Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Survey(s) of TT8 10/12 TT 8 after wall1 16/12 TT 8 Standalone.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Walls crates cables gas chambers electronics CERN adb.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
MUON piquet report 18/9 -24/ Nikolai Bondar.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Making a great Project 2 OCR 1994/2360. Analysis This is the key to getting it right. Too many candidates skip through this section. It’s worth 20% of.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Status of the Muon Alignment System Muon Alignment Group Muon IB December 11th, 2012.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Solve by using the ELIMINATION method The goal is to eliminate one of the variables by performing multiplication on the equations. Multiplication is not.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Alice overview New detector and chamber ALICE TC.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
1 Photogrammetry of TT7. 2 Front view Distribution of all targets All the plots are in the magnet reference system.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Pandora calorimetry and leakage correction Peter Speckmayer 2010/09/011Peter Speckmayer, WG2 meeting.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
on behalf of ATLAS LAr Endcap Group
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Update on the PSB Transfer Lines
Installation plans from mid 2005
Transfer Line and CSC Rφ Reconstruction
An Introduction to VEX IQ Programming with Modkit
University of Wisconsin-Madison
University of Wisconsin-Madison
CNGS horn / reflector in 2005: The story of the glass ring insulator
CSC Electronics Installation and Commissioning CSCE I&C
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian Research Fund (OTKA) NK for the Hardware Muon Alignment Group

Outline Short glimpse on the upgrade plans: Reinforcement of measurements in Sector 13 & 14 Additional PG targets/redesign PG targets on MABs Programming extension to BoardPCs instead Bringing out BoardPCs from the gaps Proposal for the YETS intervention*: Partial upgrade of the external reference measurement Intervention plans wrt. Wheels opening options Barrel Alignment – Intervention and Upgrade proposal * Don’t forget the Link Alignment as well!

Quick overview of the Upgrade Plan Barrel Alignment – Intervention and Upgrade proposal

Upgrade plans – Reinforcement of measurements in Sector 13 & 14 The reconstruction error for rotZ of MB4 twin chambers are higher than the other MB4 chambers. Reason: those chambers can seen only from one side Solution: install “Mini MAB” to those chambers. Very similar to the MAB, but it houses only 2 camera. The proposed positions are seen on the drawing below. Due to several reasons (blocking electronic and cooling cables) it is impossible to put Mini MAB to every twin chamber. Results of simulation calculation of errors are on the tables. The position calculations shows the worst case, where the chamber can be seen though two other chamber. With the Mini MABs the alignment precision for these chambers will be better. Sector 13 Sector 14 Sector 4 Sector 10 X rot_Z error: Sect 13 Sect 4 Wheel w/out MM with MMs w/out MM with MMs mrad Position error for YB0_sect13: w/out MMwith MMs micrometer phi R Z rot_Z error: Sect 14 Sect 10 Wheel w/out MM with MMs w/out MM with MMs mrad Position error for YB0_sect14: w/out MMwith MMs micrometer phi R Z Results of simulation Cameras identical to those used for chimney-chamber regions d Carbon-fiber plate (5mm thickness) Mini MAB YB+2YB+1YB0YB-1YB-2 S4 Proposed MiniMAB arrangement: MAB MiniMAB S13 S10 S14 Barrel Alignment – Intervention and Upgrade proposal

Upgrade plans - Additional photogrammetry targets/redesign photogrammetry targets on MABs Motivation: –There was a discrepancy between the track-based and the hardware alignments both in Z (2mm, scaling?) and phi-like torsion (3mm) –So far we have only indirect ways to test where it comes from –Torsion has gone, but was not solved by muon hardware alignment! We need a direct external measurement possibility. What to do? –Install additional photogrammetry target to MABs –These targets are viewable for photogrammetry measurements, when the detector is already closed. –Only those targets are measurable, which are marked with solid line. There is a slight chance to measure those target which are marked with dashed line. Impossible to make photogrammetry measurements in those places which are not marked. How? –Survey group could measure Z coordinates of them (or at least Z distance) –Precision is around 70 microns (discrepancy, we had ~ 2mm!) –Maybe they can measure phi position as well ? answer for torsion… –If Z-scaling found, its value can be used as a correction later. Barrel Alignment – Intervention and Upgrade proposal

Map of Survey points in UXC September TS -- Visual inspection has been done on the possibility on the MAB visibility and mounting of new Survey brackets on the UXC wall Barrel Alignment – Intervention and Upgrade proposal

UXC Near side PositiveNegative X1 X0 X2 X3 X4 X5 +1/11-1/11-3/11 +3/1-1/1-3/1 +3/11 YB-2YB-1YB0YB+1YB+2 Green – measurable Orange – difficult to measure, but not impossible Barrel Alignment – Intervention and Upgrade proposal

UXC Near side NegativePositive X1 X0 X2 X3 X4 -3/7 +3/5 +2/6 -3/5 -2/8+2/8-1/9+1/9-3/9 +3/7 YB+2YB+1YB0YB-1YB-2 Green – measurable Orange – difficult to measure, but not impossible Barrel Alignment – Intervention and Upgrade proposal

