The Core Questions, Working Group member roles, responsibilities and contributions for the Scientific Synthesis Group Laurence Mee Director: Scottish Association.

Slides:



Advertisements
Similar presentations
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Advertisements

TIA Study Group, Hosei U., Tokyo Use of Information Management and Public Participation by GEF IW Projects Dann Sklarew, Ph.D. Director/Chief.
Module 4 Planning SP. What’s in Module 4  Opportunities for SP  Different SP models  Communication plan  Monitoring and evaluating  Working session.
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
Workshops for implementing the Strategic Plan for Biodiversity through the National Biodiversity Strategies and Action Plans Module 2 The Biodiversity.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Basic Considerations  outlines the process by which the Government of Kenya will develop its national strategy for participating in an evolving international.
International Waters Operational Strategy Program Study & OPS 3 confirm validity Simple strategy: Build capacity to work together, set priorities, agree.
ACTeon Innovation, policy, environment Madrid – WFD Conference April 2006 How to proceed with the Programme of Measures and the River Basin Management.
Recent developments in the UNFCCC process in relation to global observations 4 th GTOS Steering Committee Paris, 1-2 December 2009 Rocio Lichte Programme.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
SEEA Experimental Ecosystem Accounts: A Proposed Outline and Road Map Sixth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
EVALUATION IN THE GEF Juha Uitto Director
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
Environmental Impact Assessment (EIA): Overview
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
Cross-cutting areas of Capacity Building and Adaptation UNDP Workshop for NIS Environmental Focal Points June 2004.
Evaluation in the GEF and Training Module on Terminal Evaluations
Preliminary theory of change for the South China Sea Project Cluster Neeraj Negi Reference Group Meeting Bangkok, Thailand September 27, 2010.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
GEF IW Projects Indicators Framework Conference on Nutrient Pollution Control Danube - Black Sea Basin Chisinau – October 2006 Andrea Merla – GEF Secretariat.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
1 UNFCCC national communications process/ linkages with AIACC AIACC Africa and Indian Ocean Islands Regional Workshop 24 May 2003 Dakar, Senegal Festus.
Approach to GEF IW SCS Impact Evaluation Aaron Zazueta Reference Group Meeting Bangkok, Thailand September 27, 2010.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Introduction of the Study of the GEF Contributions to the South China Sea Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
1 NOAA Priorities for an Ecosystem Approach to Management A Presentation to the NOAA Science Advisory Board John H. Dunnigan NOAA Ecosystem Goal Team Lead.
European capacity building initiativeecbi Adaptation in the Paris Agreement Ambition and Permanence for the Cancun Adaptation Framework Juan P Hoffmaister.
IW SCS Impact Evaluation Phases and Products Aaron Zazueta Reference Group Meeting Bangkok, Thailand September 27, 2010.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
The AIACC Project Assessments of Impacts and Adaptations to Climate Change Neil Leary, AIACC Science Director AIACC Regional Workshop for Latin America.
Livia Bizikova and Laszlo Pinter
St. John’s, Antigua May What is STAP? In 1994, the GEF Instrument sets up STAP – “UNEP shall establish, in consultation with UNDP and the World.
TRANSBOUNDARY DIAGNOSTIC ANALYSIS 1.DIAGNOSIS - ASSESSMENT IDENTIFICATION OF WATER-RELATED ENVIRONMENTAL ISSUES & PROBLEMS QUANTIFICATION OF IDENTIFIED.
Theme 2 Developing MPA networks Particular thanks to: Theme 2 Concurrent Session Rapporteurs, Dan Laffoley, Gilly Llewellyn G E E L O N G A U S T R A L.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
DEVELOPING THE WORK PLAN
IWRM in GEF-Supported International Waters and their Transboundary Basins Dann M. Sklarew, Ph.D Director/Chief Technical.
Waisea Vosa Climate Change Unit Division of Political and Treaties Ministry of Foreign Affairs and International Cooperation.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
FAO Fisheries and Aquaculture Department The Canary Current LME project (CCLME) Implementation of the full phase started 1 April 2010 FAO and UNEP act.
1 Role of Stakeholder Engagement in Integrated Water Management (A GEF International Waters Perspective) by Dann Sklarew, GEF IW:LEARN Asia Regional Workshop.
The TDA/SAP approach in the GEF International Waters Programme: An Overview Laurence Mee, Andrew Hudson and Martin Bloxham.
Development of Community-based Adaptation Project Experiences of the GEF Small grants programme By Stephen Gitonga Climate change Programme officer GEF.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Module 8 Guidelines for evaluating the SDGs through an equity focused and gender responsive lens: Overview Technical Assistance on Evaluating SDGs: Leave.
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
Preliminary theory of change for the South China Sea Project Cluster
LME Breakout Sessions 1. Share Experiences and Plan Future Learning
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
IW:LEARN TDA/SAP Training Course
Overview of working draft v. 29 January 2018
Evaluation in the GEF and Training Module on Terminal Evaluations
Integrated River Basin Management
Strategic Environmental Assessment (SEA)
Information on projects
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
United Nations Statistics Division
Determining Incremental Costs in GEF Projects
The Technology Mechanism of the UNFCCC
Presentation transcript:

