I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.

Slides:



Advertisements
Similar presentations
Project QC Consultation on Proposed Reliability Standards and Supporting Documents Information Session with Entities Concerned January 11 and 16,
Advertisements

Mountain States Transmission Intertie (MSTI) Open Season Update Meeting Mountain States Transmission Intertie (MSTI) Open Season Update Meeting Wednesday,
National NAACP Convention Economic Opportunity in Your Community Roger A. Clay, Jr. President Insight Center for Community Economic Development July 9,
Standards Review Subcommittee Update October 22, 2013.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Fairfax County Transportation Committee November 29, 2011 Fairfax County Transportation Committee November 29, 2011 I 95 HOT Lanes Update.
November 16, Route 50 Corridor Loudoun County Parkway Route 28 Corridor Dulles Rail.
I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.
Welcome Interstate I-66 / Route 28 Preliminary Study Stakeholder Workshop May 29, 2012.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Consolidated Transportation Impact Analyses (CTIAs) Beyond Tysons
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011.
Metropolitan Transportation Authority July 2008 Financial Plan MTA 2009 Preliminary Budget July Financial Plan 2009 – 2012 DJC.
R188 Project Overview Overall Status Highlights Progress
Replacement of the Queens Approach Bronx-Whitestone Bridge
Impact of Federal Funds to Statewide Project Management and Program Update American Society of Highway Engineers September 13, 2011.
IntelliDrive for Safety, Mobility, and User Fee Project Cory Johnson Mn/DOT IntelliDrive Program Engineer.
FY12 Expenditures and Caseload Update Fiscal Committee September 10, 2012.
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Enhanced Pedestrian Crossing Treatments in Santa Monica ITE 2012 Western District Annual Meeting Session 8C Wednesday June 27, 2012 Sam Morrissey, P.E.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
TSPLOST Update River Valley Region TIA Citizen’s Panel April 24, 2014.
Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.
Understanding Multiyear Estimates from the American Community Survey Updated February 2013.
Overview of the Green Infrastructure Section of PWSAs Feasibility Study Presentation Charrette No. 3: April 19, 2013 Presenter: Ross Gordon, PE, CFM, LEED.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
1 Item 11, Presentation to the TPB, September 15, 2010.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
2013 Water Rate Study and Proposed Multi-Year Water Rate Adjustments 1.
BLACK MOUNTAIN TOWN SQUARE Building a Grander Front Porch.
Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.
Route 156 Bike Way and Sound View Improvements Public Information Presentation #5 March 6, 2014 Special Town Meeting scheduled for March 24, 2014.
LESNER BRIDGE REPLACEMENT PROJECT
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
TRB BRT Workshop July 22, 2008 ECTP Project Oversight Grantee Perspective.
The Inspection Panel 1818 H Street, NW Washington, DC USA Citizen-Driven Accountability: The Inspection Panel and Development.
State of Louisiana Office of Risk Management
Presented to the Project Certification Committee on March 23, NEW MEXICO PUBLIC REGULATION COMMISSION Request for Change of Scope : Public Regulation.
Request for Project Initiation :
AP CALCULUS AB 2012 Question 6 Form A Name_________________ Date __________Period___.
MT. PLEASANT A CLOSER LOOK AT ACADEMIC PERFORMANCE.
SCOH Technical Meeting October 18,  Why the new approach?  Risk-based Project Involvement  Required Project Actions  Compliance Assessment Program.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
MGT Efficiency Review Report Response Process Information that may inform budget development processes.
World Meteorological Organization Working together in weather, climate and water Scale of Assessments 2012 and 2013 Congress WMO.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Unemployment Insurance UI Tax Project Certification Change Request Department of Workforce Solutions Presentation to Project Certification Committee June.
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Highlights From the Survey on the Use of Funds Under Title II, Part A
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
R Street Improvement Project (30% Review Meeting) February 28, 2007 August 20, 2008 City of Sacramento R Street Market Plaza Project 16 th Street to 18.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
Overview of the Federal Aid Process for Transportation Projects.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Green Line Extension Project
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Design and Engineering Services
Presentation transcript:

I-95/Route 630 Interchange, Alternative E

FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 $4.5M$7.2M $13.0M$16.2M$22.5M $28.8M Needed to Complete: $157M Prior to 2007 Beyond July 2013 COST IN 2013 DOLLARS Preliminary Engineering$18,000,000 Right of Way and Utilities$48,000,000 Construction$120,000,000 Total$186,000,000 (1994) Project Funding and Schedule: I-95/Route 630 AUTHOR- IZATION SCOPING PRELIM. REVIEW FIELD INSPECTION ADVER- TISEMENT RIGHT OF WAY

I-95/Route 630 Interchange Status Summary VDOT will utilize consultants for project development VDOT will be seeking a consultant contract in the next few months Significant additional funding will be required Project will probably be developed in phases

I-95/Route 630 Interchange – additional item General Discussion: Through 2008 and into early 2009 VDOT will be performing additional studies to refine interchange design concepts and right of way footprint. An update of the Location Study will follow which will include an the NEPA required Environmental Assessment document and a Public Hearing. An interchange modification report will also be developed for FHWA approval to assure adequate performance of the design for future year traffic. It is anticipated these activities will be completed by late 2009 or early 2010.