WECC TEPPC Meeting SWAT Update

Slides:



Advertisements
Similar presentations
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.
Advertisements

Sierra Subregional Planning Group 10-year Transmission Plan
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Advanced Piloting Cruise Plot.
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007.
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Central California Clean Energy Transmission Project
1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
NTTG Report to TEPPC BiennialTransmission Plan.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
WECC TEPPC Meeting SWAT Update
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Welcome to Who Wants to be a Millionaire
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
1 Copyright Copyright 2012.
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
City Council Meeting Agenda Items October 28, 2013.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
We will resume in: 25 Minutes.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Partial Products. Category 1 1 x 3-digit problems.
Regional Transmission Planning Update on WECC TEPPC Efforts on Western Interconnection Wide Planning Arizona Corporation Commission 6 th Biennial Transmission.
Arizona Corporation Commission Workshop
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
Arizona Corporation Commission Energy Workshop February 16, 2001.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
APS Ten-Year Plans th BTA Presentation
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
Navajo Transmission System
APS Deer Valley Facility Phoenix, Arizona June 22, AM -12 PM
Deliverability Maps for 2017 Peaking Capacity RFP
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
RPCG – 2026 CCTA Results and Next Steps
Presentation transcript:

WECC TEPPC Meeting SWAT Update Western Electricity Coordinating Council Transmission Expansion Planning Policy Committee WECC TEPPC Meeting SWAT Update Robert Kondziolka Salt River Project March 25, 2010 Salt Lake City, Utah TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Footprint One of the WestConnect Sub-Regional Planning Groups http://www.westconnect.com SWAT Footprint One of the WestConnect Sub-Regional Planning Groups SWAT Southwest Area Transmission TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Transmission Projects in WECC Regional Planning, Path Rating Process, or Development Chinook Zephyr TransWest Express SWIP High Plain Express Pinal West to Pinal Central Pinal Central to Browning Pinal Central to Tortolita Morgan to Pinnacle Peak Palo Verde to Sun Valley Sun Valley to Morgan SPPR Navajo Transmission Project Segment 1 Palo Verde–Devers II California Portion Tres Amigas Santa Fe Palo Verde-North Gila II SunZia South Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

