RPEWG Report to PCC Seattle, WA June 2003. RPEWG June 20032 Agenda 1.SRP Double PV-WW PBRC Adjustment Seven Step Process 2.Phase 1 PBRC Adjustment Review:

Slides:



Advertisements
Similar presentations
A. BobbioBertinoro, March 10-14, Dependability Theory and Methods 3. State Enumeration Andrea Bobbio Dipartimento di Informatica Università del Piemonte.
Advertisements

SWAT Common Corridor Task Force Update November, 2008.
Parameterized Tractability of Edge-Disjoint Paths on Directed Acyclic Graphs Aleksandrs Slivkins Cornell University ESA 2003 Budapest, Hungary.
Geography in Higher Education in. 03 February 2014HERODOT Network National situation Use 1-2 slides to comment on nationally: University system.
APNOMS A Flexible Policy Control Architecture for Inter-AS Routing Osamu Akashi, Kenichi Kourai, Kensuke Fukuda, Toshio Hirotsu, Koji Sato, Mitsuru.
Bonn, 16 October Climate Risk and Early Warning Integrating all of the factors of disaster risk, across time scales of days to decades Second International.
WS Choreography v.0-1 Overview This is work-in-progress David Burdett, Commerce One 18 June 2003.
THE COMMONWEALTH FUND Source: McCarthy and Leatherman, Performance Snapshots, Adverse Events and Complications of Care per.
1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
WECC TRD/NERC TADS Webinar
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
RPEWG REPORT June 2002 PCC Meeting James Leigh-Kendall.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Annual Meeting of ISPA Partners , Centre Borschette (CCAB), Brussels, 9-10 April From ISPA to Cohesion and Structural Funds DG Regio - Ispa.
Annual Meeting of ISPA partners THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels, 9 April 20031/9 EDIS The final phase Martin BECK.
Meeting of 9 and 10 April Financial rules of the Structural and Cohesion Funds DG Regio - Ispa nkb Financial Management : the n+2 rule Organised.
Basic Wave Theory Review
1/10/20031 End-to-end QoS in the users' point of view ITU-T Workshop Geneva 1-3 October 2003 P-Y Hébert - ETSI.
May International and European M.Eng. Introduction of 5th year technical options Master of Engineering for 2003 Introduction for students to the.
Milano 25/2/20031 Bandwidth Estimation for TCP Sources and its Application Prepared for QoS IP 2003 R. G. Garroppo, S.Giordano, M. Pagano, G. Procissi,
All Rights Reserved, Copyright © FUJITSU LABORATORIES LTD An approach to KNOW-WHO using RDF Nobuyuki Igata, Hiroshi Tsuda, Isamu Watanabe and Kunio.
Koeln 15 and 16 May Results of research on sector Equal – Logicomp IT-G-VEN-018 Gilberto Gobbo.
25 July Navigating Doors. 25 July Starting the Program A Doors shortcut icon is on the computer desktop Double-click the icon to start Doors.
25 July Find ID. 25 July Identifies a Card Identifies to whom the card was assigned Three methods for identification: –By presenting a card.
February 5, MS-Series Readers and Credentials.
28 July Doors Creating Time Zones. 28 July What is a Time Zone? A designated period of time in which access can be granted to a secure area.
Eigen-decomposition Techniques for Skywave Interference Detection in Loran-C Receivers Abbas Mohammed, Fernand Le Roux and David Last Dept. of Telecommunications.
Mining for Patterns Based on Contingency Tables by KL-Miner First Experience Jan Rauch Milan Šimůnek (PhD. student) Václav Lín (student) University of.
Multiple Sensor Precipitation Estimation over Complex Terrain AGENDA I. Paperwork A. Committee member signatures B. Advisory conference requirements II.
© McClureTech Inc System Engineering Applying Architectural Principles to Complex System Development.
V3/13DAEC 18 March CONTRACTOR SUPPORT ON THE BATTLEFIELD -- AN INDUSTRY PERSPECTIVE PRESENTATION TO DEFENSE ACQUISITION EXCELLENCE COUNCIL BY ALAN.
27 June Report on two themes: Airport Management Weather & Environment by: Jan Terlouw (NLR) ATM 2003 Seminar, Budapest June 27, 2003.
The European Parliament and the Semantic Web - Some considerations Peter Brown Head of Information Resources Management European Parliament 01D-GRI_GEN(2003)0014.
SWCAP Budgeting July 30, 2003.
July 30, Pro Rata Budgeting. July 30, Pro Rata Budgeting Pro Rata Detail by Funds reports are available on the Internet no later than October.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Doug Tucker of WECC & Milorad Papic of IPC 2012 TRD/TADS Webinar October 23, 2012.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Reconstruction of Smooth Surface Suitable for LOD Model Construction Jaroslav Semančík KSVI MFF UK Josefův Důl, MIS 2003.
27 June Decision Support Summary 27 June 2003.
Public Policy, Grass Roots Action Major social policy influences and initiatives Characteristics of rural communities Putting policy into practice Sylvia.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Using XSLT for Interoperability: DOE and The Traveling Domain Experiment Monday 20 th of October, 2003 Antoine Isaac, Raphaël Troncy and Véronique Malaisé.
A. BobbioReggio Emilia, June 17-18, Dependability & Maintainability Theory and Methods 3. Reliability Block Diagrams Andrea Bobbio Dipartimento di.
Analog and Low-Power Design Lecture 20 (c) Lecture 20 Current Source Biasing and MOS Amplifier Design Michael L. Bushnell CAIP Center and WINLAB.
A. BobbioReggio Emilia, June 17-18, Dependability & Maintainability Theory and Methods 5. Markov Models Andrea Bobbio Dipartimento di Informatica.
Arizona Corporation Commission Workshop
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Phase Difference = Phase Difference = 0.05.
Citrix Partner Locator Phase I November 13, 2008.
Arizona Corporation Commission Energy Workshop February 16, 2001.
1 Arizona Department of Health Services Will Humble, Director Public Health Emergency Preparedness Overview.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
亚洲的位置和范围 吉林省白城市洮北区教师进修学校 郑春艳. Q 宠宝贝神奇之旅 —— 亚洲 Q 宠快递 你在网上拍的一套物理实验器材到了。 Q 宠宝贝打电话给你: 你好,我是快递员,有你的邮件,你的收货地址上面 写的是学校地址,现在学校放假了,能把你家的具体 位置告诉我吗? 请向快递员描述自己家的详细位置!
Tasks Complete the two pages on Sampling techniques in your booklets Complete the page on controlling Extraneous variables and bias in your.
Freeport Area Master Plan Project -
Eleanor Ewry Base Case Coordination Subgroup Chair
RCSA Funding Proposal.
Tips Need to Consider When Organizing a College Event
RCSA Funding Proposal.
ماجستير إدارة المعارض من بريطانيا
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
For More Details:
Presentation transcript:

