Enhanced Curtailment Calculator Task Force Report

Slides:



Advertisements
Similar presentations
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Advertisements

Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Craig L. Williams UFAS Liaison Market Interface Manager ECC Cost Benefit Analysis Review July 17-19, 2013 Standing Committees Joint Session.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
OC ORSTF Position WECC Board Meeting December 8, 2006.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WECC Standards Committee Join Session Webinar Meeting September 5, 2013.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
SIS Report Jerry Smith Albuquerque, NM March 7, 2008.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
Unscheduled Flow What direction for the Future
ACE Diversity Interchange (ADI)
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
FERC Order minute Scheduling.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung January 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Jeremy West Sr. Operations Planning Engineer ECC Update January 28, 2015.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Enhanced Curtailment Calculator
UFMP methodology changes in the updated webSAS February 2015 A video presentation reviewing the webSAS UFMP methodology changes going into effect March.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Element Definition Process Presented by Peak to ECC Task Force April 28, 2015.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
NGEIR Technical Conference Presentation May 16, 2006.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
Bulk Power Transmission System
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Standards Review Subcommittee Update August 17, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 9, 2009.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
ECC Task Force Webinar September 3, Peak Anti-Trust Statement Phase 1A Update webSAS Integration PSE Access Peak and the Task Force Next Steps.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 8, 2014 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Meeting the Future Together Update on The Garfield County “Socio-Economic” Impacts Study Energy Advisory Board April 7, 2005.
Energy Imbalance Market (EIM) Dan Dettmer Board Meeting February 16, 2011.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Bert Peters Chair, Path Operator Task Force
Brett Wangen Director of Engineering, Peak Reliability
Briefing on 2017 CAISO Policy Initiatives Roadmap
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Doug Reese, USFEATF Chair
Kenneth Silver Los Angeles Department of Water & Power
Strategies of Reliable Transmission of Energy In A Competitive Market
Mgr. Interconnection Reliability Initiatives
Enhanced Curtailment Calculator (ECC)
Path Operator Task Force Kickoff April 3, 2013 Webinar
Doug Reese, USFEATF Chair
ESC Use Case Review Joint OASIS Implementation Task Force Paul R
UFMP methodology changes in the updated webSAS
Path Operator Task Force Kickoff April 3, 2013 Webinar
NERC Congestion Management
Bert Peters Chair, Path Operator Task Force
RC Transition and Tools (WIT, ECC) Update
Presentation transcript:

Enhanced Curtailment Calculator Task Force Report

Enhanced Curtailment Calculator Tool to determine appropriate curtailment of transmission system use when overloads occur. Originally proposed through the Efficient Dispatch Toolkit. This would be a reliability tool for use with or without the Energy Imbalance Market.

Need for the Tool Transmission system is under more strain due to desire to efficiently utilize assets Variable Generation integration is causing changes to grid utilization also. UFMP covers 6 rated paths while TOP-007-WECC-1 covers approximately 40 rated paths. There have been events in the past where all schedules across a path were curtailed and flow was not changed.

High Level Overview Any Transmission element/line/path can be nominated in the tool. Transfer Distribution Factors (TDF) will be calculated for all source/sink combinations for each monitored element. Curtailments would be based on Transmission Priority and include tagged and untagged uses

Proposed Schedule ECCTF plans to bring proposal forward at the March Joint Meetings If accepted by Standing Committees, take it to the WECC Board in June. Request proposals and negotiate contract in Q3 2012 Testing in Spring 2013 Implementation Fall 2013 Proposal should include white paper, business case, technical spec and scope document.

Questions?