Doc.: IEEE 802.11-11/1510r0 Submission November 2011 Marc Emmelmann, FOKUSSlide 1 Enablement in 5GHz for FILS Date: 2011-11-07 Authors:

Slides:



Advertisements
Similar presentations
PAWS: Use Cases I-D: draft-ietf-paws-problem-stmt-usecases-rqmts Basavaraj Patil, Scott Probasco (Nokia) Juan Carlos Zuniga (Interdigital) IETF 82.
Advertisements

Doc.: IEEE /1125r0 Submission September 2010 Marc Emmelmann, Fraunhofer FOKUSSlide 1 How does the (new) Fast Initial Link Set- Up PAR address.
Doc.: IEEE /0544r0 May 2010 Padam Kafle, Nokia Submission Slide 1 Some Comments on White Space Map IE Authors: Date: May 14, 2010 NameCompanyAddressPhone .
Doc.: IEEE /1521r2 Submission January 2012 Marc Emmelmann, FOKUSSlide 1 AP and Network Discovery Enhancements Date: Authors:
Doc.: IEEE /0898r2 Submission July 2012 Marc Emmelmann, FOKUSSlide 1 Fast Initial Service Discovery: An enabler for Self-Growing Date:
Doc.: IEEE af Submission Mar Chin-Sean Sum, NICTSlide 1 Summary of NICT’s Technical Proposals for TGaf Date: Authors:
Doc.: IEEE /1421r1 Submission November 2012 Rich Kennedy, Research In MotionSlide 1 TGaf Response to CA Comments Date: Authors:
Doc.: IEEE /1421r0 Submission November 2012 Rich Kennedy, Research In MotionSlide 1 TGaf Response to CA Comments Date: Authors:
Submission doc.: IEEE 11-14/0269r0 March 2014 Katsuo Yunoki, KDDI R&D LaboratoriesSlide 1 Scanning Optimization By Using Reduced Neighbor Report IE Date:
Submission doc.: IEEE 11-12/772r0 July 2012 Jarkko Kneckt, NokiaSlide 1 Non-HT Duplicate PPDU FILS Advertisement Frame Date: Authors:
Doc.: IEEE /0357r0 Submission March 2011 Marc Emmelmann, Fraunhofer FOKUSSlide 1 A focused path torwards TGai D1.0 Date: Authors:
Doc.: IEEE /1232r3 Submission Sep 2011 Slide 1 Active Scanning Improvement Date: Authors:
Submission doc.: IEEE /0010r0 January 2015 Sho Furuichi, SonySlide 1 Coexistence Scenario and Use Cases Date: Authors: Notice: This.
Doc.: IEEE /1539r0 Submission Dec Minho Cheong, ETRISlide 1 Beam forming for 11ah Date: Authors:
Doc.: IEEE /0922r1 Submission July 2010 Marc Emmelmann, FOKUSSlide 1 Achievable gains in AP Discovery Date: Authors:
Submission doc.: IEEE ai May 2012 InterDigital, KDDI, Nokia, Huawei, Intel, Qcomm Slide 1 Proposed SFD Text for ai Passive Scanning.
Doc.: IEEE /1303r5 Submission November 2010 Jarkko Kneckt (Nokia)Slide 1 Overlapping BSS Co-Existence Date: Authors:
Doc.: IEEE /492r02 Submission Orange Labs Date: Collaboration between 2.4/5 and 60 GHz May 2010 Authors:
Doc.: IEEE /1042 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang, Kyungki,
Doc.: IEEE /1291r1 Report September 2014 Rich Kennedy, MediaTekSlide 1 IEEE /15 Regulatory SC Athens Closing Report Date: Authors:
Doc.: IEEE ad Submission May 2010 Chin-Sean Sum, NICTSlide 1 Mechanism for Inter-system Coexistence Date: Authors:
Doc.: IEEE /1054r0 Submission Sep Santosh Pandey (Cisco)Slide 1 FILS Reduced Neighbor Report Date: Authors:
Doc.: IEEE /0262r1 Submission March 2010 Ha-Nguyen Tran et al., NICTSlide 1 Requirements and Amendment Regarding TVWS Database Access Notice:
Doc.: IEEE /0256r0 Submission March 2010 Zhou Lan NICTSlide 1 Proposal of Synchronized Quiet Period for Incumbent User Detection Date: 2010-March.
Doc.: IEEE /0863r0 Submission July 2012 David Halasz, Motorola MobilitySlide 1 Propagation delay and extended range IEEE Date:
Submission doc.: IEEE /0091r0 November 2015 Chen Sun, Sony ChinaSlide 1 Explanation of IEEE Date: Authors:
