Road to Prosperity. UP GRADATION OF AIRPORT SEAPORT ROAD TO FOUR LANE -PHASE I – PROGRESS REPORT AS ON 30.05.2015 Upgrdadation of airport seaport.

Slides:



Advertisements
Similar presentations
Understanding Highway Projects in India
Advertisements

Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
BOX PUSHING TECHNOLOGY
SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Measurement for Civil Engineering works
Bridge Engineering (6) Superstructure – Concrete Bridges
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
TEQIP-II Institutions
PIPE CULVERT By CH. VENKATARAMAIAH.
Earthwork Operations & Equipments
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Chapter 34 Bridge Construction.
E4014 Construction Surveying
Drainage Services Department Drainage Project Division Contract No. DC/2007/01 Contract Title: Drainage Improvement Works in Ki Lun Tsuen, Kwu Tung, Ma.
UNIT-I STANDARD SPECIFICATION FOR ROAD BRIDGE
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Road to Prosperity. UP GRADATION OF AIRPORT SEAPORT ROAD TO FOUR LANE -PHASE I – PROGRESS REPORT AS ON Upgrdadation of airport seaport.
Earthwork: Use of Fine Grained & Granular Material.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Other Construction Projects
Introduction to a pit installation
Roads And Bridges Development Corporation of Kerala LTD
Bridge Engineering (5) Substructure – Abutments and Piers
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
PROJECT REPORT DESIGN CONCEPTS OF BOW STRING GIRDER (40 M SPAN) OF ROAD OVERBRIDGE AND DESIGN OF SUB STRUCTURE FOR THE SAME.
Concrete Barrier placed at unauthorized median at Ch
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
ROB at Koratty in lieu of LC No.54 Progress as on
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Posting and Utilities Technical Standards Branch Class.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
There are 2 Types of Bridge Inspectors – Class B and Class A.
PRESENTATION ON WATER COOLING TOWER
1. 2 ONGOING PROJECT -1-ROB AT PARAPPANANGADI-PROGRESS GRAPH
Analysis of Sediment Yield from Unpaved Roads. Phase I: Unpaved Roads Inventory Field Data Collection  subwatershed scale  ~90 miles of roads  diversity.
Miscellaneous Bridge Components
DIFFERENCES BETWEEN BESMM 3 & 4
Construction Methodology for Suramadu Main Bridge.
Use of Modern Retrofitting Techniques in Udaipur Station Building
ELCITA UPDATE April 2017.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Inspection Form Types Each form has a unique
Required Drawings and Info for Formwork or Scaffold Design
Engineering Terms Bridge Unit.
Temporary Works – P8 Project Practice.
ELCITA UPDATE AUGUST 2017.
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
Project members ROB at Mulamkunnathukavu Progress as on 26/11/10
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
ROB at Pulianam Progress as on
Project members ROB at Mulamkunnathukavu Progress as on
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
ELCITA UPDATE March 2018.
Are We Abandoning Bridges with Remaining Life?
WE-WC Almaty – Khorgos Road Section Materials prepared in %
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Western Europe – Western China motor road “Almaty-Khorgos”
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Construction Considerations
Narrows Bridge - Perth Concrete Repair Works
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

Road to Prosperity

UP GRADATION OF AIRPORT SEAPORT ROAD TO FOUR LANE -PHASE I – PROGRESS REPORT AS ON Upgrdadation of airport seaport road to four lane phase -1 from to Monthly Report Work progress for the Month of May- 15 Sl. No.BOQ noItem DescriptionUnit TotalUp to date Percentage Quantity Clearing and grubbing road landHA % 21.09Excavation for roadwayCum % Earthwork excavation at embankment foundationCum % Loosening, leveling and CompactingCum % Construction of sub-grade and earthen shouldersCum529000% 61.13GSB (Grade I)Cum % Wet Mix Macadam (WMM)Cum % 81.15Primer coat (0.75KG/Sqm)Sqm % 91.16Tack coatSqm % BMCum % DBMCum % BCCum % Kerb stoneRm %

