WECC Composite Load Model

Slides:



Advertisements
Similar presentations
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
UNITED NATIONS Shipment Details Report – January 2006.
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
WECC Modeling and Validation Work Group
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
WECC JSIS Update Dmitry Kosterev, BPA.
Composite Load Model Implementation Update Craig Quist, PacifiCorp April 25-27, 2012 TSS Meeting.
MVWG Report to TSS January 2012
Western Electricity Coordinating Council Renewable Energy Modeling Task Force Wind and Solar Modeling Update Contact: Abraham Ellis
CMPLDW November 2011.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Composite Load Model Implementation Update Craig Quist, PacifiCorp January 23-25, 2013 TSS Meeting.
Composite Load Model Implementation Update
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Curtis Johnson Process Control Instrumentation Technology, 8e]
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
CALENDAR.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Break Time Remaining 10:00.
The basics for simulations
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
EE369 POWER SYSTEM ANALYSIS
Chapter 11 AC Power Analysis
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Using Synchrophasors for Preventing Cascading Outages
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Enoch Davies Associate Engineer Composite Load Model Implementation January 19, 2012 Salt Lake City, UT.
CUG Meeting June 3 – 5 Salt Lake City, UT
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
1 POWER QUALITY -- Bhanu Bhushan -- June, How close is the supply voltage waveform to sinusoidal, and how close are the supply voltage and frequency.
Historical Analysis WG Report to TAS November 28, 2007.
: 3 00.
5 minutes.
Clock will move after 1 minute
PSSA Preparation.
Select a time to count down from the clock above
Underfrequency Load Shedding Assessment Report Kent Bolton January 30, 2014 JGC Meeting SLC, UT.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
A Look into Load Modeling
User Experience with New Solar PV Models California ISO
Review of BPA Voltage Control Conference
WECC Load Model Sensitivity Study “ An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads ” Task.
SM SOUTHERN CALIFORNIA EDISON® CONFIDENTIAL: FOR INTERNAL PURPOSES ONLY Composite Load Model Validation July 24, 2004 FIDVR Event at SCE Valley Substation.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
Modeling DER in Transmission Planning CAISO Experience
Development and Implementation of Composite Load Model in WECC
WECC Load Modeling and Validation Group Meeting
Next Steps in Load Modeling
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
CMPLDWG Composite Model with Distributed Generation Approval
NERC-WECC Coordination
CMPLDW - DER-A Addition WECC LMTF / REMTF Meetings October 2017
NERC-WECC Coordination
CMPLDWG Composite Model with Distributed Generation Approval
CMPLDW - DER-A Addition WECC LMTF / REMTF Meetings October 2017
WECC Load Modeling and Validation Group Meeting
User Experience with New Solar PV Models California ISO
CMPLDW - DER-A Addition WECC LMTF / REMTF Meetings October 2017
WECC Load Composition Model
Presentation transcript:

WECC Composite Load Model WECC MVWG Meeting Bellevue, WA August 25, 2011

Motion Approve the implementation plant for replacing the “interim” load model with a Phase 1 “composite” load model Use default data sets Residential air-conditioner stalling disabled* * No revision of the WECC reliability criteria is needed

Composite Load Model Development

Load Modeling In the first 40 years of digital simulations, the focus was on modeling the supply side We have reasonably good power plant models Models data is to get more consistent as more plants have digital controls We have tools for power plant model validation using disturbance data Now, the focus is shifting on modeling the supply side

Load Modeling Upcoming big changes on demand-side: Loads will play much more influential role in power system stability Resistive-type loads are phasing out (incandescent lights and resistive heating) Energy inefficient but exhibit “grid-friendly” behavior Power Electronic loads, VFDs, AC compressors, heat pumps, CFLs, LEDs are gaining their presence Energy efficient but have undesirable characteristics from standpoint of dynamic stability Increasing penetration of residential air-conditioners Upcoming big changes on demand-side: Electric vehicl chargers Distributed generation Reasonable models are needed to understand the system impacts of these changes, to plan and operate the system and to develop appropriate standards

Load Modeling – Setting Expectations We can now achieve the great accuracy with generator models: We model physical equipment that is well defined and under our control We will never be able to achieve a comparable level of accuracy with load models Load models will not be able to predict details Load models should be capable of representing the load response in principle

