VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.

Slides:



Advertisements
Similar presentations
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Advertisements

WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Base Case Coordination System RFP David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah.
WECC TRD/NERC TADS Webinar
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Budget Overview Jillian Lessner Controller May 7, 2009 JGC Annual Leadership Training.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
1 TEPPC March 25, CCPG Transmission Providers.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Loads and Resources Subcommittee Report Wally Gibson, NWPCC PCC Meeting June 10-11, 2010.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Tier One Standards Update Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake City, Utah.
Overview of WECC Comments to FERC on the NOPR Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2009 San Diego.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 24th, 2013 Anaheim, CA.
SRWG Chair Report March 2015 WECC HQ
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
Keegan Moyer Manager, Transmission Expansion Planning TEPPC Update July 16, 2014 WECC - Salt Lake City, UT.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Ann Finley VGS-PCC Liaison VGS Discussion March 25-26, 2014 Salt Lake City, Utah.
JJ Jamieson MIC Chair MIC Report for ISAS August 2014 Salt Lake City.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
JJ Jamieson MIC Chair JGC update September 2014 Salt Lake City.
Jim Price Chair, Market & Seams Issues Subcommittee MSIS Update to Market Interface Committee March 24, 2015 Salt Lake City, UT.
Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Ann Finley VGS-PCC Liaison VGS Discussion July 15-16, 2014 Salt Lake City, Utah.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC MAC Committee Update
Reliability Assessment Committee
SRWG Chair Report March 2015 WECC HQ
Donald Davies Chief Senior Engineer
Variable Generation Subcommittee Update to PCC
Generator Operator Work Group (GOWG)
WECC Scenario Task Force (WSTF)
Presentation transcript:

VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010

WECC Committees MIC OCJGC VGS Planning WG Operating WG Technology WG Marketing WG PCC

PWG Meetings Initial Conference Call Meeting SLC 2009 Meeting Spokane Sep 11 Sep 15 Oct 2 Oct 26 Nov 16 Feb Meeting Portland Meeting SLC Conference Call Jun 15 Upcoming Meeting SLC

Planning Work Group Activity Update 4 Participate, gather and report on: P1 - VG model validation Certain generic wind turbine, Solar PV, and battery energy storage models are available in PSLF and/or PSS/E. Investigating others. P2 - Relevant NERC activities Reviewed NERC IVGTF efforts and white paper examining capacity values and flexibility metric

5 Planning Work Group Activities Update Reviewing methodologies for assigning trans. capacity for wind: LOLE and LOLP Request more volunteers. P3 - Transmission capacity assignment and adequacy for accommodating the integration of VG P4 - Standardizing and Validating Planning Criteria and Methodologies Issued a draft whitepaper on Wind Capacity Issues prepared jointly with WECC LRS. Literature Review & Data Issues - focus on July 24, 2006.

6 Planning Work Group Activities Update P6 - Create a centralized database for VG Circulated a survey on availability and quality of VG data Responses were due April 12, will help drive data collection efforts and identify confidentiality issues. P7 – System Dynamics Issues Distributed an initial draft list of prioritized dynamics studies to evaluate high VG scenarios across WECC Continue collecting information from WECC staff, TSS, SRWG, MVWG and PCC as well as other dynamic studies and reports.

7 Planning Work Group Next Steps Meet June 15 in Salt Lake City Continue work on Activities P1-P7 FERC NOI on Variable Energy Resources Encourage increased participation in PWG Discuss PWG role and expectations within TSS, TEPPC, ColumbiaGrid, NTTG and Westconnect Identify highest priority planning needs for VG