1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Update on IDNO/DNO working group DCMF 12 November 2009.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
EDCM update Mo Sukumaran (on behalf of CMG)
Review of industry code governance 26 March 2010.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Managing Exceeded Capacity. 10 September The Issue of Exceeded Capacity DNO Connection Charging Methodologies: customers who increase Maximum Capacity.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Gas SO Incentives For 1 April 09 Transmission Workstream 3 July 2008.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Mod Proposal Prevention of "Timing Out" of Authority decisions on Modification Proposals Nick Reeves.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
LC14 Statement Oliver Day UKPN (on behalf of DNOs) 1 | Energy Networks Association 1 December 2011.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
CMG and Workstream Update
Exit Capacity Release Methodology Statement
Code Governance Review UNC Modification Proposals
Transmission Planning Code
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Holistic view of Charging Modifications – In flight 11th June 2018
Transmission Planning Code
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
Rebecca Hailes For 15 March 2018
Transmission Planning Code Review
PARCA Timeline.
Generic Revenue Driver Methodology
Transmission Workgroup July 2012
IECR Incremental Step Size
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream 4th December 2008
Gas Customer Forum 28 July 2008
Presentation transcript:

1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology

energynetworks.org 2 WorkStream 4 - CCCM All DNOs have (or will shortly) submitted a charging modification based on the CCCM First modifications submitted 26 th March 2010 Ofgem have until 23 rd April to veto, not veto or consult Ofgem are to consult on the proposals Veto or not veto decision required within three months of the notice to consult CCCM Target Implementation Date – 1 st July 2010 Future Governance? 1st April 2010

PROPOSED CCCM AND CHARGING STATEMENT TEMPLATE Section 1 – General Information Provides basic overview of each DNO, the connections processes and dispute mechanism Section 2 – Applying for a connection where we undertake all of the relevant work Highlights basic processes Section 3 – Applying for a connection where an ICP undertakes the Contestable Work Highlights basic processes Section 4 – Information Specific to the Company Allows DNOs to provide other information not part of Methodology or Statement Section 5 - Common Connection Charging Methodology The detailed CCCM which will apply across all DNOs and includes a number of examples which explain the application of the methodology in various circumstances Section 6 – Company Specific Connection Charging Methodology Other aspects of the methodology that are not common across all the DNOs Section 7 – Connection Charging Statement DNOs are required to publish indicative charges for connection. Must now be a common template. The form of this statement is approved by the Authority Section 8 – Glossary of Terms This section provides definitions for all the terms used in the document 1st April

energynetworks.org 4 Connection Charging Methodology Intention to keep the current connection boundary Also to provide consistent wording for all DNOs To provide greater clarity than existing statements More expansive definition of minimum scheme Common examples to explain the application of the methodology 1st April 2010

energynetworks.org 5 Connection Charging Statement New Licence Condition (SLC14.14), template must be common across all licensees. More comprehensive/ detailed template Developed in conjunction with customer reps from ECSG The form of statement must be approved 1st April 2010