WECC Load Modeling Philosophy WECC uses a physical-based modeling approach: Bottom-up model development Develop models that represent physics and characteristics of the actual end-use components Top-down model validation Validate and calibrate model data using disturbance recordings

History Of Load Modeling in WECC 1980’s – Constant current real, constant impedance reactive models connected to a transmission bus Reflected the limitation of computing technologies of that time 1990’s – EPRI Loadsyn effort Several utilities use static polynomial characteristics for load representation 1990’s – IEEE Task Force recommends dynamic load modeling The recommendation does not get much traction in the industry 1996 – BPA model validation study for August 10 1996 outage: Need for motor load modeling to represent oscillations and voltage instability

History Of Load Modeling in WECC 2000 – 2001 – WECC “Interim” Load Model: Presently used in planning and operational studies in WECC 20% of load is represented with induction motors, the remaining load is static, mainly constant current active, constant impedance reactive components Tuned to match inter-area oscillations for August 10 1996 and August 4, 2000 events “Interim” load model was intended as a temporary solution to address oscillation issues observed at California – Oregon Intertie The model limitations and the need for a composite load model were recognized

History Of Load Modeling in WECC Late 1980’s – Southern California Edison observed events of delayed voltage recovery attributed to stalling of residential air-conditioners Tested residential air-conditioners, developed empirical AC models 1997 – SCE model validation study of Lugo event: Need to represent a distribution equivalent Need to have special models for air-conditioning load

Southern California Edison Lugo Event – Load Modeling Lessons: A. Need to represent a distribution equivalent B. Need to have special models for residential air-conditioners

Load Modeling Efforts in the East 1994 – Florida Power published an IEEE paper, used a similar load model 1998 – Events of delayed voltage recovery were observed in Atlanta area by Southern Company, the events are analyzed and modeled Southern Company and Florida Power used in principle similar approaches to SCE’s and eventually WECC model

WECC Load Modeling Task Force 2005 – WECC developed “explicit” load model: Adding distribution equivalent to powerflow case (PG&E) Modeling load with induction motors and static loads Numerically stable in WECC-wide studies ! 2007 – PSLF has the first version of the composite load model (three-phase motor models only) 2006-2009 – SCE-BPA-EPRI testing residential air-conditioners and developing models 2009 – residential air-conditioner model is added to the composite load mode

WECC Load Modeling Task Force Composite Load Model Structure Default data sets Load composition Load component data Distribution equivalent Tools for data management Validation studies System impact studies

WECC Composite Load Model (CMPLDW) 12.5-kV 13.8-kV M 69-kV 115-kV 138-kV M AC UVLS Electronic UFLS Static

Composite Load Model Structure Composite load model structure is implemented in General Electric’s PSLF, Siemens PTI PSS®E, Power World Simulator Similar model exists in PowerTech’s TSAT TSS approved Composite Load Model Structure

Load Model Data

WECC Composite Load Model Load Component Model Data Distribution Equivalent Data M M 115-kV 230-kV M Load Model Composition Data M UVLS and UFLS Data Electronic Static

Distribution Equivalent Data M M R + j X 69-kV 115-kV 138-kV M M B1 B2 Bss Electronic DV = 4 to 6% X/R = 1.5 PL < 7% B1:B2 = 3:1 X = 8% LF = 110% Tap = +/- 10% Static

WECC Climate Areas ID Climate Zone Representative City NWC Northwest Coast Seattle, Vancouver BC NWV Northwest Valley Portland OR NWI Northwest Inland Boise, Tri-Cities, Spokane RMN Rocky Mountain North Calgary, Montana, Wyoming NCC Northern California Coast Bay Area NCV Northern California Valley Sacramento NCI Northern California Inland Fresno SCC Southern California Coast LA, San Diego SCV Southern California Valley SCI Southern California Inland DSW Desert Southwest Phoenix, Riverside, Las Vegas HID High Desert Salt Lake City, Albuquerque, Denver, Reno

Load Composition Information California Energy Commission: 2006 California Commercial End-Use Survey (CEUS) LBNL Reports on Electricity Use in California PNNL DOE2 building simulations BPA-PNNL End-Use Load Characterization Assessment Program (ELCAP) BPA Building Data Load shapes provided by WECC members

California Commercial End-Use Survey 15 climate zones in California Four seasons Typical, Hot, Cold, Weekend 24-hour data Data is available on CEC web-site bottom top

