Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project
Advertisements

1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
ACE Diversity Interchange (ADI)
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Electric System Reliability in a Post SONGS World.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
OPERATING IN THE EAGLE FORD SHALE
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Borah Mitigators Remedial Action Scheme for the Borah West Path Sponsored by: IDAHO POWER Team Members: Kyle Jones Mark Magee Jason Rippee.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
California Energy Commission Workshop Nuclear Power Plant Issues
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ISO Grid Planning Presentation to CREPC October 1, 2002
Charles Hosken, General Manager Imperial Irrigation District
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
I-5 Corridor Reinforcement Project
FRTPSPS (Helms RAS) Modification of Cottle 230kV Bus
Pacific Power Seismic Preparedness Update
Mid-Continent Area Power Pool
FRTPSPS (Helms RAS) Modification of Cottle 230kV Bus
Presentation transcript:

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007

2 Alternatives Considered Alt-1: Build a Midway – E2 500kV DCTL (Recommended) Alt-2: Build a Midway – E2 500kV SCTL Alt-3: Build a Midway – E2 765kV SCTL Alt-4: Build a Midway – Gregg 500kV SCTL

3 Alternative Considered but Rejected Build a 2nd Gates – Midway 500kV SCTL and a new Gates – Gregg 230kV DCTL. This alternative is not recommended due to the following reasons: – This alternative would require numerous crossing of the existing 500kV and 230kV lines that would therefore have higher probability of multiple 500kV line outages. – The Gates – Gregg 230kV DCTL would traverse developed farm lands in the San Joaquin Valley. – It would only provide about 500 MW of increased south-to-north transfer capability over Path 15. This is less than half of the transfer capability expected from the other potential alternatives.

4 Preliminary Plan of Service Build a 500 kV Double Circuit Tower Line with two 2300 kcmil AAL conductors (bundled), Build a new 500 kV Substation (E2) with two 500/230 kV 1,120 MVA transformer banks, Loop the Helms – Gregg #1 and #2 230 kV lines into the E2 Substation, Build 500 kV line terminations at Midway and E2, and Install additional voltage supports in the Fresno area. The amount and location of the voltage support will be evaluated in a separate voltage stability study. Expected Operation Date: 2Q – 3Q/2013

5 Potential Routes C3ET Project – East Route To Southern California Edison Company Pacific Gas & Electric Company Gregg Panoche Helms PSP Gates San Luis Los Banos Moss Landing Morro Bay Diablo Canyon Midway Bellota Tesla Kings River McCall PATH 15 PATH 26 New Sub E2 C3ET Project – West Route Arco East Route: ~140 miles Runs along the foothills – less impacts on farm lands, avoid urban areas Potential use of SCE access roads Lower probability of multiple 500 kV line outages than West Route –No 500 kV line crossing West Route: ~180 miles Crosses farm lands and urban areas Lower probability of multiple 500 kV line outages –Crosses Four existing 500 kV lines

6 Proposed Midway-E2 500kV line Kerckhoff-Sanger 115kV lines Helms-Gregg 230kV lines Helms PSP Gregg & Herndon E2 Sub McCall Sanger E1 Sub E2 Substation Location

7 Potential Benefits Improve transmission reliability for Yosemite and Fresno Areas. Increase Fresno and Yosemite area import capability to serve local customers. Reduced Local Capacity Requirements in Fresno Area Improve utilization of the existing capability at Helms PSP. Help mitigate potential minimum load and over-generation problems during off-peak conditions. Increase Path 15 transfer capability to avoid potential congestion and increase access to larger population of renewable resources in southern California. Reduce green house gas based on displacement of thermal generation in PG&E area Eliminate the existing Helms Transfer Trip RAS needed for supporting Helms pumping operation.

8 Preliminary Schedule

9 Questions?