Remedial Action Schemes Reliability Subcommittee

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

NERC Policies Introduction
ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Remedial Action Schemes Application and Implementation Requirements & Performance Assessment Measures Vahid Madani Pacific Gas and Electric Co. Chair -
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
About the Operating Committee JGC Leadership Training Salt Lake City, UT May 15, 2008 Don Watkins – OC Chair (plus others)
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
NERC Critical Infrastructure Protection Advisory Group (CIP AG) Electric Industry Initiatives Reducing Vulnerability To Terrorism.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
Study Committee Representatives Annual Report December, 2012
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
WECC and NERC Protection Criteria and Standards
Reliability Standards Update
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Peak RCCo Performance Metrics Draft –November 2013.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Status Report for Critical Infrastructure Protection Advisory Group
1 Smart Grid Cyber Security Annabelle Lee Senior Cyber Security Strategist Computer Security Division National Institute of Standards and Technology June.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
NERC Standards Update Colleen Frosch ROS Meeting January 7, 2016.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 13th, 2015 Salt Lake City, UT.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Kenneth Silver Los Angeles Department of Water & Power
Transposition of European Network Codes
Phase Angle Limitations
Updates to the Path Rating Process for Approval by the PCC
Grid Integration of Intermittent Resources
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
Presentation transcript:

Remedial Action Schemes Reliability Subcommittee Vahid Madani Chair Pacific Gas and Electric, Co. WECC PCC/OC/MIC Meeting June 2004

Outline NERC Definition Application and Implementation Design development Process Standards and Compliance Schemes Reviewed by Subcommittee Subcommittee Function, Membership, and Benchmarking Efforts Wide Area Monitoring and Challenges Ahead Questions ??

Special Protection System (SPS) NERC Defines SPS: Automatic protection system (also known as a remedial action scheme) designed to detect abnormal or predetermined system conditions Take corrective actions other than and/or in addition to the isolation of faulted components to maintain system reliability. Actions may include changes in demand, generation (MW and Mvar), System configuration to maintain system stability, acceptable voltage, or power flows. Not included: (a) Underfrequency or undervoltage load shedding Fault conditions that must be isolated Out-of-step relaying (not designed as an integral part of an SPS). www.NERC.com

Planning, Application, and Implementation Increased Transfers Added Reactive Support Utilizing Reactive Supports Elsewhere in the Region Cascading Outages RAS Failure would result in: Bulk transmission system performance outside the limits of the WECC performance requirements. Impact to the Interchanges, transfers capabilities Impact to contractual agreements in terms of flows and reactive margins

Development Process Special Protection Scheme (SPS) Definition and Need Development Process Design and Analysis Tools Commissioning Functional Results Periodic Automated Maintenance Operator Training Smart Restoration Tools Need Development Process (Ease of expansion, Ease of troubleshooting, Ease of information sharing amongst control areas, automated testing) Design and Analysis Tools (resource availability and tracking) Commissioning Functional Results Periodic Maintenance (These types of schemes generally do not get many exercise to operate, the schemes are intended to be reliable) Operator Training Smart Restoration Tools (Tools to provide real-time information such as frequency and voltage, along with restoration information, effects of CLPU, etc.)

Design and Implementation Standards Establish and Document Regional Review Process For Special Protection System (SPS) installations Section III F (S1): An SPS shall be designed so that cascading transmission outages or system instability do not occur for failure of a single component of an SPS which would result in failure of the SPS to operate when required Section III F (S2): Incorrect operation or unintended operation of an SPS when considered by itself and not in combination with any other system contingency shall meet the system performance requirements as defined under categories A, B, and C of Table I of the I.A. Standards on Transmission Systems

Compliance Requirements Requirement to demonstrate that a failure of a single component of an SPS, which would result in failure of the SPS to operate when required, would not result in cascading transmission outages or system instability For worst operating condition Requirements that misoperation, incorrect operation, or unintended operation of an SPS, when considered by itself, shall meet the system performance requirements of Standard I.A. categories A, B, and C of Table I Requirements for periodic review and Regional re-certification of the process document and database

