WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010.

Slides:



Advertisements
Similar presentations
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Advertisements

Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
1 Proprietary & Confidential © 2012 BrightSource Energy, Inc. All rights reserved. © BrightSource Energy, Inc. All rights reserved. 1 Ivanpah.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
Ghana’s Power Outlook 1. Generation Sources 2 Currently, VRA contributes 75% of the total generation.
Steve Moorman Mgr Business Development, Advanced Technologies Babcock & Wilcox CO2 Emission Reduction from Coal Fired Plants FutureGen 2.0 CO2 Capture.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Wind and Solar Integration in Colorado: Challenges and Solutions Colorado Rural Energy Agency Energy Innovations Summit Energy Storage for Intermittent.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1 Western Wind & Solar Integration Study Phase 2: Cycling Impacts on Thermal Generators Dick Piwko, Gary Jordan March 16, 2011.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Gas Turbine Developments Needed to Aid Wind Power Integration Dr. Warren Katzenstein October 21, 2010.
The Role of Energy Storage in Renewable Power Integration Emily Fertig Sharon Wagner Carnegie Mellon University.
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
Generation Storage™: Tapping Texas’ Hidden, Flexible, Peak Capacity
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
Novel Strategies to Reduce Variation of Wind and Solar Generation at its Source Stephen Rose Eric Hittinger.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Integrating Renewables Gloria Godson Energy Bar Association December 3,
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ENERGY CENTER State Utility Forecasting Group (SUFG) Alternative Resources and Energy Capacity Presented by: Douglas J. Gotham Purdue University Presented.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
Key Findings Utility & Environmental Implications Table 5b: Generation capacity mix at selected energy tax rates in year 2025 Issue 1 Energy Tax Power.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
2015 Mace Advocacy alliance policy conference
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Illinois Wholesale Market Update December 10, 2003.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Thermal Plant Data and Assumptions TEPPC – Data Work Group Call Tuesday, September 29, 2015.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Highly Confidential / Proprietary MARC 2010 CONFERENCE Know When to Hold Em and Know When to Fold Em Session By Scott Heidtbrink Senior VP - Supply June.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
1 Where Does Electricity Come From?. 2 Overview of Electricity.
The following slides provide information about integrating wind energy into the electricity grid. Photo by Dennis Schroeder, NREL 25907NREL
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Minnesota Renewable Energy Integration and Transmission
Towards a 100% Renewable Energy Supply “Renewables Working Together”
Integrated Resource Plan 2016
Evolving Economic Dispatch in SPP
MRES Resource Operations in SPP
Key Findings and Resource Strategy
Changing Market Dispatch
RE Grid Integration Study with India
Presentation transcript:

WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010

2 Thermal Plant Wear and Tear (Wind Wear) Wind Penetration Wind and solar load ramps faster than load demand Thermal Plants mission changes System bottoming Ramp rate – up/down Ramp range # of cycles Increased thermal cycles cause additional wear and tear Metal Fracture causes forced outage Forced outages Increase - $$ Cost Optimization Dispatch Operations Maintenance Capital retrofits Resource planning New Flexible Units Mitigate costs / risks Start Here - Wear and Tear

3 MN Wind 2008/2009 (smoothed) Day of year MW / hour (smoothed) Time of Day

4 Load, Wind and Net Load: January 2013 – System Bottoming

5 Conventional Plant Challenges of Wind Integration More Net Load Ramp Up & Down cycles on all units More Turn-down on baseload units Lower unit minimums Faster ramps up and down Greater Cumulative System Variability (Net Load = Load - Wind) Increased Starts/Stops on Gas-fired units Gas pipeline balancing & coal supply issues More Net Load Ramp Up & Down cycles on all units More Turn-down on baseload units Lower unit minimums Faster ramps up and down Greater Cumulative System Variability (Net Load = Load - Wind) Increased Starts/Stops on Gas-fired units Gas pipeline balancing & coal supply issues

6 Load Cycling LL1Lowest Load at Which Design Superheater / Reheater Temperatures can be Maintained LL2Current Advertised Low Load (~AGC minimum) LL3Lowest Load at Which the Unit can Remain On-Line Generation Unit Cycling Definitions

7 Deep Load Following Scenario Safe, Stable, Environmentally Compliant Down- Up Ramp Rate Time Ancillary Services $? ~95% FULL Load LL1 LL2 MW

8 Cycling Effects Lost Generation

9 Increased O&M costs Reduction in the life of key plant components and overall unit life Decrease in overall unit reliability Increase fuel cost Consequences of Cycling Damage - $$$

10 Unit Flexibility Options – Many Moving Parts Unit Operation Fatigue Stress cycle damage Unit Maintenance Cycle Damage EFOR PdM/PMs System Dispatch Lower Cycling costs Energy and Capacity Transactions Impact on cycle wear Resource Planning Low cost flexible resources Unit Upgrades Improve flexibility Optimize Overall System Costs Fuel Flexibility emissions