Depending on number of homes and to maximize construction efficiencies, either a 8 way or 12 way tube bundle is deployed in the cut. At each drop, 1 tube.

Slides:



Advertisements
Similar presentations
……..Bridging the optical divide………
Advertisements

R&M Fiberliner LAN / WAN applications R&Measynet.
Special Mines Services An Employee Owned Company.
Sectional Assembly and Installation
Amphenol Outdoor Connectors
1 Telephone Connection. 2 Introduction The section instructs you on how to install a required phone line to every receiver.
Kevin Coke ID#: Rochede Sibblies ID#: Sandrene Haughton ID#:
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
PGS Introduction "Value Series" : Best VALUE gaming cases with the highest C/P Ratio (Cost to Performance ratio). "Professional Series – Red label" :
Step-by-step assembly instructions
Single-Balanced Mixer Assembly Instructions Revision 2 Updated 5/7/2012.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
How to change the nozzle inserts?
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
Kwikset Rekey Ultramax Rekeying the Ultramax by Kwikset this presentation is designed for beginners.
Welcome to the Fiber to the Home (FTTH) Informational Meeting 1.
Start here >> Network IQ Training Manual Chapter 4 - Fibre Optic Hardware.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
We Design Innovative Bus Interiors LED Retrofit Systems Designed ForPretoria Hadley/Transmatic L-20 and Hadley/Transmatic L-20 Fluorescent Aisle Lighting.
Fiber Distribution Point for Underground VSOF-CS403A-SD Connector type Fiber Distribution Point.
Qualified Partner Program R&M FO patch panels for LAN applications Felice Guarna, Training Program Manager Wetzikon, January 2006.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Problems and solutions in optical network plants in Hungary Torino, March 1998 Technological problems and solutions in optical network plants in.
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
National Centre for Biotechnology Education Gel electrophoresis Protein power! Copyright © Dean Madden, 2010.
FIBER OPTIC CABLE CONSTRUCTION
1 Nexans Cabling Solutions Fibre solutions for fast deployment Joost Grillaert.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
1 Installation guidelines for Marlon CS rooflights into fibre cement roof.
Fiber Optics MECHANICAL SPLICES.
FTTP Last Update Copyright Kenneth M. Chipps Ph.D. 1.
Introduction (2) Weaving machines: Shuttleless looms
Rain Barrel Workshop February 11, 2012 By Melissa Merritt.
Fiber Optic splicing process Technology Partners.
Making a Home Made Estes Rocket By Roberto & Stefano Barbier.
Quilt Optical Fiber Workshop Boulder Research and Administrative Network (BRAN) Experiences/Lessons Learned By Jim Van Dyke.
Sample Box Display ~ Items Needed QuantityDescriptionSize Lowe’s Item Number 2White Wood Board 1 x 3 x 8# BoxWood Screws8 x 11/2” Item #
A for Military Ships August What is A? A is a system of: –tube assemblies –tube connectors –tube management closures –fibre bundles –fibre management.
WeldFit Push-in Fittings
Introduction to Data Collection. First Page of your Composition Journal Title IV: DV: Null Hypothesis: Alternative Hypotheses: ◦ AH1 ◦ AH2 ◦ AH3 (optional.
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19th – 20th April 2012.
A quick and effective preconnectorised system
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Ziplock Container and 2L Bottle System. Bill of Materials –3 screw top Ziplock Containers –3 empty 2L soda bottles –Aquarium tubing –Aquarium pump –4.
1 Welcome John Mellis BT Laboratories Blown Fibre as a Reduced Cost Network Planning Solution.
WIRE REPAIR. TROUBLESHOOTING STEPS l Confirm the Complaint l Study the electrical schematic l Locate and repair the fault l Test the repair.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 13 PowerPoint presentation Stripping and.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Types of Cables.
JWPS Connector Wire-to-wire and Wire-to-board
Step-by-step assembly instructions
Step-by-step assembly instructions
JFPS Connector Purpose: Objectives: Content:
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
TRENTON Casing Filler Presentation
Required tools for installation of a V-1020C speaker with V-9914 bridge.
ELECTRICAL INSTALLATION
Replacing TrueAir Thermostat with Ecobee SI
Custom Switch and Value Added Capabilities
Presentation transcript:

Depending on number of homes and to maximize construction efficiencies, either a 8 way or 12 way tube bundle is deployed in the cut. At each drop, 1 tube is pulled from the bundle and terminated in the flower pot located at each home/drop. When the tubes are vacant, end caps MUST be used to prevent ingress of materials/water. Tube connectors are used to connect to a single tube within the bundle and extend across the road to drops/homes located on the opposite side of the cut.

Road crossings can be completed in a number of different methods: Saw cutting Missile boring Directional drill Once the bore is made, a conduit can be placed within the bore hole and used as the conduit in which the single tube will cross the streets. The tube will then terminate at the flower pot. The fibre will then be blown directly from the POP to the flower pot and spliced to the Tyco – Gator.

Each drop will have an assigned color that will be labeled in the FOSC located at the POP. For example: –Tube bundle 1 – Blue – th Avenue –Tube bundle 2 – Blue – th Avenue The fibre will be spliced to the Gator assembly and placed at the bottom of the flower pot. Splicing of the 2 strand fibre into this closure requires approx. 5 minutes each

Tyco Electronics provides a Gator 12F Splice Closure that uses a gel sealing technology to create a sealed closure system capable of fitting into small areas such as small flower pot style handholes. This system includes a pre- connectorized pig tail to which the 2 strand SM fibre is spliced.

At the POP, the individual tubes of each bundle are inserted into a standard Telecom FOSC and spliced to the backbone or carrier network. Each tube color from each tube bundle is assigned to each of the individual drops/ homes. Standard sized handholes or manholes can be used to house the FOSC

Tubes of each tube bundle are inserted into the FOSC. Once inserted, fibre is then blown into the tubes and terminated at each end. As an added protection for the fibre, a 5mm – 3.0mm reducer can be used and a small section of 3/2.1mm primary tube connected and wrapped within the splice trays. Use of grip connectors on the fibre is also an option as this prevents any movement of the fibre once installed