The Core Questions, Working Group member roles, responsibilities and contributions for the Scientific Synthesis Group Laurence Mee Director: Scottish Association for Marine Science

I. Expectations Science inputs and the TDA/SAP process

Why do we need international waters assessments? Interventions have frequently failed to fully identify the impacts (environmental, socioeconomic) and temporal and geographical boundaries of the problem and its causes (scaling & scoping). The boundaries of the area where the problem itself is observed may not encompass the location of the cause.

THE TRANSBOUNDARY DIAGNOSTIC ANALYSIS (TDA)  Is recommended for most IW projects  Is a scientific and technical fact-finding analysis  It should be an objective assessment and not a negotiated document  It acts as a diagnostic tool for measuring the effectiveness of SAP implementation

STRATEGIC ACTION PROGRAMME (SAP)  A SAP is a negotiated policy document  It establishes clear priorities for action to resolve the priority transboundary waters problems  It identifies policy, legal and institutional reforms and investments needed to address the priority transboundary waters problems  The preparation of a SAP is a cooperative process among key stakeholders in the countries of the region.

WHAT ARE THE DIFFERENCES & COMPLEMENTARITIES BETWEEN THE TDA AND THE SAP?  THE TDA IDENTIFIES: THE PRIORITY PROBLEMS ENV & SE IMPACTS UNDERLYING SECTORAL AND ROOT CAUSES ANALYSIS OF GOVERNANCE  BASED ON A REASONED AND MULTI-SECTORAL CONSIDERATION OF THE PROBLEMS  THE FACTUAL BASIS FOR THE FORMULATION OF A SAP  OUTLINES THE POLICY, LEGAL, AND INSTITUTIONAL REFORMS AND INVESTMENTS NEEDED TO RESOLVE THE PRIORITY TB PROBLEMS  MUST BE AGREED BEFORE TECHNICAL ASSISTANCE, CAPACITY- BUILDING, OR INVESTMENT PROJECTS CAN BE DEVELOPED  THE SAP SETS OUT SPECIFIC ACTIONS FOR EACH COUNTRY THAT CAN BE ADOPTED NATIONALLY BUT HARMONISED WITH THE OTHER CONCERNED COUNTRIES THE TDATHE SAP

THREE SOURCES OF GEF FUNDING May cover:  Prep of project concept paper & pdf- b proposal  Consultation with governments  Initial stakeholder identification  An assessment of feasibility of the proposed activity May cover:  Information gathering, consultation and supporting documentation to prepare full project proposals  Stakeholder involvement and M&E Plans  Establishment and initiation of TDA/SAP mechanisms  Awarded in accordance with GEF Guidelines (OS, OP, SPs) and the relevant Convention Requisite:  Submission & approval of a full project concept paper;  A project brief for presentation of the project proposal to GEF Council PDF – A Funding PDF – B Funding Full Project Funding

