Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008.

Slides:



Advertisements
Similar presentations
Producing energy does not have to threaten the environment. In fact, its very production can reap major environmental benefits. The United States biomass.
Advertisements

Federal Energy and Environmental Regulation Agencies and Laws
Salt Lake City, Utah Photo: Gary O. Merrill, GM, Murray City Power (Jan. 2006) GAS-TO-ENERGY PROJECT.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
1 CPV Maryland, LLC St. Charles Facility – an Update Sandra S. Patty PPRP Manager PPRAC Meeting Country Inn & Suites, Annapolis, MD August 26, 2008.
WASTEWATER SYSTEM MANAGEMENT by John Lisenko Wastewater systems are indispensable for community health. One of the signs of progress and civilization is.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
1 Future Changes in Fuel Mix of Electricity Generation in Hong Kong and Implications By Larry Chuen-ho Chow Professor, Department of Geography Director,
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Arguments Against Nuclear Power Development in Iran May, 2003.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Perspective On Growing EPA Environmental Mandates David Stippler, Indiana Utility Consumer Counselor 2012 NASUCA Annual Meeting Baltimore,
Federal Energy and Environmental Regulation Agencies and Laws
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Air & Waste Management Association Southern Section Tennessee Solid Waste Update Barry R. Stephens, P. E. September 12, 2012 Department of Environment.
Institutions and Processes for Scaling Up Renewables: Run-of-River Hydropower in British Columbia Mark Jaccard, Noel Melton and John Nyboer Energy & Materials.
NORTH CENTRAL FLORIDA REGIONAL PLANNING COUNCIL REPORT AND RECOMMENDATION ALACHUA WEST DRI.
Sithe Global Power, LLC Toquop Energy Project. A 750 MW Coal fired electric generating plant Located 12 miles northwest of Mesquite, NV in Lincoln County.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
2009 Bidders Workshop Attachment D August 3, 2009.
Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Calvert Cliffs Unit 3 Update 1 Susan Gray, Power Plant Research Program Presentation to PPRAC September 27, 2010 Image or Graphic.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Transmission interconnect into the existing ‘Durbin-Monterey’ 69kV line 
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Indiana’s “NowGen” 630 MW IGCC Plant On-line the Summer 2012 Chairman David Lott Hardy.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
EPA’s Proposed CCB Regulations & Morgantown STAR Project 1 Shawn A. Seaman September 27, 2010
New Nuclear Generation Ellen Ruff President, Duke Energy Carolinas.
Nuclear Power Plant Hearing Combined Construction Permit and Operating License.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Adoption of the 2009 Skagit County Budget December 9, 2008.
1 Towards A Low Carbon Era Ms Anissa Wong, JP Permanent Secretary for the Environment The British Chamber of Commerce in Hong Kong Construction Industry.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
The Canadian Approach To Compiling Emission Projections Marc Deslauriers Environment Canada Pollution Data Division Science and Technology Branch Projections.
CALIFORNIA ENERGY COMMISSION California Bioenergy Action Plan Southern California Emerging Waste Technologies Forum Los Angeles, California July 27, 2006.
EMS Effectiveness in the Federal Community A Summary of Agency Responses to the “un scored” Metrics for Federal EMS Progress and Performance Reporting.
Background on Joint Land Use Studies Ft. McCoy and Monroe County, Wisconsin Bryan Law Mississippi River Regional Planning Commission.
Levy Nuclear Plant Overview of Water Issues Presented by Jamie Hunter to the FDEP – Central District’s 13 th Annual Power Generation Conference Lake Buena.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Fiscal Year 2017 Joint Hearing – Board of Selectmen and Advisory Board Budget Presentation Tuesday March 29, 2016.
Richland Creek Water Supply Program Status Update Paulding County, Georgia Board of Commissioners Work Session January 26, 2016.
The Case for IGCC Kay Pashos President, Duke Energy Indiana MARC 2006 Annual Meeting June 20, 2006.
 Final Plan published on October 23, 2015  Employs different method to develop state targets  Uses the proposal’s first three building blocks ◦ BB1.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Federal Energy and Environmental Regulation Agencies and Laws
CR3 and Crystal River Energy Complex
Nuclear Power Public safety concerns and the costs of addressing them have constrained the development and spread of nuclear power in the United States,
Nuclear Power Update for The Society of American Military Engineers
Plant Vogtle Units 3 and 4 Alex Thirkell.
Summary Resources are naturally occurring substances of use to humans.
Tajiguas Resource Recovery Project Doing More with Our Waste
Adding Nuclear Power to the Grid
Department of Environmental Quality Division of Water Resources
WIND ENERGY SITING REFORM LEGISLATION
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008

2 CPCN Case Background Unit 3 proposed for Calvert Cliffs site, Calvert Co. New unit would have net output of about 1600 MW, nearly doubling the capacity of the existing Units 1 and 2 combined – if constructed it would be the world’s largest reactor Applicant for CPCN is Calvert Cliffs 3 Nuclear Project, a wholly owned subsidiary of UniStar Nuclear Energy (which is a joint venture of Constellation and Electricité de France) PPRP filed initial recommended license conditions on 16 July 2008 PSC evidentiary hearings held August; also 3 public hearings in August

3 Key Issues Water use Ecology Air Impact Socioeconomics/Traffic

4 Water Use During construction, use of ground water for uses such as concrete mixing and sanitary water supply During operation, withdrawal of >50 mgd for cooling water Operational water use is much less than Units 1 and 2 (which withdraw >3,000 mgd combined), but a greater percentage of the Unit 3 will be lost to evaporation and not returned to the Bay

5 Ecology Calvert Cliffs 3 must construct facility in a way that minimizes impacts to wetlands, streams, forests USACE and MDE actively reviewing joint state/federal wetlands permit DNR’s review of Forest Conservation Plan near completion Critical Area Commission provided project approval in early August

6 Air Impact Use of Bay water in cooling tower gives rise to emissions with relatively high levels of dissolved solids – which constitutes particulate matter (PM) and requires detailed modeling of air quality impacts, use of Best Available Control Technology Other sources include oil-fired emergency generating units Much smaller emissions profile compared to similar- sized fossil fuel fired facility PPRP and MDE currently evaluating revised air emissions data that Calvert Cliffs 3 submitted at the PSC hearings earlier this month

7 Socioeconomics/Traffic Fiscal benefits to Calvert County and So. Maryland  ~4000 construction jobs  ~360 permanent jobs  Estimated $20 million in tax revenue to County Calvert Cliffs 3 working on detailed traffic study; will require SHA approval of road upgrades to support increased construction traffic MHT approval required for mitigation plans associated with impacts to historic resources on the site

8 Public Reaction Public comments at hearings showed strong local support for Unit 3 project Concerns raised by members of the public are being addressed by State’s recommended conditions, and/or through NRC licensing process  NRC has federal jurisdiction for radiological emergency planning, radiological health and safety, nuclear waste disposal

9 Current Status PPRP and Calvert Cliffs 3 actively working to reach agreement on as many recommended license conditions as possible PPRP/MDE evaluation of air quality impacts and water appropriations ongoing Additional coordination also continuing with SHA, DNR Forestry, USACE/MDE Expected date for CPCN issuance not yet determined, but we should be able to support Calvert Cliffs 3 proposed construction start date of May 2009

10 “Coming Attractions’ CP Crane Barge Unloader Catoctin Coal Testing at CP Crane