Doc.: IEEE /1233r3 Submission Sep 2011 Slide 1 Passive Scanning Improvement Date: Authors:
SubmissionSlide 1Dwight Smith, Motorola Mobility Nov 2012doc.: IEEE 11-12/1332r0 Other Service Discovery Concepts Date: Authors:
Doc.: IEEE /0175r2 Submission June 2011 Slide 1 FCC TVWS Terminology Date: Authors: Peter Ecclesine, Cisco.
Submission doc.: IEEE 11-12/535r1 May 2012 Jarkko Kneckt, NokiaSlide 1 Scanning and FILS requirements Date: Authors:
Doc.: IEEE /1042r1 Submission NameAffiliationsAddressPhone Giwon ParkLG Electronics LG R&D Complex 533, Hogye- 1dong, Dongan-Gu, Anyang,
Doc.: IEEE /0192r0 Submission September 2006 Edgar Reihl, Shure IncorporatedSlide 1 Shure Comments to TG1 IEEE P Wireless RANs Date:
Doc.: IEEE /1393r1 Submission November 2011 Slide 1 OFCOM ECC TR 159 TVWS Terminology Date: Authors: Peter Ecclesine, Cisco.
Doc.: IEEE /0261r0 SubmissionSlide 1 Enabling Procedure of Communication in TVWS under FCC rules Notice: This document has been prepared to assist.
Submission doc.: IEEE 11-11/0761r0 July 2012 Katsuo Yunoki, KDDI R&D LaboratoriesSlide 1 Operating Channels Information Date: Authors:
Submission November 2010 doc.: IEEE /1236r0 Enhancements to Enablement Procedure Slide 1 Santosh Abraham, Qualcomm Incorporated Date:
Doc.: IEEE /xxxxr0 July 2011 Padam Kafle, Nokia Submission Simplification of Enablement Procedure for TVWS Authors: Date: July 18, 2011 NameCompanyAddressPhone .
Submission doc.: IEEE af-11/1051r0 Dual band operation of TVBDs Date: July 20, 2011 Chen Sun, NICT Author(s): NameCompanyAddressPhone Chen SUNNICT+81.
Doc.: IEEE /0841r0 Submission May 2011 Marc Emmelmann, Fraunhofer FOKUSSlide 1 Verification of TGai Requirements Date: Authors:
Doc.: IEEE /1015r1 Submission Gabor Bajko, Nokia, Canpolat, Intel, Emmelmann, FOKUSSlide 1 Network Selection Optimization Date:
Doc.: IEEE /1232r1 Submission Sep 2011 Marc Emmelmann, FOKUSSlide 1 Active Scanning Improvement Date: Authors:
Submission May 2013 BUPT Slide 1 Potential Solutions to D2D Assisted WLAN Date: May 16, 2013 Authors:
SubmissionJoe Kwak, InterDigital1 PHY measurements for interference reduction from 11h Joe Kwak, Marian Rudolf InterDigital doc: IEEE /537r0July.
Doc.: IEEE /492r00 Submission Orange Labs Date: Collaboration between 2.4/5 and 60 GHz May 2010 Slide 1 Authors:
Amendment Proposal for TV White Spaces Operation
Amendment Proposal for TV White Spaces Operation
FILS Reduced Neighbor Report
TBTT Information Field Type (TIFT) Clarification for P802.11REVmd
Wide Scanning Requests and Responses
Amendment Proposal for TV White Spaces Operation
40 MHz Coexistence in 2.4 GHz Tutorial
Enabling signal and enablement
Group-addressed GAS Date: Authors: December 2016 July 2013
FILS Reduced Neighbor Report
FCC Regulations and Multi-band Operation
Group-addressed GAS Date: Authors: December 2016 July 2013
Fair Quiet for DFS Date: Authors: February 2008
Functional Requirements for EHT Specification Framework
Enabling signal and enablement
Identification Signal for Fixed devices
Fast Session Transfer Session Setup in TVWS
IEEE Comments on aq PAR and 5C
April 2009 doc.: IEEE /xxxxr0 July 2010
CR for CID 1115 Date: Authors: May 2019
Synchronization of Quiet Periods for Incumbent User Detection
Fast Session Transfer Session Setup in TVWS
Amendment Proposal for TV White Spaces Operation
TGah Coexistence Assurance
Functional Requirements for EHT Specification Framework
Fast passive scan for FILS
Presentation transcript:

