1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Base Case Coordination System RFP David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Standards Committee Joint Session
Use of Node-Breaker Model in POM Suite/ROSE Software
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
Joe Seabrook Puget Sound Energy, Inc.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Export ASPEN Sequence Data To PTI WECC Base Case
WG A Family of CIM Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange - Unbalanced Models.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Distance Relay Specification WECC TSS January 23,2014 Amos Ang.
Goshen Area Bus Reconfiguration
SRWG Chair Report March 2015 WECC HQ
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Current Differential Relay Specification WECC TSS August 20,2014 Amos Ang.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
WECC 2013 TPL Coordination Analysis Report PCC Response Brian Keel.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
N-1-1 Contingency Analysis & Relay Protection 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Directional Overcurrent Relay Specification WECC TSS January 23,2013 Amos Ang.
Nodal Planning Go Live Austin, TX February 3, 2011
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Philip Augustin TSS Chair
NERC TPL Standard Overview
Project WECC-0100 Update Load Modeling Task Force
Specifications Updates and Approval
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Jonathan young ColumbiaGrid
2017 System Assessment Jonathan Young February 2017
Joe Seabrook Puget Sound Energy, Inc.
Modeling Subcommittee (MS) Updates
Project WECC-0100 Update Reliability Subcommittee
SRWG Chair Report March 2015 WECC HQ
Tracy Rolstad TSS Chair
Project WECC-0100 Update Load Modeling Task Force
Distance Relay Specification
Joe Seabrook Puget Sound Energy, Inc.
Presentation transcript:

1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy

2 Background In May of 2012, FERC and NERC issued a joint report on the September 8, 2011 Southwest Blackout Event calling for improved planning. It recommended that entities throughout WECC identify and plan for external contingencies that could impact their systems and internal contingencies that could impact their neighbors systems, and expand entities external visibility in their models through, for example, more complete data sharing.

3 Purpose To achieve WECC wide visibility of contingencies in planning and operating. –Facilitate developing and/or implementing models for RAS, relays and contingency definitions –In WECC base cases, in BCCS, and in cases that are consistent with the WSM –Throughout program platforms used by planners in WECC This task force will also coordinate with the RAS and Protective Systems Modeling Oversight Task Force (RPSOTF).

4 Purpose - Discussion September 8, 2011 outage report: –Contingencies are not shared between utilities –Relay models / data are not shared between utilities –RAS models are not shared between utilities Past methods for sharing are peer to peer –Must know what to ask, who to ask, provider have time, interest and approval, and to then do this with each case. Has not worked well

5 Ultimate Goal Statement To simulate faults in power flow and transient stability by specifying the fault location and fault type on facilities like buses or branches. –Includes TPL standard faults; balanced and unbalanced, normally cleared, stuck breaker, double circuit, adjacent, extreme, and reclosing –RAS and Relays models would trip appropriate breakers at appropriate times –Data would be provided in cases for both near and long term planning and operating –Fault descriptions are resident in (or with) WECC posted cases –Available on programs used by planners in WECC

6 Steps to Get There – 3 Phases Ph 1 – Existing and New Models for –RAS, –Relays, and –Contingency Definitions Ph 2 – Base Case Coordination System –Includes fault sequence data Ph 3 – Breaker-Node Topology –Build into BCCS –Compare with WSM

7 RAS Writing RAS Specification –Event Driven & Condition Based –Power Flow then Transient Stability Had presentations by 3 vendors on current capabilities and future vision Will engage specific response by vendors at next meeting

8 Relays – Inverse Time Over Current Seeking approval of existing 3-phase relays –Existing for two vendors are curve based –Existing for third vendor is both curve and equation based Preparing generic specification for 3-phase –Is both curve and equation based –Send to MVWG 2 weeks before their meeting Data from relays is generally equation based –Equation based faster & fewer errors than curve

9 Relays – Distance / Impedance Will seek approval of existing 3-phase relays later in summer –Existing for two vendors are different but similar Will write specification for generic relay with features still needed

10 Contingency Definitions Writing specification for criteria and extreme faults (to cover faults required by standards) Could be used to develop (1) A common format, or (2) BCCS contingencies data base Exploring the BCCS data base option –Contingencies managed in BCCS –Written by a contractor –Could be used in the long term –Program vendors provide round trip conversion to the contingency processor of their choice

11 Fault – Sequence Data (MOD B) Network Sequence Data in CAPE, Aspen, planning programs (negative sequence for branches, transformer tertiary and connections, line mutual coupling –Update bus numbers, device IDs –Export to planning program –Create equivalents at boundaries as needed –Automate changes in protection program for future updates (Demonstrated at MSRATF meeting)

12 Breaker Node Continental interest to move planning models from Bus/Branch to Breaker Node NERC paper Proposal for Development and Use of a Single Node-Breaker Topology Representation for Off-line and Real-time Study Models