Planning Standards (Section III) Redundancy Similar to Protection and Control Standards Designed to allow equipment maintenance Designed so that cascading transmission outages or system instability do not occur for failure of a single system a SPS component which would result in failure of the SPS to operate when required The need for redundancy in SPS should be based on an evaluation of the system consequences for the failure of the SPS to operate and the need to maintain overall system reliability To meet the system performance requirements of NERC standard I.A. Standards on Transmission Systems and associated Table I

Which RAS should be reviewed? WECC Reliability Criteria: RAS required to be reviewed by RASRS are those schemes for which failure would result in bulk transmission system performance in a neighboring utility outside the limits of the WECC performance requirements RAS for which failure may result in unacceptable bulk transmission system performance within the scheme owner’s system may be reviewed at the request of the owner of the scheme or as deemed necessary by other Regional technical committees

Subcommittee Function Principal function: Promote the reliability of remedial action schemes within the WECC region by providing multidisciplinary overview Reviews, make technical recommendations, and approves proposals for implementation With potential widespread cascading outages Includes contingency N-1, N-1-1, N-2 type conditions Focuses attention on major RAS within the WECC Work is coordinated and draws on the information developed by other WG Other PC and OC Subcommittee and Working Groups when necessary

Membership Comprised of industry qualified members familiar with various aspects of RAS Many are knowledgeable representatives with remedial action schemes within the region Industry Participation Such as IEEE, IEC, CIGRE Provides for reasonable geographic representation Includes expertise in a variety of application and design disciplines (Engineering and Specialists) Communication and Network systems Information Systems Control and Automation systems Transmission planning Operations engineering Protective relaying systems engineering Substation design

Some Industry Activities CIGRE TF38.02.24 Defense Plans Against Extreme Contingencies Design and Deployment of a Well Coordinated Overall Defense Plan WECC RAS Reliability TF - Design and Implementation Standards and Review Criteria CIGRE TF38.02.19 System Protection Schemes in Power Network IEEE Power Systems, System Protection SC Report on “Wide Area Protection and Emergency Control” (WG C-6) Special Protection Schemes, Survey on Implemented Scheme Survey of Power System Protection Schemes (WG C-4)

Benchmarking Exercises  Review of the Guide For Design of Critical Communication Circuits and Reliability Measures – Prepared by the WECC Telecommunication WG FCC considerations for wider applications of 6GHz band - Update on Telecommunication WG Requirements For a Well Planned and Implemented Scheme IEEE and CIGRE Efforts Understanding of the European and NE outage US and Canada Outage Review of NERC Recommendations and RASRS Actions

Sample of Schemes Reviewed April 2003- April 2004 IPC, Hells Canyon Runback Scheme PNM, Import Contingency Load Shedding Scheme (ICLSS) PG&E / SCE Path 26 SCE, High Desert Power Project (HDPP) SCE, Pastoria Generation BPA, Lower Snake RAS Presentation SRP, PV-COI Mitigation RAS - Phase 1

Challenges Ahead Cyber Security Unobstructed Visibility Standardization of min. requirements Performance / Throughput timing may be affected Unobstructed Visibility Telemetry (Flow, Voltage, Watts, Reactive voltage) Frequency Voltage Phase angles and differentials Use of multi-function devices for combined protection and SPS / RAS functions Centralized vs. Distributed Systems Smart Restoration

Use of a device such as a relay shared for both protection and RAS functionality simultaneously Different functional requirements and device set points Different maintenance, testing and operating needs Potential complications and confusion from operating and maintenance prospective when both RAS and protection using the same device Different maintenance intervals and maintenance priority levels - Based on intended application and levels of redundancy Availability of the devices for routine system testing (Isolation or unavailability of the wide area monitoring devices may not cause system limitations while may not be acceptable from the equipment protection prospective) Communication network, interfaces, and routing are different between WAPC devices and those used for conventional equipment protection

Pat Wood, III - Chairman, Federal Energy Regulatory Commission Before the Committee on Governmental Affairs United States Senate November 20, 2003 We need to invest in: Hardware and software that let operators manage the grid more effectively Tools that improve system monitoring, evaluation, visibility, visualization and information sharing about grid conditions over a wide region …..

Thank You For Your Attention Questions?