YB0 - -1/1 -1/3 -1/5 -1/7 -1/9 -1/11 Viewable MABs are for Survey measurements YB+2 +3/1 +3/3 +3/5 +3/7 +3/9 +3/11 YB-2 -3/1 -3/3 -3/5 -3/7 -3/9 -3/11 YB0 + +1/1 +1/3 +1/5 +1/7 +1/9 +1/1 1 YB+1 +2/2 +2/4 +2/6 +2/8 +2/ YB-1 -2/2 -2/4 -2/6 -2/8 -2/ Green – measurable Orange – difficult to measure, but not impossible Total Barrel length measurement at Sectors 1,5,11 Partial Barrel length measurement at Sectors 8,11 Barrel Alignment – Intervention and Upgrade proposal

Summary of "Investigation of Survey needs for the Barrel Alignment Upgrade" work package Good positions: YB+1 X1 near, to measure +1/11 MAB -- OK YB-1 X1 near, to measure -1/11 MAB only bottom -- OK YB-2 X1 near, to measure -3/11 MAB -- One fix point need to install on the wall YB+2 X3 near, to measure +3/1 MAB -- One fix point need to install on the wall (holes are already on the wall) YB-1, YB0 X3 near, to measure -1/1 MAB -- OK YB-2 X3 near, to measure -3/1 MAB -- One fix point need to install on the wall YB-2 X4 near, to measure -3/1 MAB -- X4N25 rack is blocking, but it is still empty. One fix point need to install on the wall. YB+2 X4 far, to measure +3/5 MAB -- One fix point need to install on the wall YB+1 X4 far, to measure +2/6 MAB -- One fix point need to install on the wall YB+1 X3 far, to measure +2/6 MAB -- One fix point need to install on the wall YB-2 X4 far, to measure -3/5 MAB -- One fix point need to install on the wall YB-1 X1 far, to measure -2/8 MAB -- One fix point need to install on inclined wall below the fire extinguisher YB0 X1 far, to measure -1/9 MAB -- One fix point need to install on inclined wall YB+1 X1 far, to measure +2/8 MAB -- OK YB-2 X1 far, to measure -3/9 MAB -- One fix point need to install on inclined wall Not very good positions: YB+2 X1 near, to measure +3/11 MAB -- 2 fix point needed or 1 fix point on the wall (cables are on the wall) YB-2 X3 far, to measure -3/7 MAB -- difficult to measure (due to cooling pipe near to the wall) and one fix point need to install YB+2 X3 far, to measure +3/7 MAB -- difficult to measure (due to cooling pipe near to the wall), but it is possible to install a small bracket to inclined wall at X2 far Barrel Alignment – Intervention and Upgrade proposal

Status of the Upgrade Upgrade plans: Reinforcement of measurements in Sector 13 & 14  design has been started Additional PG targets/redesign PG targets on MABs  prototypes production started  survey of the external viewing possibilities done  next: starting to mount external Survey brackets for external Wheels Programming extension to BoardPCs instead Bringing out BoardPCs from the gaps  Nov TS: survey of possible places  tomorrow: long cable check in ISR (promising!) Barrel Alignment – Intervention and Upgrade proposal

Proposal for the YETS intervention Barrel Alignment – Intervention and Upgrade proposal

Pending issues wrt. opening scenarios:  Repair of the bad fixation of MAB +3/5. This might take 2 hours and would require a scissor lift.  We would like to add extra photogrammetric targets to the following MABs: +3/1, +3/5, +3/7, +3/11, -3/1, -3/5, -3/7, -3/11. This is the feasilbility test of the upgrade.  Installation of extra Survey posts on UXC walls (close to final design in November)  Problems with the FrameLocker card of MAB -3/7. It should be replaced and be sent for diagnosis/repair. Depending on diagnosis, it might happen that the others are to be touched as well.  If MABs are to be (re)moved, survey after replacement and Link adjustment are necessary.  If chambers are to be moved as well, survey on chambers is also needed. Opening EndCaps only Barrel Alignment – Intervention and Upgrade proposal

Pending issues wrt. opening scenarios:  Problems with the FrameLocker card of MAB -2/10. It should be replaced and be sent for diagnosis/repair.  If MABs are to be (re)moved, survey after replacement is necessary.  If chambers are to be moved as well, survey on chambers is also needed. Opening EndCaps + YB±2 Barrel Alignment – Intervention and Upgrade proposal

Pending issues wrt. opening scenarios:  Reload F/W of all MABs on YB0+ (would solve problems of MAB +1/9, too since May 2010)  Problems with the FrameLocker card of MAB +1/7. It should be replaced and be sent for diagnosis/repair.  If MABs are to be (re)moved, survey after replacement is necessary.  If chambers are to be moved as well, survey on chambers is also needed. Opening EndCaps + all wheels Barrel Alignment – Intervention and Upgrade proposal