DYNAMIC SCHEDULES AD HOC WORK GROUP ANN DAVIS, CHAIR MARILYN FRANZ.

Slides:



Advertisements
Similar presentations
E-Tag 1.8 An industry tutorial. e-Tag 1.8 The basics features of e-Tag 1.8 are much the same as in the current version The tag author uses Agent.
Advertisements

E-Tag 1.8 An industry tutorial.
E-Tag 1.8 An industry tutorial.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
1 ACE Diversity Interchange. 2 ADI Pilot Project Founded on Negotiation Theory: A transaction should occur if the parties involved are either held harmless.
Dynamic Schedule e-tagging Requirements Criterion WECC-087 (formerly INT-008) ISAS Report January 2012.
Primary Objectives of WIT
Dynamic Transfers Bob WECC MIC Meeting “The Last Hurrah!”
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
WECC BAL-STD-002 Workshop February 6, 2008
OC ORSTF Position WECC Board Meeting December 8, 2006.
Open Access Technology International, Inc.
BAL-002-WECC-1 Contingency Reserves
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
ISAS Liaison Report October 25-26, 2007 MIC Meeting.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Lifecycle of a Freedom of Information (FOI) request – corporate or business information.
FERC Order minute Scheduling.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Capacity Planning.
Reading a GE PSLF *.epc into PWS
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
INT Rewrite Projects Presented by Bob Harshbarger January 2012.
ISAS Update August 2, 2011 Market Issues Subcommittee.
Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
Lutherville Volunteer Fire Company. Who We Are Provide fire, rescue and first responder emergency medical services to Lutherville and 34 surrounding communities.
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
NERC LTRA Update / CDR Capacity Counting Issues
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
2013 Calendar Year Customer Survey Results
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
Managing Reliability and the Markets with PI
Self-Supply: Next Steps Carol Opatrny, for CECD NIPPC Board Meeting - 21 June 2010 Portland, Oregon 1.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
ROS December 2007 Carlos Gonzalez-Perez ERCOT Operations Support CFE-ERCOT DC-Ties Commercial Operations 1 10/30-31/2007 CFE/ERCOT/AEP Meeting – Mexico.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Current FRRS Language & Explanation of Posted Data
Unscheduled Flow Administrative Subcommittee Report
Grid Integration of Intermittent Resources
Kenneth Silver Los Angeles Department of Water & Power
Pseudo-tie business procedure
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Dynamic Scheduling Overview
After-the-Fact Workgroup Update Sheryl Welch
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Variable Generation Subcommittee Update to PCC
NERC Congestion Management
WIAB WECC Interchange Authority Backup
Pseudo-tie business procedure
RC Transition and Tools (WIT, ECC) Update
Presentation transcript:

DYNAMIC SCHEDULES AD HOC WORK GROUP ANN DAVIS, CHAIR MARILYN FRANZ

DYNAMIC SCHEDULES AD HOC WORK GROUP DriversIssues Example of current Dynamic Scheduling Work Group Members – Dynamic Scheduling Experience Wanted Chair Contact Information

Drivers for Considering Tagging Dynamic Schedules WEBSAS – Business Practice 18 WIT requirements –Need transactions impacting Scheduled Net Interchange –Integrate into hourly values Common implementation within WECC

Drivers for Considering Tagging Dynamic Schedules Ready to influence NERC Dynamic Scheduling Work Group CISO requirement Is tagging the answer for handling Dynamic Schedules?

Issues Surrounding Tagging Dynamic Schedules Clarification of terminology within WECC - Dynamic Transfer vs. Dynamic Schedule –Are Pseudo Ties part of the problem in USF Should reserve sharing group energy deliveries be tagged? –NERC Policy 3.A.2.1 clarification: Interchange transactions established to replace unexpected generation loss, such as through prearranged reserve sharing agreements…exempt from tagging for 60 minutes…. Differing interpretations exist.

Issues Surrounding Tagging Dynamic Schedules Should the energy profile always be maximum amount? Should the tag be updated during the hour? How often? Different process for different types? –Remote Generation Needs –Ancillary Services Needs After the hour is complete, the tag can not always be updated with the integrated energy (60 minute limitation). Costs of transferring signal directly to WIT and WebSAS

Dynamic Transfer with Multiple Participants Example: Generator has a 500 MW output This schedule is generated utilizing a dynamic schedule that is calculated on a Real Time basis every four seconds throughout the hour This schedule is divided among five participants A percentage of the schedule is divided between the participants and calculated Real Time

4 seconds The dynamic schedule is calculated every four seconds & sent to Participants by data link from Source Control Area Real Time Dynamic Schedule Dynamic Transfer Generator 500 MW After the Hour = Integrated Hourly Schedule Calculated and sent by data link by Source Control Area Controls AGC There is NO imbalance! Dynamic at the top of the hour is 500MW Real Time: Each participants AGC is adjusted every 4 seconds during the hour 4 seconds C 125MW B 75MW A 125MW D 75MW E 100MW

4 seconds The dynamic schedule is calculated every four seconds & sent to Participants by data link from Source Control Area Real Time Dynamic Schedule Reduced Dynamic Transfer Generator 250 MW C 75MW B 50MW A 50MW D 25MW E 50MW After the Hour = Integrated Hourly Schedule calculated and sent by data link by Source Control Area There is NO imbalance! Plant goes to 250MW at the half Each Participants AGC is adjusted every 4 seconds during the hour matching the Reduced Generator output 4 seconds

Final Result On the half the unit went down to 250MW Reduced Generator Output is calculated every 4 seconds 500 X 30 / 60 = X 30 /60 = 125 End of the hour = = 375 After the Hour = Integrated Hourly Schedule = 375 Controls AGC There is NO imbalance! 4 seconds Generator 250 MW All participants were notified of their reduced share All Control Areas checked out to integrated number

Advantages to Existing Dynamic Scheduling The Dynamic schedule will change throughout the hour due to plant fluctuations AGC automatically responds to the fluctuations If the schedule is reduced, everyones percentage or share is reduced After the hour, an integrated hourly schedule is created automatically by the EMS system The schedule is automatically populated Each participating control area is required to have their equipment set up to automatically send or receive dynamic signals Minimal manual input

Tagging Limitations to Consider Present Tagging of Dynamic schedules does not work. Tagging timeframe does not allow for after the hour changes Each hour a tag would have to be updated with the before the hour – estimated schedule Each hour a tag will have to be updated with the after the hour dynamic value, if possible Dynamic tags presently do not affect the tag driven scheduling systems, thus cannot affect AGC (signal affects intra-hour). A tag cannot be changed Real Time every four seconds

Additional Dynamic Schedule Issues

Proposed Ad Hoc Workgroup Group members should currently be involved with implementing dynamic schedules Determine and come to consensus on any issues related to handling possibly tagging dynamic schedules. Strive for consistent implementation throughout WECC Propose any necessary Business Practices Review any existing WECC documents related to Dynamic Schedules and Remote Generation (2) Representation in NERC Dynamic Scheduling Work Group

DYNAMIC SCHEDULES AD HOC WORK GROUP Current Volunteers: Ann Davis, Chair –Sheryl Torrey/Jennella Battles –Jim Hansen –Sue Holden-Baker –Marilyn Franz

DYNAMIC SCHEDULES AD HOC WORK GROUP Additional Volunteers

DYNAMIC SCHEDULES AD HOC WORK GROUP Contact Chair with questions/issues: –Ann Davis – BPAT Plan to hold a meeting in December