Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
NERC Policies Introduction
Terms. 1. Globalization 2. Financing 3. Inputs.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
June 22, 2005 NAESB Board of Directors Meeting, San Antonio, Texas 1 North American Energy Standards Board Meeting of the Members NAESB Board of Directors.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
© 2004 Dominion Dominion Proposal January 24, 2005.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Standards Review Subcommittee Update February 1, 2011.
NAESB Coordinate Interchange
Business Practices Subcommittee Update February 2, 2010.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Bob Harshbarger Volunteer Order 771 January 16, 2013 Still Icy-Cold Salt Lake.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
- GDP 2011 versus 2010 – increase by 5.5%
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
Addition Facts
ZMQS ZMQS
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Richmond House, Liverpool (1) 26 th January 2004.
FERC Order minute Scheduling.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
EMS Checklist (ISO model)
ABC Technology Project
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Highlights of the 2003 New York ISO State of the Market Report David B. Patton, Ph.D. Potomac Economics Independent Market Advisor April 14, 2004.
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
VOORBLAD.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
SEPTEMBER 12, 2012 | MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Hourly Offer and Intraday.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
How Cells Obtain Energy from Food
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Texas Pipeline Association
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation.
FERC Staff’s Report on Demand Response and Advanced Metering.
Presentation transcript:

Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011

2 Ancillary Services Firm Exchanges Severe Weather Inquiry Topics for this Report

3 FERC Ancillary Services NOI RM June 16, 2011 Third-Party Provision of Ancillary Services Accounting and Financial Reporting for New Electric Storage Technologies Frequency Regulation NOPR

4 FERC NOI Comment period ended August 22, 2011 Comments from 50+ entities. Support for adjustments to expand Ancillary Service markets. Broad range of approaches suggested. No issuance by FERC yet.

5 FERC Locational Exchange NOI EL Petition for Declaratory Order Locational exchanges are not transmission transactions that must be conducted under authority of an OATT, but rather are wholesale power sales transactions. NOI - RM – February 2011 –Comments due by April 25, 2011 –About 20 commenters.

6 FERC NOI Comments generally supportive. Suggest NOI be used to provide guidance for use of exchanges. No issuance by FERC yet

7 Southwest Cold Weather Event February 1-5, 2011 Widespread electricity outages and natural gas curtailments in Texas and other Western states. Approximately 4.4 million electric customers in ERCOT and WECC affected. Service curtailed to over 50,000 gas customers in New Mexico, Arizona and Texas.

8 Southwest Cold Weather Event FERC, NERC and State Commission inquiries. FERC & NERC joint inquiry and report. –AD Identify the causes of the disruptions and identify any appropriate actions for preventing their recurrence. Report issued August 16, 2011.

9 Cold Weather Event Longest sustained cold spell in 25 years. Temperatures at least 15 F below normal. Extreme in terms of temperature, wind and duration of event. Storm extreme not without precedent.

10 Cold Weather Event

11 Electric System Issues Loss or unavailability of generation. –67% attributable to weather. –12% indirectly weather related. –Winterization. Over 250 unit outages in ERCOT, WECC and SPP. 1.2 million MWh of energy unavailable. Some transmission limitations.

12 Electric System Issues Southwest - Number of Units Tripped, Derated, and Failed to Start - Feb , 2011

13 Gas System Issues Production declines. –Freeze-offs. –Icy roads. –Rolling blackouts. –Winterization. Processing plant impacted by wellhead problems and volumes. Time consuming chore of manually shedding some customers.

14 Gas System Issues

15 Gas System Issues

16 Key Findings & Recommendations Electric Entities should consider preparation for winter season as critical as summer peak season. Take steps to assure black start units can be utilized during severe weather events. Real output capability forecast should consider severe weather forecasts. –TOP R15

17 Key Findings & Recommendations Electric States should consider rules requiring winterization plans. Communication processes should be improved between reliability and market participants during severe weather events.

18 Key Findings & Recommendations Electric NERC has committed to submit a Standards Action Request to require generators to develop, maintain and implement plans for winterization of their units.

19 Key Findings & Recommendations Gas States should consider whether adoption of weatherization standards is warranted for the gas industry. States should be approached concerning exemption critical gas production and processing facilities from rolling blackouts.

20 Cold Weather Event Report Resources Materials and graphics in presentation from The Report on Outages and Curtailments During the Southwest Cold Weather Event on February 1-5, 2011.

21 Links to FERC-NERC Report A-4-presentation.pdfhttp:// A-4-presentation.pdf report.pdf

22 FERC Meeting Agenda October 2011 RM /AD Frequency Regulation Compensation in the Organized Wholesale Power Markets.

Philip Tice Deseret Power Electric Cooperative