Composite Load Model Implementation Update Craig Quist, PacifiCorp April 25-27, 2012 TSS Meeting.

Slides:



Advertisements
Similar presentations
Tax Information Network of Income Tax Department (managed by NSDL)
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Census Bureau DRIS Date: 01/16/ Index Data Modeling Data Modeling Current Datafile Current Datafile Current Dataload Current Dataload Data Overlook.
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Craig Quist TSS Representative PacifiCorp Transmission Path Definition Variations Technical Studies Subcommittee January 2012.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Composite Load Model Implementation Update Craig Quist, PacifiCorp January 23-25, 2013 TSS Meeting.
Composite Load Model Implementation Update
Use of Node-Breaker Model in POM Suite/ROSE Software
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
Addition Facts
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
EE 369 POWER SYSTEM ANALYSIS
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
1 1Line Training Capacity Release - Phase II Awards and Recall/Reput.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
VOORBLAD.
UR Financials Project Demo Days April UR Financials Demo Days – April 2014 Agenda Project Update and Delay Details Impact to Project Deliverables.
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Enoch Davies Associate Engineer Composite Load Model Implementation January 19, 2012 Salt Lake City, UT.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
Reading a GE PSLF *.epc into PWS
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Export ASPEN Sequence Data To PTI WECC Base Case
1 CS 446 – Tutorial 6 Frid. Nov. 6 th, 2009 Implementation Tutorial.
© 2012 National Heart Foundation of Australia. Slide 2.
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
Addition 1’s to 20.
25 seconds left…...
Week 1.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
We will resume in: 25 Minutes.
Underfrequency Load Shedding Assessment Report Kent Bolton January 30, 2014 JGC Meeting SLC, UT.
© ABB University - 1 Revision C E x t e n d e d A u t o m a t i o n S y s t e m x A Chapter 20 Import and Export Course T314.
Section 1: Process to create EAS Interface File  DoD Batch and Timecard Status Report  DoD Employee Missing Payroll Data Report  Distribute Labor Cost.
Page 1 of 34 The Search Agreements functionality in Transfers enables you to find existing agreements pertaining to registered interests. Using the search.
Step 1: Enter your “21 Character Employee Id Or Alternate User Id” Step 2: Enter Personal Password & Click Login NOTE : (First use password is “21 Character.
Chair: Daniel Kuraspediani - BPA POWER WORLD USER’S WORK GROUP (PWUWG)
Lecture 2 Complex Power, Reactive Compensation, Three Phase Dr. Youssef A. Mobarak Department of Electrical Engineering EE 351 POWER SYSTEM ANALYSIS.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
January TSS J. Gronquist, S. Kincic
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Stability Analysis on WECC Systems with Wind Penetration and Composite Load Model Introduction The growing complexity of generation and load pattern in.
Benchmarking WECC Composite load model
WECC Load Modeling and Validation Group Meeting
Reliability Assessment Committee Reliability Workshop Priorities
CMPLDWG Composite Model with Distributed Generation Approval
Reliability Assessment Committee Reliability Workshop Priorities
CMPLDWG Composite Model with Distributed Generation Approval
WECC Load Modeling and Validation Group Meeting
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Power World User’s Work Group (PWUWG)
Presentation transcript:

Composite Load Model Implementation Update Craig Quist, PacifiCorp April 25-27, 2012 TSS Meeting

2 WECC got responses from all but one area coordinator, in some cases default data was submitted hs base case will be used, dyd will initially be released for current load model, dyd with long ID will be available shortly; Will need 2012 ls to be posted before full data is available. Letter with a recommended report format will be sent out. PTI impacts, due to move to RV 32 will be reevaluated next week. Reports due to PacifiCorp (CQ) by May 15, 2012; Report to TSS/RS to distributed in July, about one month ahead of fall meetings. Status at last TSS Meeting (January 25 – 27, 2012)

To date, reports have been received from TID and CAISO… Initial Conclusions & Recommendations… Turlock Irrigation District (TID) –Post-Composite Load Model WCA Results report the newly created bus, not the original bus. This can be confusing. It is recommended that the results being displayed report the original bus, not the new one. –Post Composite Load Model log files suggest there are multiple iterations of the fault being applied. It is recommended to determine if this is true and why it might be happening if it is not the desired results. Composite Load Model – Status Update… 3

Turlock Irrigation District (TID) [cont.] –The Post-Composite Load Model Transient Stability study took almost twice the time as compared to the Pre-Composite Load Model study. This may or may not be due to the suspected iterations mentioned above. This may or may not be a GE PSLF issue. Transient Stability studies take too long currently so it is recommended to work with GE to streamline the process to keep the length of time to a minimum. –The results of the Post-Composite Load Model Study were comparable to the Pre-Composite Load Model Study. Additional buses reported to have a violation. Implementing the load shedding scheme for TID did not change this result. Composite Load Model – Status Update… 4

