Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

Best Available Techniques (BAT)
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
ADBA PERMITTING WORKSHOP 27 March 2013 Stephen Barnes, Technical Director, Wardell Armstrong.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Rushcliffe Borough Council Development Management Process Changes to Planning Legislation Andrew Pegram Service Manager, Communities February 2015.
IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Planning Permission Process and Procedures
Comhairle Contae Maigh Eo Mayo County Council PERMITTING OF ENERGY PROJECTS A Local Authority Perspective Iain Douglas Senior Planner Engineers Ireland.
Air Conditioning Inspection Certificates Low Energy Consultancy can help LEC Ltd can conduct and provide ACI certification for all Air Con installed equipment.
Harmonization and Implementation/Enforcement of Environmental Legislation in the field of Industrial Pollution Control in Latvia Ilze Kirstuka Director.
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
Alex Radway Policy Advisor Process Industries Regulation.
Environmental Permitting Regulations Tom Fowler – Environment Officer
Implementation of IED Implications for industry, particularly those involved in waste management, and the influences it has on permitting Dynes Solicitors.
Biofuels and NetRegs (& Business Gateway) Alan Parnell.
The Environment Agency Alasdair McKellar – PPC/COMAH Regulatory Officer.
1 Proposed Waste to Energy Plant Planning Approval and Licensing Requirements Procedural Aspects Planning Procedure: Maria Lombard, Planning Consultant.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
The Development of Accreditation in the UK Paul Mudway Mudway Health, Safety & Environment.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
WG3 Leader: Michelle Bush International Working Forum for Regulatory Supervision of Legacy Sites (RSLS) – Technical Meeting October 2013.
TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
1 Permitting of industrial facilities in Croatia.
SEPA Compliance Assessment Scheme. Aims and Benefits 1.Proportionate 2.Consistent, fair and legally correct 3.Transparent and accountable 4.Targeted,
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
AйПиПиСи ?? IPPC implementation - experience from new EU member countries & changes brought by Industrial Emissions Directive Monika Přibylová Kiev, 10.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Innes Garden EP Charges Programme Manager. PPC Charging Discussion Document Follows on from previous consultations Proposing charge calculated from OPRA.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
IPPC Amcor Flexibles Reflex - Facility B. IPPC – AFR_B The Facility was qualified as an installation for surface treatment of products using organic solvents,
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
Priority Environmental Investment Programme National Workshop Serbia Overview Of EU Waste Policy Belgrade, 8 th May 2008 Ruslan Zhechkov, REC
David Morgan, CPI, Presentation to xxxxxx, 28 March 2008 IED Joint Seminar, Imperial College Sept 11 David Morgan, CPI, Presentation to xxxxxx, 28 March.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Exemptions Review Tessa Bowering Senior Environment Officer.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
EBC New Hampshire Chapter EBC New Hampshire Chapter Report from the NH DES Division Directors.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
Creating the environment for business Streamlining industrial emissions legislation Caspar Corden (Entec) Andrew Farmer (IEEP) IPPC Review Advisory Group.
Stephen Othen Technical Director Fichtner Consulting Engineers Ltd Monitoring – On-site and Off-site THE GROUP.
Resource Conservation and Recovery Act Draft Year: 1976 Amendment years: 1989 National/ Internatinal: National Law Sean Petersen, per:3.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Blue Skies Delaware; Clean Air for Life Synthetic Minor Permitting Process Steve Mann.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
IPPC Permit Procedure in the UK Kiev, 26 January 2011 Alex Radway Senior Advisor Environment Agency for England & Wales, United Kingdom.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Introduction to the philosophy
Ascending to IED compliance
Legislation Carl James.
MJAC Founded 1928 December 2016
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Ascending to IED compliance
Relationship between World Bank and Romanian EA requirements
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble

Fichtner Consulting Engineers UK Applying for a Permit for an Installation The Application Process (1) An application must— (a)be made by the applicant on the form provided by the EA; and (b)include the information specified on the form. (2)Every application must be accompanied by any fee prescribed in a charging scheme made by the regulator under section 41 of the 1995 Act or by the appropriate authority under regulation 65. The EA provides General Guidance on applying for a Permit and on Risk Assessment Specific Guidance on Waste Incineration The “operator” must apply for the permit

Fichtner Consulting Engineers UK Getting the Permit The Process: 1.Submit the application to the Environment Agency 2.Wait for it to be “duly made” 3.EA advertise the application – available on Covanta web-site 4.Public Consultation period of 4 weeks 5.Respond to requests for further information (“Schedule 5 request”) 6.Draft Permit issued to Covanta to check accuracy 7.Draft then issued for public consultation 8.Environment Agency issues permit The process should take 4 months to issue of draft permit, but may take longer. The clock stops while responding to Schedule 5 requests.

Fichtner Consulting Engineers UK What is in the application? 1.Application Form (Parts A, B2, B3 and F1) 2.Supporting Technical Information Information on Raw Materials List of emissions Description of Monitoring methods Justification of Technology (BAT) Justification of Energy Efficiency Information on Waste Recovery and Disposal Management Specific questions for legislation (WID) Site plan and location plan 3.Environmental Risk Assessment Qualitative Risk Assessment - tabular Air Quality Assessment Noise Assessment H1 Assessment – Environmental Risk 4.Application Site Report 5.Non-Technical Summary

Fichtner Consulting Engineers UK Table of Contents 1.The Application Forms 2.Non Technical Summary 3.Supporting Information Annex 1 – Plans and Drawing Annex 2 – Site Condition Report Annex 3 – Noise Assessment Annex 4 – Environmental Risk Assessment Appendix A – Greenhouse Gas Assessment (WRATE analysis) Annex 5 – Air Quality Assessment Annex 6 – BAT Assessment Annex 7 – Human Health Assessment

Fichtner Consulting Engineers UK Thank you for listening