SksMinus status 05 HB meeting 2008/5/16 白鳥昂太郎. Contents  Helium target.

Slides:



Advertisements
Similar presentations
Introduction to Plasma-Surface Interactions Lecture 6 Divertors.
Advertisements

Waveguides M. Yoshida (Osaka Univ.) MICE meeting at LBNL 09.Feb.2005.
Al-Li 2000 series alloy out gassing Studies at IIT N. Solomey, Physics Division Philippe Nash, Material Science Division 21 Feb
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
J-PARC でのハイパー核ガンマ線分 光実験に向けた Hyperball-J の建設状 況 東北大理、 KEK 、 セイコー EG&G 、 富士電機システム ズ 白鳥昂太郎、 田村裕和、 小野浩、 笠見勝裕、 小池武志、 竹内孝行、 千賀信幸、 春山富義、 保川幸雄 and the Hyperball-J.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
SksMinus status SKS meeting 2008/1/18 白鳥昂太郎. SksMinus setup SksMinus  STOF : Time-of-flight  SAC & BAC: K - beam veto and  - ID (n=1.03)  SDC1~4 :
Solar System Review Game. 1.Which planet’s day is longer than its year? 2.Which planet has two moons? What are their names? 3.Which planet has six thin.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
The design of elliptical cavities Gabriele Costanza.
HD target.
Nuclear Thermal Hydraulic System Experiment
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
SksMinus status SKS meeting 2007/5/10 白鳥昂太郎. SksMinus setup SksMinus  STOF : Time-of-flight  SAC & BAC: K - beam veto and  - ID (n=1.03)  (SFV : K.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
KNUDSEN PUMP. WHAT IS IT? Vacuum pump Principal of thermal transpiration temperature gradient causing the gas molecules to move from one side of the tube.
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
Development of solid hydrogen target in RIKEN RIKEN T. Ohnishi, H. Takeda, T. Suda KEK S. Ishimoto, S. Suzuki RCNP Y. Takahashi ANL I. Tanihata  Introduction.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
HLab meeting 5/22/07 K. Shirotori. SP0 Beam decay background veto SP0 :  - from K - →  - +  0 Background  - is vetoed by detecting  rays from the.
R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
1.テキストの入れ替え テキストを自由に入れ替えることができます。 2.画像の入れ替え [書式]タブの[図の変更]から、会社ロゴ などに入れ替えることができます。
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Heat Pumps Presentation by: Rana Itani. Objective To familiarize audience on the components of a heat pump and how it works.
J-PARC における 4  He の生成と構造の研究 東北大学 大学院理学研究科 白鳥昂太郎 for the Hyperball-J Collaboration.
SksMinus simulation program. Program reconstruction Modification of SksMinus Geant4 program  Included configuration file Reaction selection Simulated.
HES-HKS & KaoS meeting. Contents Different distorted initial matrices Distorted matrix sample 6 (dist6) Distorted matrix sample 7 (dist7) Distorted matrix.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
B26 The AsyMatrix Condenser for Heat Pumps Powerful, just smaller.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL Meeting ORNL March.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
SksMinus status 01 HB meeting 2008/4/1 白鳥昂太郎. Contents  Target : 4 He target  Aerogel Cherenkov counters : SAC  Hyperball-J efficiency.
Solid Mechanics Course No. ME213. Thin Cylinders (Examples) ME213 Solid Mechanics2 Example 1.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Performance test of KAGRA cryostat at site
L. Gentini, A. Bertarelli, F. Carra
Solar System.
Stephan Aulenbacher MAGIX Collaboration Meeting
Ti/SS transitions A.Basti INFN-PISA*
new straw end plug: D=10.6 mm straws support frame Levan option
Description of Thin Liquid Wall Protection w/Porous Walls
RTML Vacuum System RDR Summary FermiLab October 24, 2007
Performance test of KAGRA cryostat at site
LARP Vertical Test Facility
SiD Solenoid Status and Plans
Compound VCRS.
Cryogenic cavern in Asian site
Liquid target system for New TPC experiment
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
CELL SIZE AND SHAPE PP
Shuttle Main Engine LOX System (typical of 3)
Discussion on the TDI impedance specifications
Cardiovascular System
Al-Li 2000 series alloy out gassing Studies at IIT
SksMinus status 04 HB meeting 2008/5/09 白鳥昂太郎.
Distribution Student Task
SksMinus status 03 HB meeting 2008/5/02 白鳥昂太郎.
Presentation transcript:

SksMinus status 05 HB meeting 2008/5/16 白鳥昂太郎

Contents  Helium target

Helium target status Designed by Ishimoto-san 335 mm  Optimize Target length : 335 mm (very tight length)  Target shape : Cylinder → Elliptic cylinder, material selection  Arm design : HBJ frame  Test Cooling test by refrigerator Existent vacuum chamber with the same arm length Hyperball-J (Frame outer size)

Points  Arm design : No interference to HBJ frame  Target shape : Not cylinder ? Material : Al or CFRP As small background as possible Thickness : Enough thickness to pressure or thin surface with additional parts

Arm design Hyperball-J (Frame outer size)

Arm design Target arm cannot be changed ! 1. The design is the unique solution of the design for the tilted arm °is the limit to connect the target cell. →The tile angle can be smaller, if the Helium target refrigerator moves to the upstream. But, the upstream part of the target cell length has to be longer. In addition, the connection structure is very thigh to change.

Target shape

 Cylinder target is much better than ellipse cylinder target. Target outer cell becomes larger ! The thickness of surface becomes thicker. There is no good method to make thinner ellipse cylinder target than cylinder target. Ishimoto-san and company have no experience to make such an ellipse cylinder target. ⇒ R&D  The diameter of 220 mm is the limit, if the inner cell diameter is 120 mm.  Cooling time can be faster with the change of the heat exchanger. (And, at first by using liquid Helium, it can be much faster.)

Refrigerator  Ishimoto-san has 2 refrigerators and 1 compressor. We can use 1 set of refrigerator and compressor. If possible, he wants to buy 1 compressor. Cost: refrigerator : 230 万円, compressor : 230 万円, set : 450 万円  The structure of heat exchanger will be changed for the Helium cooling. In previous his test, the structure is for the liquid Hydrogen target.

Refrigerator From compressor Helium duct Heat exchanger Vacuum pump port Helium buffer tank

Pictures

Summary  Target arm : To change Hyperball-J frame  Target shape : Cylinder (Ellipse cylinder R&D) ⇒ Design is finished, after those things are fixed. And, Ishimoto-san will estimate the total cost.  Test : To cool Helium to the liquid with the refrigerator optimize.

Plan 図面⇒干渉チェック HBJ の干渉を見て避けるような geometry でシ ミュレーション