Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
In-Home Pantry Inventory Updated: November Background and Methodology Background In 1996 a National Eating Trends (NET) pantry survey found that.
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Sequential Logic Design
Addition and Subtraction Equations
Business Practices Subcommittee Update August 17, 2010.
Business Practices Subcommittee Update February 2, 2010.
Standards Development and Approval Process Steve Rueckert Director of Standards Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake.
NERC Orientation Joint Guidance Committee WECC Leadership
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
Tier One Standards Update Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake City, Utah.
NERC Fill in the Blank Standards Efforts Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake.
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
The basics for simulations
Connecticut Mastery Test (CMT) and the Connecticut Academic Achievement Test (CAPT) Spring 2013 Presented to the Guilford Board of Education September.
Employee & Manager Self Service Overview
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Progressive Aerobic Cardiovascular Endurance Run
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
2.4 Bases de Dados Estudo de Caso. Caso: Caixa Eletrônico Caixa Eletrônico com acesso à Base de Dados; Cada cliente possui:  Um número de cliente  Uma.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
WARNING This CD is protected by Copyright Laws. FOR HOME USE ONLY. Unauthorised copying, adaptation, rental, lending, distribution, extraction, charging.
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Steve Rueckert – Director of Standards
WECC Regional Standards Update
Merrill Brimhall – Engineer, Staff
Presentation transcript:

Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance

Standards Recently Approved Missing Measures and Compliance Elements 20 different standards Initial ballot held October 6-16, 2006 Final ballot held October % Quorum 69.48% approval System Operating Limits Methodology and Communication (FAC-010, 011, and 014) Initial ballot held September 19-29, 2006 Final ballot held October % Quorum 71.66% approval (vs. 74.5% on initial ballot)

Standards Recently Voted Down Operating Personnel Credentials (PER-003-1) Clarification of interpretation Initial ballot held September % Quorum 9.90% Approval Interpretation of applicability not passed

Standards Recently Balloted Violation Risk Factors Protection and control 81.52% quorum, 71.62% approval Balance and Interchange 82.67% quorum, 77.15% approval Communications and Facilities 81.59% quorum, 75.64% approval Emergency Operations 82.01% quorum, 68.85% approval Interconnection Reliability Operations 81.59% quorum, 75.77% approval

Standards Recently Balloted Violation Risk Factors Modeling 82.25% quorum, 83.62% approval Personnel 81.65% quorum, 65.34% approval Transmission Operations and Voltage Control 81.65% quorum, 77.83% approval Transmission Planning 82.01% quorum, 73.45% approval

Standards in the Ballot Process None

Standards Posted for 30-day Pre-ballot Review None

Standards Undergoing Comments Transmission Relay Loadability (PRC-023-1) TOS Codifies relay loadability criteria from Blackout Recommendations Second draft of this standard Comments due February 7 (30 day)

Standards Undergoing Comments Balance Resources and Demand (BAL-007 – 011) OC/CMOPS/PWG Changes based on stakeholder input Conformance with NERC Standards Development Procedures and ROP Comments due January 31

Standards Undergoing Comments IROL Standards (IRO-007 – 010) OC/CMOPS Require RC to monitor wide area, have plans to prevent and mitigate IROLs, direct action to support operating within IROLs, and spedify and collect data to meet these requirements. Conformance with NERC Standards Development Procedures and ROP Comments due February 15

Standards Undergoing Comments Facility Ratings (FAC and ) TSS/RS ?? SAR and Standard posted together Few changes Merge into one standard Address FERC Concerns Conform with NERC Rules of Procedure (ROP) Comments due February 28 (45 day)

SARs Undergoing Comments Vegetation Management (FAC ) Responsibility ?? Address FERC Concerns Conform with NERC ROP Comments due February 14 (30 day)

SARs Undergoing Comments Reliability Coordinator Standards (27 standards) OC/RCS ?? Proposes retiring, modifying, or additions Address FERC Concerns Conform with NERC ROP Comments due February 14 (30 day)

Drafting Team Nominations Facility Ratings SAR and SDT (FAC-008 and FAC-009) Vegetation Management SAR Drafting Team (FAC-003) Address concerns identified by FERC Conform with NERC Rules of Procedure Nominations due by January 29

Other Activities Operate within IROL Limits Standard Drafting Team Addresses RC preparations and actions Nominations closed January 19 WECC representation? Three-year Reliability Standards Development Plan Plan for addressing necessary changes to NERC Standards Posted on NERC web site

New NERC Website Recognizes NERC as North American Electric Reliability Corporation Better layout Standard activity page is very helpful From home page select standards From standards page select Standards Under Development Link from WECC home page