES CANNOT BE TESTING LIAISONS OR PROCTORS Typically,
Tunis, Tunisia, December 2015 ITU Training Course on “Homologation Procedures & Type Approval Testing for Mobile Terminals for AFR Region”
14 March 2002Update on SDoC - USA1 Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering.
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
14 March 2002Overview of TCB ProgramSlide 1 Overview of FCC Telecommunication Certification Body Program.
Conformity Assessment Requirements to Access the U.S. Market - An Overview - Steven Bipes Program Manager – Regional & Bilateral Policy.
HIPAA Privacy What Every Staff Member Needs to Know.
Basics of the U.S. Table of Frequency Allocations
Acceptable Use Policy (Draft)
E-RATE PROGRAM APPLICATION PROCESS, PART 2
Navigating the E-rate Invoicing Process
Navigating the E-rate Invoicing Process
Basics of the U.S. Table of Frequency Allocations
IECEx MC WG07 Report WG07 – Working Group on the introduction of an IECEx Mark of Conformity Timothy Duffy Rockwell Automation Convenor – ExMC WG07.
“Homologation Procedures & Type Approval
Lesson 1: Introduction to HIPAA
Presentation transcript:

Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Opening the Door William H. Graff, AmericanTCB

Opening the Door William H. Graff oPresident and Director of Engineering o Major Chen oManager East Asia Branch Office o Jerry Lee oManager China Branch Office o o

Why are there regulations? The radio frequency spectrum is limited, natural resource. This resource must be protected from “pollution” This pollution can be either natural or man-made.

FCC 法规减少电磁干扰 FCC RULES REDUCE ELECTROMAGNETIC INTERFERENCE Radiated Conducted

1920’s American Electronics Public fascination in early experiments with voice over radio waves created a demand for radio receivers and broadcast content. Manufacturers began mass production of radio receivers in response to public demand.

Confusion in the marketplace Radio transmitters and receivers were created in a completely unregulated and immature market. Broadcasters and consumers increasingly found themselves troubled by interference.

Realization and maturity Eventually the radio spectrum became almost unusable by consumers and broadcasters Increased public awareness of interference led to political pressures.

Decisions In 1934 the Congress of the United States declared the airwaves the property of the people and created the FCC as the responsible agency for managing the radio frequency spectrum.

Fast forward to Today Today the FCC has dominion over all devices which create or use radio frequency energy within the frequency range of 10KHz to 300GHz. The core mission of the FCC remains regulating interference pollution.

Classifications Transmitters used for communication. oLicensed and protected oUnlicensed unprotected Low Power Computers and Radio Receivers. oUnintended Radio Sources Industrial, Scientific and Medical oRF sources not used for communications, but used for work

Important Exceptions FCC does not regulate safety. This is handled by private enterprise. FCC does not set consumer performance standards. FCC has in place regulations for telephone terminal equipment, but in recent years has transferred much to the private sector.

International Regulations Most other developed countries have copied in some fashion the regulatory model of the FCC. Many have included performance and safety issues into their regulatory scheme.

International cooperation Since radio waves cannot be kept within political borders, international cooperation has proven essential as equipment which utilizes RF energies has evolved. Coordination of limits and spectrum assignments has proven very useful.

A Success Story International cooperation has been greatest in the standardizing of emission limits from computing equipment. Test laboratories across the world have a nearly universal standard for characterizing unintended RF “pollution”.

Acceptance of Test Data International agreements between governments have allowed test data from one country to be accepted by another. For USA, a laboratory listed with the FCC database is eligible to submit data to be used for Certification.

Mutual Recognition Agreements MRAs take the process one step closer. They allow countries to authorize equipment on their own without the need for excessive regulation. oLaboratories in countries with MRAs with USA can perform Declaration of Conformity if accredited. For USA this equipment is marked with “FCC Logo”.

Important Note: MRA and China Since no MRA yet exists with US and China, test laboratories cannot do complete equipment authorizations on their own. However, they are still free to submit test data leading to Certification. oi.e: China laboratories cannot yet perform a DofC for the US market

Equipment Authorizations Manufacturers should be aware of the different types of Equipment Authorizations oCertification oDeclaration of Conformity oVerification

Certification Certification is a process where a product is tested to applicable FCC radio law, and the Test Report along with all applicable exhibits are submitted to an authorized agency. Documents are reviewed. If accepted, a Grant will be issued and the device will be listed in FCC database.

FCC Website and Database

What is a Grant? A Grant of Equipment Authorization is a document which shows acceptability to US radio law. It is required by Customs before a device can be imported into the USA. Grants are only issued once all Exhibits are received and approved

Required Exhibits(always) oApplication FormApplication Form oExternal PhotographsExternal Photographs oInternal PhotographsInternal Photographs oSchematicsSchematics oElectrical Block DiagramElectrical Block Diagram oOperational DescriptionOperational Description oLabel and LocationLabelLocation oTest ReportTest Report oTest Setup PhotographsTest Setup Photographs oManualManual

Additional Exhibits (rule dependent) oConfidentiality Request Letter oRF Safety Report (SAR or MPE) oRule specific attestations oParts List oTune-Up Procedure

So how does the process work? CERTIFICATION: Test Product at quality laboratory Create report with Technical Information Send report, Exhibits and Application to ATCB Receive Grant with FCC ID Number

Steps Required for New Applicant oGet an FRN o(Federal Registration Number) oGet a Grantee code o(Online cost is $55USD) oHave product tested by listed laboratory oSubmit data and all required exhibits to ATCB oAnswer questions promptly oReceive Grant oSell product

Obtain an FRN The FRN consists of a 10 digit number that uniquely identifies anyone who does business with FCC It is an important number that will be used in all transactions by the Applicant with FCC. Save it and keep it safe oStart at http: oClick on link at left side of screen oAnswer questions asked by the program

Purchase a Grantee Code An FCC ID: consists of a Grantee Code assigned by the Commission followed by 14 alphanumeric characters of the Applicant’s choosing. Any valid character 0~9, A~Z, plus “-” is acceptable. The Grantee Code is the Applicant’s unique identifier within the FCC equipment authorization database

Ready for Submission You should now have all the basic pieces for submission to the FCC using the TCB process. Kindly provide all required Exhibits along with the Test Report at your earliest convenience. Typical turn around time assuming all documents are complete and accurate should be within 3 business days or less.

Success! Once a valid Grant has been received and the Equipment Authorization process has been completed, it is now legal to sell the product in the USA.Grant

What if I try and cheat? The FCC is capable under law to make substantial penalties for any infraction of the law. These penalties can be as much as $11,000 for each item improperly sold. The FCC has as much power as Federal tax collectors (IRS) to take action against egregious violations.

Penalties can be severe Deliberate attempts to circumvent the process are viewed as serious violations. Even unknowing violations are viewed harshly. Product seizure, fines, and potential jail time are all possible.

How to choose a laboratory oLook for an Accredited laboratory. or: oLook on the FCC website for a listed lab ohttps://gullfoss2.fcc.gov/oetwl/index.html

How to choose a TCB Experience, Experience, Experience There is no substitute for experience with the FCC rules. AmericanTCB is one of the first 13 original TCBs to become operational in June, 2000 To date, we have Certified over 4000 products

Advantages of using ATCB Easy to use secure electronic internet interface Easy to track your Certification progress Archive of all your product Certification files maintained for 10 years

Support ATCB views a large portion of it’s mission is education. We hold seminars all over the world. ATCB will help you gain a clearer understanding of the FCC Rules. ATCB will happily assist in training of your staff. If you are making better filings our life becomes easier too.

Questions?