PDF-A fundingPDF-B fundingFull Project funding Early stage programme support Project identification Initial stakeholder consultations TDA/SAP development Full Project proposal development Implementation of SAP SCENARIOS OF THE GEF FUNDING PROCESS Projects with a smaller number of participating countries

PDF-A fundingPDF-B fundingFull Project funding (I) Full Project funding (II) Early stage programme support Project identification Initial stakeholder consultations Initial TDA development Preliminary SAP Full Project proposal development TDA completion SAP development Demonstration projects Implementation of SAP SCENARIOS OF THE GEF FUNDING PROCESS Projects with a larger number of participating countries

Full stakeholder participation Underlying principles incorporated into the TDA/SAP process Joint fact-finding (inc. social and economic root causes) Transparency The ecosystem approach Adaptive management

The Ecosystem Approach A resource planning and management approach that recognizes the connections between land, air, water and all living things, including people, their activities and institutions. Definition from the Ministry of Natural Resources, Canada

Key components of the ecosystem approach Management objectives as societal choice Management decentralised and multi-sectoral Appropriate temporal and spatial scale Conservation of ecosystem function and resilience Appropriate balance between conservation and use Management within system limits The outward vision (respect interconnectedness) and long-term vision (change is inevitable) Broad use of knowledge, scientific and traditional Incorporation of economic considerations (costs and benefits, removal of externalities, etc.) Source: CBD Malawi guidelines

Policy RESPONSE options Environ- mental STATE changes Human WELFARE change Socio- economic DRIVERS Environ- mental PRESSURES Social system Ecological system A framework for understanding - DPSWR

Policy RESPONSE options Environ- mental STATE changes Human WELFARE change Socio- economic DRIVERS Environ- mental PRESSURES Social system Ecological system DPSWR - Where are the impacts? IMPACTS

Policy RESPONSE options Environ- mental STATE changes Human WELFARE change Socio- economic DRIVERS Environ- mental PRESSURES Human climate change Natural system variability External factors DPSWR - External factors

Communication to stakeholders must be understandable

Connecting, values, visions and planning Work with the community to identify key stakeholders Stakeholders select representatives Joint fact-finding (supported by science) Community agreement on a vision for the future Brainstorming the first steps for getting there

Adaptive management Positive thinking for an uncertain future

ASSESSMENT

SETTING THE VISION

DEFINING THE FIRST STEP

NECESSARY INDICATORS

MONITORING IS ESSENTIAL

COMPLIANCE AND FEEDBACK

PROGRESS TOWARDS THE VISION

International Waters Task Force Key Indicators Process indicators 2. Stress reduction indicators 3. Environmental status indicators.

Systems thinking: A method of rational inquiry Understanding of how human activities can impact marine environment Models for systems analysis Conceptual models describing pathways of socio-economic drivers and pressures Sensitivity of system to proposed policy options and socio-economic changes Information about relevant attributes of the system Metadata Requirements Data and narrative Validation Leads to improvements in Scenarios Helps devise

PART 2 OVERVIEW OF THE 5 PHASES OF THE TDA/SAP PROCESS

Full stakeholder participation Underlying principles incorporated into the TDA/SAP process Joint fact-finding (inc. social and economic root causes) Transparency The ecosystem approach Adaptive management Accountability Inter-sectoral policy building Stepwise consensus building Subsidiarity Incremental costs Donor partnerships Government commitment