doc.: IEEE /1510r0 Submission November 2011 Marc Emmelmann, FOKUSSlide 1 Enablement in 5GHz for FILS Date: Authors:

doc.: IEEE /1510r0 Submission November 2011 Marc Emmelmann, FOKUSSlide 2 Abstract Ideas on Fast Initial Link Set-Up within the 5GHz band via enablement on a different channel. To be used to stimulate discussion in joint REG/ai session

doc.: IEEE /1510r0 Submission November 2011 Marc Emmelmann, FOKUSSlide 3 The Goal Understand the idea to expedite AP discovery in 5GHz Discuss the design space under the constrain to have a solution which does not interfere with “primary users” Do not limit the design scope by a country-specific regulation. Rather consider options enabling different approach in a “region-specific” manner Understand the limitations of regulation in certain countries as they exist today

doc.: IEEE /1510r0 Submission November 2011 Marc Emmelmann, FOKUSSlide 4 Idea 5GHz part operates “as known”  Master device w/ channel sensing 2.4GHz part asks 5GHz part which channel are in use (or is told)  „real time synchronization of that shared knowledge“ Non-AP STA conducts active scanning in 2.4GHz band  receives valid 5GHz channel list Option a) verify this information via passive scanning on specific 5GHz channel Option b) directly start link set-up on 5GHz channel Continue w/ regular 5GHz operation Single Device / Box 2.4 GHz AP 5 GHz AP Internal Mgmt. Not accessible by user Non-AP STA 2.4 & 5 GHz operation Active scan  receive 5GHz channel list Optional passive scan on channel for verification Link-Set Up Non-AP STA is under the control of the master (single device) Open issues: Enabling signal is not received in 5GHz channel Different propagation characteristics of different frequency bands  larger tranmission range of 2.4GHz as compared to 5GHz

doc.: IEEE /1510r0 Submission Enabling signal not received in 5GHz band Not a technical issue; constrains imposed by regulation –FCC : “… Master devices marketed within the United States must be limited to operation on permissible part 15 frequencies....“ –Europe: Not sure; could not find a similar statement. Just the “operation under the control of a master” is required. –Possible approach: specify standard for this feature to work only in specific regulatory domains (per given annex). Does not matter if we “verify” via passive scanning –as in this case, it is legally not an enabling-signal but a hint where to look for the beacon. –Enablement is legally done via beacon reception as today BUT: Could work with FCC constrains if enabling signal is received in any 5GHz channel November 2011 Marc Emmelmann, FOKUSSlide 5 Is my under- standing of correct?

doc.: IEEE /1510r0 Submission Different transmission ranges of 2.4 & 5GHz This is a severe technical issue. We might receive an enabling signal at a distance far away from the master device (AP) which is not covered by the sensing requirements for 5GHz operation If legislation says that a slave (non AP-STA) must not emit any radiation unless the controlling master device has verified that operation in a specific frequency is permissible (at the location of the slave), we will have to verify via passive scanning. Are there other concepts, e.g. database-based information, that can be used (also for operation in other bands i.e. TVWS) ? November 2011 Marc Emmelmann, FOKUSSlide 6 My understanding is that Europe and US are to restrictive

doc.: IEEE /1510r0 Submission Summary Statements to be verified based on discussion w/ REG “enablement” outside the frequency band of concern (here 5GHz) requires –Verification via passive scanning for 5GHz operation (sensing based detection of primary) due to Different propagation range of signal Regulatory requirements –May work for database-based approaches  Talk to 11af „Enablement“ inside the 5GHz frequency band seems to be possible; not verification via passive scanning required. November 2011 Marc Emmelmann, FOKUSSlide 7

doc.: IEEE /1510r0 Submission November 2011 Marc Emmelmann, FOKUSSlide 8 References FR015.pdfhttp:// FR015.pdf FCC TCB slides discussing FCC KDB – nfigurationControl-RDJS.pdf nfigurationControl-RDJS.pdf –FCC KDBs and are about permissible changes and client devicesFCC KDBs and are about permissible changes and client devices –is a list of KDBs regarding testing proceduresis a list of KDBs regarding testing procedures 3RF-Exposure-Procedures-Update KC.pdfhttp://transition.fcc.gov/oet/ea/presentations/files/oct11/ 3RF-Exposure-Procedures-Update KC.pdf –is a presentation on RF Exposure Procedures is a presentation on RF Exposure Procedures