Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Standards Review Subcommittee Update February 19, 2013.
Standards Review Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update February 1, 2011.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Frequency Responsive Reserve Process Update
Questions about AVR & PSS
Bulk Electric System Definition Task Force Update Michelle Mizumori June 18, 2009 Salt Lake City.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
WECC Response to BAL-002-WECC-1 Remand Order December 10, 2010 WECC Board of Directors Meeting Steve Rueckert Director of Standards.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
INT-008-WECC-RBP-2 Mike Pfeister Salt River Project Joint Session January 10, 2013.
RELIABILITY POLICY ISSUES COMMITTEE REPORT JANANNE SHARPLESS NON-AFFILIATED DIRECTOR APRIL 28, 2009 CORONADO, CALIFORNIA.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Bulk Electric System Definition Task Force Update Joint Standing Committee Meeting October 21, 2010 Brian Theaker, BESDTF Chair.
The Western Electricity Coordinating Council Document Categorization Project Steve Ashbaker February 19, 2009 RPIC Meeting – February 19, 2009.
Underfrequency Load Shedding Report
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair.
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee July 29, 2009 Loveland, Colorado.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
Brian Theaker RCWG Chair
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2009 San Diego.
NERC Footnote b / 12 – Load Loss
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Current Activity Summary
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Presented to PGDTF February 11, 2015
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
WECC and NERC Protection Criteria and Standards
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Standards Review Subcommittee Update August 17, 2010.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Inverter Disconnects During Transmission Disturbances
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reliability Assessment Committee Proposal TSS Meeting
Project WECC-0100 Update Load Modeling Task Force
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Project WECC-0100 Update Load Modeling Task Force
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Information Sharing Policy Update March 25-26, 2014
Presentation transcript:

Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair

Todays Update BES definition proposal Material Impact Assessment Schedule Questions 1.2

December 2009 RPIC Guidance Phase 1 – focus on what Elements are part of the BES Transmission voltage performance Targeting OC approval in June Phase 2 – evaluate how entities may impact BES reliability Generators Loads Scope and timing undefined 1.3

Recent Events Posted on February 12: Proposal 4 MIA status (Appendix A) BES white paper (Appendix B) Response to comments on P3 Comments on P4 due 3/17 1.4

Proposal 4 Reformatted for clarity, eliminate conflict Tightened up radial exemption < 200 kV, serving only load, not hard-tapped Distribution Networks Networks > 100 kV that serve load and do not provide meaningful flow-through Seeking to define in a way that would allow exclusion from BES without an MIA Struggling and seeking comment 1.5

Proposal 4 – (2) Points of demarcation Automatic fault interrupting device Is AFID part of BES? Complex connections (ring bus, breaker-and-a- half) Protection systems and PRC-004/

Proposal 4 – (3) Exclude Elements not represented in WECC-SRWG Annual Study Plan Basecases Will be controversial - expect comments 1.7

Material Impact Assessment Process must be: Clear and objective Technically defensible Accessible Repeatable Concerns: Regulatory approval (NPCC experience) Burden on smaller entities without study capabilities Burden on WECC staff to review Administrative process – logging, renewal, etc. 1.8

Material Impact Assessment Phase 1 – focused on: Transmission voltage performance Classifying BES Elements Two approaches: Three-phase fault with delayed clearing Scan for significant and widespread impacts Short-circuit MVA 1.9

Material Impact Assessment (2) TSS review Discussed with TSS on 1/20 TSS has formed task force to consider Use of three-phase fault with delayed clearing Generator and load tripping inevitable How much / what kind of tripping is allowed? Can alternate approaches be combined? Use SCMVA approach as a screen to reduce number of simulation studies? 1.10

Schedule Fourth Proposal posted on 2/12 Presenting to joint MIC/OC/PCC meeting on March 11 Seeking OC feedback 1.11

Schedule (2) Continue to develop MIA TSS and BESDTF MIA small group Post MIA for 45-day comment period Seek OC approval of BES definition and MIA in June (?) Waiting for TSS input makes June impossible Six-month gap between October and March Phase 2 - TBD 1.12

Questions? For every complex problem there is an answer that is clear, simple, and wrong. H.L. Mencken Things should be made as simple as possible, but not any simpler. Albert Einstein Brian Theaker Chair, BESDTF