LBNL Electricity Use In California Study Residential AC Lighting Commercial AC

PNNL Load Composition Model CEC / BPA hired PNNL to develop load composition data Detailed models of various building types Residential loads are modeled using ELCAP data and DOE-2 models Commercial loads are taken from CEUS WECC developed mapping from end-uses to models

Load Class Model Components

Portland Metro Area – BPA SCADA

Portland Metro Area – BPA SCADA

WECC Load Composition Model There is a balance between precision and the amount of effort required to maintain the data sets Based on the understanding developed using PNNL tool, WECC developed a simplified LCM version to create default data sets Produces load composition data for summer (normal, peak, cool), shoulder (normal) and winter (normal) days

WECC Load Composition Model (Light)

Future work Better understanding of “electrification” by regions, and ultimately by substations Validation of building models Right now commercial data is extrapolated from California CEUS, and residential data is used from ELCAP Validation of load shapes at substation level: Use customer mix data and models to produce load shapes Validate the load shapes using SCADA data (5-min and 1–hour are available from BPAT)

Expert Help is Available If you want detailed load composition information for your specific area, please contact David Chassin at PNNL David.Chassin@pnl.gov Detailed analysis is currently done for substations in Seattle, Portland and Phoenix

Motor Data

Commercial Compressor Motor

Commercial Fan and Pump Motors

Commercial Fan and Pump Motors

Protection Industrial compressors: Industrial fans and pumps Trip and lock-out - half at 75%, half at 65%, 3 to 5 cycles Industrial fans and pumps Trip and lock-out - half at 75%, half at 65%, 3 to 5 cycles Commercial compressors Trip and lock-out: 20% of motors, trip < 60% 2 cycles Trip and reclose: remaining, trip < 50% 2 cycles , reclose > 60% for 0.2 sec Fans and pumps

Tools for Load Model Data Management

WECC Composite Load Model cmpldw 43085 "CANYON " 115.00 "1 " : #1 mva=63.18 "Bss" 0 "Rfdr" 0.032 "Xfdr" 0.04 "Fb" 0.749/ "Xxf" 0.08 "TfixHS" 1 "TfixLS" 1 "LTC" 1 "Tmin" 0.9 "Tmax" 1.1 "step" 0.00625 / "Vmin" 1.025 "Vmax" 1.04 "Tdel" 30 "Ttap" 5 "Rcomp" 0 "Xcomp" 0 / "Fma" 0.234 "Fmb" 0.157 "Fmc" 0.032 "Fmd" 0.103 "Fel" 0.136 / "PFel" 1 "Vd1" 0.75 "Vd2" 0.65 "Frcel" 0.35 / "Pfs" -0.99274 "P1e" 2 "P1c" 0.307692 "P2e" 1 "P2c" 0.692308 "Pfreq" 0 / "Q1e" 2 "Q1c" -0.5 "Q2e" 1 "Q2c" 1.5 "Qfreq" -1 / "MtpA" 3 "MtpB" 3 "MtpC" 3 "MtpD" 1 / "LfmA" 0.75 "RsA" 0.04 "LsA" 1.8 "LpA" 0.12 "LppA" 0.104 / "TpoA" 0.095 "TppoA" 0.0021 "HA" 0.05 "etrqA" 0 / "Vtr1A" 0.7 "Ttr1A" 0.05 "Ftr1A" 0.2 "Vrc1A" 1 "Trc1A" 9999 / "Vtr2A" 0.55 "Ttr2A" 0.03 "Ftr2A" 0.75 "Vrc2A" 0.65 "Trc2A" 0.1 / "LfmB" 0.75 "RsB" 0.03 "LsB" 1.8 "LpB" 0.19 "LppB" 0.14 / "TpoB" 0.2 "TppoB" 0.0026 "HB" 0.5 "etrqB" 2 / "Vtr1B" 0.65 "Ttr1B" 0.05 "Ftr1B" 0.1 "Vrc1B" 1 "Trc1B" 9999 / "Vtr2B" 0.6 "Ttr2B" 0.03 "Ftr2B" 0.1 "Vrc2B" 1 "Trc2B" 99999 / "LfmC" 0.75 "RsC" 0.03 "LsC" 1.8 "LpC" 0.19 "LppC" 0.14 / "TpoC" 0.2 "TppoC" 0.0026 "HC" 0.15 "etrqc" 2 / "Vtr1C" 0.65 "Ttr1C" 0.05 "Ftr1C" 0.1 "Vrc1C" 1 "Trc1C" 9999 / "Vtr2C" 0.6 "Ttr2C" 0.03 "Ftr2C" 0.1 "Vrc2C" 1 "Trc2C" 99999 / "LfmD" 1 "CompPF" 0.98 / "Vstall" 0.54 "Rstall" 0.1 "Xstall" 0.1 "Tstall" 0.03 "Frst" 0.14 "Vrst" 0.95 "Trst" 0.3 / "fuvr" 0.1 "vtr1" 0.6 "ttr1" 0.02 "vtr2" 0.9 "ttr2" 5 / "Vc1off" 0.5 "Vc2off" 0.6 "Vc1on" 0.4 "Vc2on" 0.5 / "Tth" 15 "Th1t" 0.7 "Th2t" 1.9 "tv" 0.025

