PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.

Slides:



Advertisements
Similar presentations
Business Practices Subcommittee Update April 30, 2013.
Advertisements

Parallel Flow Visualization/Mitigation Proposal
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Base Case Coordination System RFP David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah.
WECC TRD/NERC TADS Webinar
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Frequency Responsive Reserve Process Update
WECC Operating Committee Request for Discussion and Guidance MOD-001-WECC-RBP-0 Reliability Data Exchange (MOD) October 24, 2013.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Standards Committee Joint Session
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
WECC System Performance Criteria 1st Team Meeting Background
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
Joe Seabrook Puget Sound Energy, Inc.
The Western Electricity Coordinating Council Document Categorization Project Steve Ashbaker February 19, 2009 RPIC Meeting – February 19, 2009.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
1 TEPPC March 25, CCPG Transmission Providers.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
Software change management
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.
WECC Reliability Based Control Field Trial
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Draft 2015 WECC Budget Standing Committee Meetings March 25-27, 2014.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RAC Implementation Status
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reliability Assessment Committee Proposal TSS Meeting
WECC Regional Standards Update
Eleanor Ewry Base Case Coordination Subgroup Chair
Reliability Assessment Committee
Merrill Brimhall – Engineer, Staff
RAC Implementation Status
Andrew Christensen, SRWG Chair
SRWG Chair Report March 2015 WECC HQ
Tracy Rolstad TSS Chair
System Review Work Group Update to TSS
Planning Meeting November 4, 2010 Marv Landauer.
Standing Committee Meetings March 25-27, 2014
Presentation transcript:

PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair

Today Base Case Coordination System (BCCS) WECC-071 System Performance Criteria Drafting Team 2

BCCS In a Nutshell Software Tool to Improve Current Process of Base Case Data Collection, Error Checking and Compilation Web-accessible Centralized Database Facilitates Improved Data Management Supports Integration with the Westwide System Model 3

Progress To Date Request for Information Issued August 2009 Vendor Interviews Request for Proposal Approved by SRWG March 2010 Approved by TSS April 2010 Approved by PCC June 2010 Presented to WECC Finance and Audit Committee in April and May

RFP Considerations Include sufficient detail in the RFP The selected vendor must ensure compatibility across multiple power system analysis platforms Steady state and dynamic data Vendors will recommend preferred file management and maintenance methods 5

Next Steps RFP Board Approval in July 2010 Issue RFP to Vendors Fall 2010 Develop Paper on Proposed Framework for Base Case Development with the BCCS (Revised Data Preparation Manual) Develop a Quantitative Cost/Benefit Analysis Vendor Bid Review Fall/Winter

WECC-071 System Performance Criteria WECC Drafting Team formed March 2010 Review TPL-(001 thru 004)–WECC–1-CR- System Performance Criteria Requirement WRS1.1 Reliability Subcommittee was assigned to be the drafting team Existing WRS1.1: The NERC Category C (N-2) initiating event on double circuit towers also applies to the N-2 contingency of two adjacent transmission circuits on separate towers in a common corridor Remove or modify WRS1.1 classifying the N-2 of two adjacent transmission circuits on separate towers as Category D

Common Corridor Definition

TEPPC Study Request Scenario Study request submitted in the 2010 TEPPC Study Program -- determine economic benefits if WECC requirement WRS1.1 is removed Requested TSS to use judgment on how ratings might increase with this hypothetical criteria change If path ratings limited by an N-2 adjacent circuit contingency, what would the rating be if the adjacent circuit criteria were reclassified as Category D? Discussion: Path Rating study required to determine the actual change in a path rating Concern with the accuracy of the results of requested scenario

Questions? 10 Dana Cabbell PCC Chair (909) All information on PCC can be found on the WECC website at

Back Up Slide

Common Corridor Definition Common Corridor definition from WECC TPL criteria: Contiguous right-of-way or two parallel right-of-ways with structure centerline separation less than the longest span length of the two transmission circuits at the point of separation or 500 feet, whichever is greater, between the transmission circuits. This separation requirement does not apply to the last five spans of the transmission circuits entering into a substation. Adjacent Transmission Circuits definition from WECC TPL criteria: Transmission circuits within a Common Corridor with no other transmission circuits between them. Transmission Lines that cross but are otherwise on separate corridors are not Adjacent Transmission Circuits.