RPEWG Report to PCC Seattle, WA June 2003

RPEWG June Agenda 1.SRP Double PV-WW PBRC Adjustment Seven Step Process 2.Phase 1 PBRC Adjustment Review: Robust Line Design

RPEWG June SRP Double PV-WW PBRC Adjustment Request Salt River Project requests a PBRC Adjustment from Category C to Category D for the double Palo Verde to Westwing line outage Evaluated using Seven Step Process

RPEWG June SRP Double PV-WW PBRC Adjustment WW Step 1: Provide Project Description Detailed report provided.

RPEWG June SRP Double PV-WW PBRC Adjustment PV-WW performance has been excellent No double outage One line 2 outages and second line 0 outage Sample developed from SGS data for SW EHV lines Very few SW EHV line on shared corridors Step 2: Identify the Statistical Base

RPEWG June SRP Double PV-WW PBRC Adjustment Sample from matching terrain, weather conditions and structure type 39 circuits MTBF N-2 Weibull method of analysis Coincident Independent events = 500 years N-2 Dependent event analysis = NA Step 3: Uncorrected MTBF

RPEWG June SRP Double PV-WW PBRC Adjustment #1. MTBF Analysis: Lines w/<1.5 outage/year except Mead-Phoenix included 17 corridors 2 instances of N-2 events N-2 Weibull MTBF Coincident Independent events = 2,824 years N-2 Dependent event analysis = NA Step 4: Corrected Estimate of MTBF 1. MTBF analysis ……….. 2. Robust Line Design Features

RPEWG June SRP Double PV-WW PBRC Adjustment #2. Robust Line Design Features: RPEWG used its Robust Line Design Features working paper to evaluate the robustness of the line design. The analysis compared thirteen factors in examining the line robust features. Two areas of concern were critically evaluated Mead Phoenix line crossing over PV-WW Circuit separation preventing towers falling into each other Step 4: continued

RPEWG June SRP Double PV-WW PBRC Adjustment The conclusion from the Robust Line Design Features evaluation was that the PV-WW lines meet or exceed the Robust Line Design Features required for PBRC adjustment. Step 4: continued

RPEWG June SRP Double PV-WW PBRC Adjustment 2% of time double PV-WW will be critical outage Existing safety net will remain in place during time when PV-WW double outage is the critical outage Step 5: Exposure Analysis

RPEWG June SRP Double PV-WW PBRC Adjustment Step 6: Consequences of Outage System safety net will remain in place Operating studies show that voltage dip with PV-WW outage will not exceed 30% voltage dip criterion

RPEWG June SRP Double PV-WW PBRC Adjustment RPEWG members voted to approve and recommend that PCC also approve SRPs request for PBRC Adjustment for the double PV-WW line outage from Category C to Category D. RPEWG cannot make a recommendation regarding MTBF of greater than 300 years. Step 7: Recommendation

RPEWG June SRP Double PV-WW PBRC Adjustment PCC discussion & vote

RPEWG June Phase 1 PBRC Adjustment Review: Robust Line Design

RPEWG June Risk Factors The following is a list of risk factors to be considered in ROW planning for cases where it is the goal that the N-2 outage be of very low probability. Generally risk increases with common ROW distance. R1 Risk of fire affecting both lines R2 Risk of one tower falling into another line R3 Risk of a conductor from one line being dragged into another line R4 Risk of lightning strikes tripping both lines R5 Risk of an aircraft flying into both lines R6 Risk of station related problems resulting in loss of two lines for a single event R7 Risk of snow or earth slides R8 Risk of loss of two lines due to an overhead crossing

RPEWG June Design Variables The following are design variables which affect the credibility of each of the above Risk Factors: V1 Substation breaker configuration (R6) V2 Circuit centerline spacing (R1,R2,R3,R8) V3 Span length (R3) V4 Tower design (R2,R7,R8) V5 Use of shield wires for lightning (R4) V6 Conductor support systems (R8) V7 Use of dead-end versus suspension towers (R3) V8 Use of single pole reclosing (R4) V9 Vegetation management (R1) V10 Fire watch curtailments (R1) V11 Shortening of line on common ROW (R1-R8) V12 Tower grounding (R4) V13 Protective relaying design and settings (R6)