California ISO (CAISO) –The composite load model works and gives reasonable results –For some contingencies, the system performance in the simulations was the same with the interim load model and with composite load model. –For other contingencies, composite load model showed tripping of some parts of the loads (or reduction in load). –The contingencies that showed load tripping not necessarily were the ones with highest flow on the transmission lines that were out with contingencies. Composite Load Model – Status Update… 5

California ISO (CAISO) [cont.] –Composite load model shows significant difference in the results compared with the interim load model in case of a fault on a bus that has large load connected to it (for example Valley 500 kV). In this case, large amount of load was tripped in the composite load model case both by under-frequency relays and because of motor stalling. How is the PTI PSS/E Revision 32 conversion – composite load model efforts proceeding? Composite Load Model – Status Update… 6

Bill Hall (4/4/12) transmitting composite load model base case to PAC planners: –Attached is a zipped file with the WECC 2012 HS4A1 case containing the dynamic composite load model data. [To get the composite load model to work with the current PSS/E program array dimension limitations.] –I have removed approximately 4/5 of the composite load model data, and all of the under frequency load shedding model data to make room for as much composite load modeling as possible. –The composite load model data was removed for the Alberta, British Columbia, Northwest, California and Nevada areas. –I have also netted out all of the GE wind turbine models (approximately 20 units) so that testing can be done without using a Fortran compiler. –For testing, users must use PSS/E Rev and replace two dynamic modules in their PSS/E software. –I have included the two dynamic modules in the attached zipped file. Please advise me on the status of the testing. Composite Load Model – Status Update… 7

PAC Preliminary Composite Load Model Findings: –Initial analysis was performed to compare two load models for 3 phase fault at Goshen 345kV bus with loss of Goshen - Kinport 345kV line. (Solid black line is with Composite Load Model). –While preliminary study results show that the new Composite Load Model will not limit Bridger and Path C path limits; however, study results did indicate unusual load tripping is now evident using the new load model, which were not evident using the previous model. Bill Hall Inputs: Detailed channels/plots [internal variables] for the composite load models are needed before any conclusions can be drawn. Also, in a 10 second no disturbance simulation, some of the load models (Big Grassy for example) were causing some variations in the network convergence. This should also be explored with detailed channels/plots to determine the behavior of the composite load models. Composite Load Model – Status Update… 8

9 Bonneville 69 kV voltage following a 3 phase fault at Goshen 345kV bus with loss of Goshen - Kinport 345kV line.

Composite Load Model – Status Update… 10 Bonneville 69 kV voltage following a 3 phase fault at Goshen 345kV bus with loss of Goshen - Kinport 345kV line. Load restoration during voltage recovery.

Motor A - Performance 11

Motor B - Performance 12

Motor C - Performance 13

Motor D - Performance 14

Trip – Reclose Factor 15

A single simulation indicates that the new model may increase our transfer capability. [hold applause] We will need lots of studies to make sure if there is an issue for this model. There will be a lots of Modeling Validation kind of work to determine if the data is right. [Issue: cook book approach] Key questions have surfaced: Does the loads tripped this fast? Does the loads restored this quickly? Preliminary - detailed channels/plots analysis for the composite load models 16

Bill Hall composite load model status (4/23/12): –GE PSLF Ver. 18 does not write out the composite load model data correctly in the dyd file. It is critical that the data be written out correctly, without variable names, as the data is modified by the PSLF program. –PSLF to PSS/E data conversion routine is correctly converting the composite load model data when provided with a corrected dyd input file. –PSS/E Rev program array dimensions will only accommodate approximately 1000 of the more than 5000 composite load bus models. A future release of the PSS/E program will be needed to fully test the composite load model on a WECC wide basis. –With a smaller composite load data set, PSS/E dynamics will initialize but some variations in the network convergence can be seen in a 10 second no disturbance simulation. These variations need to be reviewed/resolved before a general review of the model performance can be done with the large variety of data contained in the WECC 2012 HS4A1 operating case. –PacifiCorp Planning is currently performing preliminary analysis. Composite Load Model – Status Update… 17

Composite Load Model Implementation – Going Forward… 18 PSLF Users: –Initial PSLF User study findings submitted to PacifiCorp (CQ) by 6/15/2012. –PSLF User composite load model study findings will be compiled and submitted to M&VWG PSS/E Users: –PacifiCorp initial PSS/E composite load model study findings compiled and submitted to M&VWG. –GE PSLF Ver. 18.x will need be modified to write out the composite load model data correctly in the dyd file. –PSS/E Rev. 32.x program will need to be modified to accommodate 5000 composite load bus models to fully test model. Where do we go from here… M&VWG: –Review initial study findings. –Potential updates to Composite Load Model software and/or data –Rewind process, including analysis by PSS/E users

19 Questions