EHV Transmission Upgrades In Development Nevada 2009 625MW Energized To Intermountain Utah To Celilo Harry Allen Crystal California Marketplace Mead McCullough Navajo 2009 625MW Energized Eldorado 2010 600MW Four To Midway Corners Mohave Yavapai Adelanto Moenkopi Victorville Sylmar Vincent Peacock Lugo Cholla Rinaldi Toluca Mira Loma Arizona Coronado Serrano Devers 2010 400MW Energized Valley Perkins Westwing DPV2 Project Palo Verde Rudd Miguel Imperial Valley Harquahala Liberty North Gila Kyrene Silver Jojoba King Saguaro +/- 500 kV DC line 500 kV line 345 kV line Major Substation Major Power Plants 500kV Line Upgrade TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Status of Major New Transmission Projects Project Name Voltage Capacity Proposed In-Service Sponsor Status Pinal Central to Browning 500kV 1400MW 2011 - 2nd Qtr SRP In Construction Pinal West to Pinal Central 2014 - 2nd Qtr In Design & ROW Acquisition Palo Verde to Sun Valley 650MW APS Sun Valley to Morgan 1200MW 2016 - 2nd Qtr Morgan to Pinnacle Peak 1000MW 2010 – 4th Qtr Arizona Gateway South (Double Circuit) 345kV 2000MW 2014 TEP In Perpetual Federal Permitting Navajo Transmission Project 1500MW 2012 DPA In Path Rating Study Process Palo Verde to North Gila II 1250MW Palo Verde to Devers II (California Only) 2012 – 4th Qtr SCE In Siting & Permitting TransWest Express (Bi-Pole DC) 600kV 3000MW 2015 Anschutz In Siting & Permitting & Path Rating Chinook and Zephyr (Bi-Pole DC) 6000MW TransCan Pinal Central to Tortolita ON-Line … Consolidated into SWIP 2012 - 4th Qtr NVEnergy SWIP – Southwest Intertie Project (South) Phase I 2012 LS Power Project kV MW 20XX ID I SunZia Southwest Trans Project (2 Circuits) SW Power In Path Rating Process & Permitting High Plains Express Initiative (2 Circuits) 3500MW 2017+ Xcel Feasibility Studies TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Western Area Power Administration Transmission Infrastructure Program Sonoran-Mohave Renewable Transmission (SMRT) Project A—Palo Verde-North Gila 500-kV, 100 miles B—Palo Verde-Blythe 500-kV, 110 miles C—North of Parker Potential double circuit, 230/500-kV, 190 miles C—South of Parker Potential double circuit, 230/500-kV, 330 miles D−Imperial Valley Potential 500-kV network addition to the Southern California grid in Imperial County, California, miles TBD TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Summary - R. Kondziolka SWAT 2010 Progress CRT Subcommittee RMR Studies for Yuma and Mohave counties Yuma 230kV Ring and Western TIP SMRT SATS Subcommittee 2009 study work approved and filed Alternative evaluation and VAR Margin study Short Circuit Work Group Expanding area to include southern California Retained consultant for CAPE, ASPEN, PSS/E NM Subcommittee Wind collector and integration system, include pass through SWAT Renewable Transmission Task Force Coordination with TEPPC studies TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Summary - R. Kondziolka SWAT 2010 Progress CATS Subcommittee Development of WestConnect Base Cases Joint MOD-029 Studies Transmission Corridor Planning Committee WGA Roadmap/Primer for Transmission Development BLM Arizona Restoration Design Energy Projects Western’s Transmission Infrastructure Program (SMRT) Arizona Corporation Commission Biennial Transmission Assessment 4th Qtr 2009 - Utilities filed reports identifying top 3 renewable transmission projects and workshop to address filings Initiating 6th BTA TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Arizona Renewable Generation Interconnection Requests 250MW 500MW 250MW 500MW 500MW 500MW APS Solar Wind SRP TEP WAPA CAISO Interconnection Queue Listing As of 2/8/10 340MW 260MW 8102MW 200MW 1000MW 100MW 3244MW 600MW 500MW 390MW 300MW 500MW 200MW 150MW 700MW 2095MW 150MW 300MW 50MW 18.9MW 800MW 1400MW 110MW 50MW 400MW 50MW 900MW 125MW 150MW 700MW 300MW 125MW 700MW 2950MW 180MW 250MW 700MW 20MW 180MW 100MW 700MW 20MW 180MW 125MW 70MW 150MW 20MW 1275MW 180MW 125MW 125MW 1600MW 80MW 297MW 500MW 500MW 99MW 400MW 480MW 250MW 2000MW 99MW 150MW 10MW 150MW 40MW 20MW 600MW 280MW 750MW 300MW 87MW 20MW 45MW 290MW 480MW 200MW 20MW 20MW TEPPC 3-25-10 SWAT Summary - R. Kondziolka 960MW 20MW 5MW 20MW

SWAT Summary - R. Kondziolka TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Summary - R. Kondziolka TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Summary - R. Kondziolka TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Summary - R. Kondziolka TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Summary - R. Kondziolka Morgan 500/230kV Substation TEPPC 3-25-10 SWAT Summary - R. Kondziolka

SWAT Summary - R. Kondziolka Morgan 500/230kV Substation TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Morgan to Pinnacle Peak 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinnacle Peak 500/230kV Substation TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Pinal Central to Abel to Browning 500/230kV Transmission Line TEPPC 3-25-10 SWAT Summary - R. Kondziolka

Western Electricity Coordinating Council Transmission Expansion Planning Policy Committee Questions? Details http://www.westconnect.com Contact Information Robert E. Kondziolka Robert.kondziolka@srpnet.com (602) 236-0971 TEPPC 3-25-10 SWAT Summary - R. Kondziolka