1. Project development Preliminary project request Identification and consultation with the stakeholder groups 3. Development of the TDA Identification and initial prioritisation of transboundary problems Analysis of impacts/ consequences transboundary problems Production and submission of complete draft TDA TDA Preparation Causal chain analysis and governance analysis Final prioritisation of transboundary problems 4. Formulating the SAP Bridging the TDA and SAP and developing long-term EcoQOs Brainstorming ways to attain the EcoQOs Examination of and political consultation on alternative options Development of targets and indicators Drafting the NAPs and SAP Planning the remaining steps of the SAP and appointing SAP and NAP formulation teams 2. Planning the TDA/SAP Design work plan for the TDA/SAP implementation phase including budgets Detailed stakeholder analysis and draft public involvement plan Identification of the technical task team (TTT) Preparation of a draft concept paper Project approval by the GEF CEO Appointment of Project Manager Appointment of Facilitator Form Interministry Committees Form Steering committee Set up the TDA Technical Task Team (TTT) 5. SAP implementation Adoption of the SAP: The Ministerial Conference Preparation of Full Project brief Conducting a Donors Conference Development of relevant interventions by GEF and/or other donors Agreement on the institutional framework TDA adopted by steering committee

4. FORMULATING THE SAP  The Strategic Action Programme is a process of reaching political consensus on the policy and legal reforms, investments and capacity building requirements needed to address the key issues identified in the TDA.  It requires the best possible technical advice and is based on the principle of collaborative problem solving

Underlying principle of negotiation: Collaborative problem solving Seeking compromise When there may be no win-win solution.

Dewey’s ‘rules of logic’ (1930) 1. Define the problem in terms of needs, not solutions 2. Brainstorm possible solutions 3. Select the solutions that will best meet both parties’ needs and check possible consequences 4. Plan who will do what, where and when 5. Implement the plan 6. Evaluate the problem-solving process and, at a later date, how well the solution turned out.

STEPS FOR DEVELOPING THE SAP  Develop a long term vision for the region  Brainstorm ways to attain the Eco/WR QOs  Assess the acceptability of the options, including: technical feasibility, as well as economic and political  Set short-term targets and priority actions  Develop M & E indicators  Draft the SAP

Building a national and regional consensus on the SAP

“Wicked” and “Tame” Problems “Tame” problem can be solved by careful rules-based or consensus management “Wicked” problem involves moral judgements and value- based decisions: governance. Clear solutions no clear solution; there will be winners and losers First order “fixes” Hard choices Jentoft and Chuenpagdee (2009) Fisheries and coastal governance as a wicked problem

Mee, Eberhard and Dublin, Global Environmental Change, 2008 A GEF intervention that goes well

Mee, Eberhard and Dublin, Global Environmental Change, 2008 … and not so well.

Temporal issues

III. Core Questions

Critical emerging science issues ( 5 Core Questions) 1.What are the critical science challenges “on the horizon” specific to each ecosystem type? 2.What is the significance of regional and global-scale drivers, in particular climate change, in the genesis of transboundary problems? 3.Describe how understanding and managing multiple causality in a transboundary water context is undertaken?

3.How are variable spatial and temporal scales in IW projects accounted for? 4.What approaches were used to understand/assess the coupling of social and ecological systems?

Development and use of indicators to support IW projects ( 3 Core Questions) 1.How did the projects help build and implement sound indicators and monitoring strategies to support SAP implementation and/or ultimately assess the achievement of environmental and social benefits? 2.How can we identify effective proxy indicators for use in IW projects? 3.How to make better use of appropriate science and best practices for Transboundary Diagnostic Analysis? Note that there may be a need for a comparative analysis of current GEF IW indicators and those used by the DPSWR framework.

Application of science for adaptive management - (5 Core Questions) 1.Was engagement of both local and wider science communities utilised in IW projects? If not, how can improvements be made? 2.Is scientific expertise and local knowledge well applied within the IW focal area, particularly in accessing existing baseline information, new findings on methodologies, science breakthroughs and scanning for emerging issues?

3.Identify lessons learned for linking science and policy implementation, including policy formulation and broader governance issues 4.Is adaptive management happening? How to better understand and effectively communicate the scientific dimensions of adaptive management to different user groups? 5.How to better communicate newly-synthesized science knowledge to stakeholders within and external to GEF?

Reflections and discussion