Central California Clean Energy Transmission Project

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
Advertisements

CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
ACE Diversity Interchange (ADI)
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
1 Comments for Workshop on EEU Budget for August 6, 2008.
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
1 WECC Regional Planning Study British Columbia – Northern California Presentation to PCC Jim Filippi, PG&E 10/26/2006.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Electric System Reliability in a Post SONGS World.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Department of Water and Power City of Los Angeles Renewables Portfolio Standard (RPS) Master Plan Building Out Opportunities October.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
California Energy Commission Workshop Nuclear Power Plant Issues
CALIFORNIA’S PROGRESS IN RENEWABLE ENERGY November 2012 Michael Picker Senior Advisor to the Governor for Renewable Energy Facilities.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
® Investor Meetings June 7-8, 2010 PG&E Corporation.
Montana Ambassadors Helena, Montana February 25, 2011.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
ISO Grid Planning Presentation to CREPC October 1, 2002
Charles Hosken, General Manager Imperial Irrigation District
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Electric Industry Restructuring New Imperatives in a Competitive Environment Increase Efficiency Improve power reliability and quality Enhance Market Access.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
1 CCPG Senate Bill 100 Lamar – Front Range Presentation May 27, 2010.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
LS Power LS Power is a power generation and transmission group
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
I-5 Corridor Reinforcement Project
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
FRTPSPS (Helms RAS) Modification of Cottle 230kV Bus
Pacific Power Seismic Preparedness Update
FRTPSPS (Helms RAS) Modification of Cottle 230kV Bus
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

Central California Clean Energy Transmission Project TSS Meeting #146 Seattle, WA August 15-17, 2007

Approach to Transmission Development Encourage resources to connect to areas where transmission capacity is available Focus on multi-purpose projects Use existing R/W before developing new R/W Focus on implementing smaller transmission projects that can be placed in service quickly Develop larger transmission projects Maintain flexibility in developing transmission plans to deliver maximum benefits to customers in an environmentally responsible manner Develop a California Sub-regional Transmission Plan through regional and sub-regional collaboration

L L Possible Future Transmission Corridors in California Wind Geo Solar L -- Major Load Centers in California L

Central California Clean Energy Transmission Project Project Scope Construct ~ 140 - 180 miles of new 500 kV Double Circuit Tower Line from Midway to a new Substation east of Fresno on new R/W Project Objective: Facilitate efficient management of renewables to meet CA 20% RPS Goal Increase Path 15 transfer capability by ~1,250 MW Increase transfer of base load & as available renewable resources from S CA to N CA Increase utilization of the Helms PSP to enhance the value of off-peak generation Increase reliability to Yosemite/Fresno area Reduce Fresno Area LCR Expected Operation Date: Dec. 2012 Defers need for Gates-Gregg indefinitely Pacific Gas & Electric Company Bellota Tesla New Sub E2 Los Banos Gregg San Luis Helms PSP Moss Landing Kings River Panoche McCall PATH 15 Central California Clean Energy Transmission Project Gates Arco Midway Morro Bay Diablo Canyon PATH 26 To Southern California Edison Company

To Southern California Edison Company Potential Routes East Route: ~140 miles Runs along the foothills – less impacts on farm lands, avoid urban areas Potential use of SCE access roads Lower probability of multiple 500 kV line outages than West Route No 500 kV line crossing Pacific Gas & Electric Company Bellota Tesla New Sub E2 Los Banos Gregg San Luis Helms PSP Moss Landing Panoche Kings River McCall PATH 15 C3ET Project – East Route West Route: ~180 miles Crosses farm lands and urban areas Lower probability of multiple 500 kV line outages Crosses Four existing 500 kV lines C3ET Project – West Route Gates Arco Midway Morro Bay Diablo Canyon PATH 26 To Southern California Edison Company

Project Description Expected Operation Date - December 2012: Build a 500 kV double circuit tower line (about 140 – 180 miles in length) with two 2,300 kcmil AAL conductors (bundled), with both circuits strung. Build a new 500 kV Substation (E2) with one 500/230 kV 1,120 MVA transformer bank, Loop the Helms – Gregg #1 and #2 230 kV lines into the E2 Substation, Build two 500 kV line terminations each at Midway and E2 Install additional voltage supports in the Fresno area. The amount and location of the voltage support will be evaluated in a voltage stability study.

Project Implementation Plan Phase I: Prepare PEA pursuant to the CEQA and the CPUC permitting requirements. Perform the necessary engineering and design work required to prepare the PEA. Coordinate WECC Regional Planning and Path Rating Process with external interested parties. Phase II: File an application in December 2008 with the CPUC for a CPCN. Phase III: Assuming the CPUC grants a CPCN by December 2009, land acquisition and project construction would start immediately to achieve a December 2012 completion date.

Potential Future Expansion C3ET Project must be designed and sited to allow for rational, cost-effective future expansion of the 500 kV grid as required by future load growth and RPS procurement Expected Operation Date ~ 2020: Install a second 500/230 kV 1,120 MVA transformer bank at E2 Install additional voltage supports in the Fresno area. The amount and location of the voltage support will be evaluated in a voltage stability study. Other expansion possibilities: Potential expansion north of E2 to San Francisco Bay Area and Sacramental Valley Potential expansion south of Midway to Southern California and Desert SW

Possible Long-Term Transmission Expansion Bonneville Power Administrative (BPA) Projects north of Tesla - support based on Option CA2 (other options possible) Renewables in the northern portion of the PG&E service territory Renewables imported from the NW and Canada at proposed Raven Substation Load growth in Sacramento Valley and SF Bay Area Captain Jack Malin Path 66 Raven New Sub To NW and Canada 125 mi COTP Table Mt. Sierra Pacific (SPP) 140 mi Lake Tahoe Potential projects south of Tesla -support renewables in the southern portion of the PG&E service territory Renewables imported from the South Load growth in Fresno and SF Bay Area Elverta Tracy Bellota Tesla 40 mi 105 miles Raven Sub Helms Metcalf 60 mi Moss Landing Los Banos Gregg Path 15 Connection to Potential projects south of Midway - support renewables in the southern CA and Desert SW Load growth in S CA and seasonal exchange C3ET Project Also includes 4-230 kV lines terminated at Gates Gates Tehachapi Area Diablo Midway Path 26 Southern California Edison (SCE) Vincent

Questions?