LMDT 3A Powerflow case (done by SRWG) Climate zone and load type are identified in “Long_ID” column of “load” table in PSLF E.g. DSW_RES = Desert Southwest, predominantly residential loads EPCL Programs (done by WECC Staff) Default data sets for each climate zone and feeder type Ability to over-ride defaults with specific information Creates composite load model records for PSLF PTI PSS®E Users Convert from PSLF models IPLAN tolls may be available ? Load models will be distributed by WECC staff with study cases LMDT 3A is posted on WECC web-site, including user’s manual

Load Model Validation Studies

August 4, 2000 Oscillation - CMPLDW

August 4, 2000 Oscillation - MotorW

August 4, 2000 Oscillation - CmpldW Default Data Set

August 4, 2000 Oscillation - CmpldW Tuning

June 14, 2004 Westwing Fault - CmpldW

July 28, 2003 Hasayampa Fault

July 28, 2009 Mid-Valley Fault Voltage Frequency

System Impact Studies

2011HS – Chief Joseph Brake Blue = MotorW Red = CmpldW phase 1 Green = CmpldW phase 2

2011HS – BC-Alberta Loss (546 MW) Blue = MotorW Red = CmpldW phase 1 Green = CmpldW phase 2

2011HS – 2 Palo Verde Outage Blue = MotorW Red = CmpldW phase 1 Green = CmpldW phase 2

2011HS – 2 Palo Verde Outage Blue = MotorW Red = CmpldW phase 1 Green = CmpldW phase 2

2014LS – Montana Blue = MotorW, 77% dip Green = CmpldW, 22:00, 82% dip Brown = CmpldW, 6:00, 82% dip

2014LS – Montana Blue = MotorW Red = CmpldW, Grey/Green = CmpldW, improved exciters at a hydro plant

Next Steps

Conclusions WECC Composite load model is implemented in GE PSLF, Siemens PTI PSS®E, Power World, Power Tech TSAT Tools are developed for load model data management Default sets are developed: 12 climate zones in WECC, four types of feeders Summer, winter and shoulder conditions

Conclusions Validation studies are done for FIDVR events and oscillations System impact studies Significant impact on faults in large load centers FIDVR Impact on inter-area oscillations

FIDVR Composite load model is capable of reproducing the FIDVR phenomenon Composite load model can be tuned with reasonable data sets to match the historic events MVWG at this point is not comfortable recommending using CMPLDW for FIDVR studies for compliance purposes There is a concern that the FIDVR modeling can result in over- investment or unnecessary operational restrictions

FIDVR – Planned Work Continue work on understanding the phenomenon of air-conditioner stalling in distribution systems (supported by DOE) Work with AHRI Feeder simulations Speed up efforts on collecting disturbance recordings SCE, SRP, Center Point Energy, PSE, BPA/PGE A letter was sent to grid operators in the East Tools for detecting FIDVR events in PMU data

CMPLDW – Phased Approach

CMPLDW CMPLDW has many benefits beyond FIDVR TSS delayed PSS Policy review until appropriate load models are developed Frequency response review studies are required

CMPLDW Plan Today – Approve the implementation plan for adopting Phase 1 CMPLDW for system studies Continue improvement of FIDVR modeling Disturbance recordings, system impact studies Start using the CMPLDW for studies to support the review of the WECC voltage dip criteria Seek the approval of the “CMLDW with FIDVR enabled” and the new reliability criteria by Fall 2012

Motion Approve the implementation plant for replacing the “interim” load model with a Phase 1 “composite” load model Use default data sets Residential air-conditioner stalling disabled* * No revision of the WECC reliability criteria is needed