UP GRADATION OF AIRPORT SEAPORT ROAD TO FOUR LANE -PHASE I – PROGRESS REPORT AS ON Sl. No.BOQ noItem DescriptionUnit TotalUp to date Percentage Quantity Construction of embankment (road way cutting material)Cum % PCC M15 for sub-structure - for culverts, drain, utility duct etcCum % PCC M25 for sub- structure/super structure etc for culverts, drain, utility ductCum % HYSD bar reinforecemnt in sub -structureMT % 1.31 Painting two coats of Enamal paintSqm % 1.32 Providing and layiong of hot applied thermoplastic paintSqm % 1.33 Supply and installation of delineatorsNos % 1.34 Providing and fixing of road studsNos % 1.35 Providing and fixing of red reflectorsNos % M20 grade concrete guard posts 200 x 200 mm x1.25 mNos % Cautionery, mandatory and informatory sign 20aTriangular 900mm sizeNos51 100% 21bCircular 600mm sizeNos620333% 22c Informatory/ Mandatory signs 800mm x600mmNos2600%

Sl. No.BOQ noItem DescriptionUnit TotalUp to date Percentage Quantity 23d900mm high octagonNos4125% Place identification retro- reflectorised sign 25a OHM for culverts, openings etcSqm % 26b Chevron signs 600mmx 600mmSqm % 27c Chevron signs 1200mmx 600mmSqm4.400% Tree plantingNos %

UP GRADATION OF AIRPORT SEAPORT ROAD TO FOUR LANE - PHASE I PROGRESS PHOTOS – Ch Ch Ch 9+800Vallathole Jn.

Flyover at Palarivattom in NH 66 (OLD 47) BYPASS Progress Graph

Flyover at Palarivattom in NH 66 (OLD 47) BYPASS Progress Report Si NoActivity Description Total Quantity Cumulative progress upto Balance work up to Actual work done during this Month Work planned for next week Remarks 1PILE Edappally side P10-1,2,3,4,5,6/P11- 1,2,3,4/P12-1,2,3,4/P13- 1,2,3,4/P14-1,2,3,4/P15- 1,2,3,4/P16-1,2,3,4/P17- 1,2,3,4/P18-1,2,3,4,5,6/AP2- 1,2,3,4 2PILE vytilla side AP1-1,3,4,2/ P1-1,2,3,4 / P2-4,2,3,1 / P3-1,2,3,4 / P4- 1,2,3,4 /P5-1,2,4,3/P6- 1,2,3,4/ P7-1,2,3,4/P8- 1,2,3,4/ P9-1,2,3,4,5,6 5 PILE CAP Edappally side P10,P11,P12,P13,P14,P15,P1 6,P17,AP2,P18 7PILE CAP vytilla side AP1,P1,P2,P3,P4,P5,P6,P7,P 8,P9 9PIER Edappally side P10,P11,P12,P13,P14,P15,P1 6,P17,AP2 11PIER Vytilla side AP1, P1, P2, P3, P4, P5, P6,P7,P8,P9 12 PIER CAP Edappally side P10,P11,P12,P13,P14,P15,P1 6,P17,AP2

Flyover at Palarivattom in NH 66 (OLD 47) BYPASS Progress Report Si NoActivity Description Total Quantity Cumulative progress upto Balance work up to Actual work done during this Month Work planned for next week Remarks 13PIER CAP Vytilla side AP1,P1,P2,P3,P4,P5,P6,P7, P8,P9 14 GIRDER EDAPPALLY side G1,G2,G3,G4,G5,G6,G15,G 17,G18,G19,G21,G23,G24,G 26, G28,G29,G30,G31,G33,G34, G37,G38,G39,G42,G43,G44, G46,G48,G49 15GIRDER vytila side G7,G8,G9,G10,G11,G12, G13,G14,G16,G20,G22,G25, G27,G32,G35,G36,G40,G41, G45,G47 16 GIRDER obligatory span service road edply west100%90%10%0%Up to BC DBM completed 18service road edply east100%90%10%0%Up to BC DBM completed 19service road vytila west100%90%10%0%Up to BC DBM completed 20service road vytila east100%90%10%0%Up to BC DBM completed 21 Girder Launching Edappally side Girder Launching Vytila side

Flyover at Palarivattom in NH 66 (OLD 47) BYPASS Progress Photos Girders lifted A1-P1 P16 Pedestal Crib Support for girder P18 Pile Cap

ROB AT ALOOR – MALA PROGRESS GRAPH

ROB AT ALOOR – MALA PROGRESS REPORT Sl NoActivity Description Total Quantity Cumulative progress upto May 2015 Balance work up to May 2015 Cumulativ e delay in days from Baseline Work planned for May 2015 Actual work done- May 2015 Delay in Qty in May 2015 Remarks 1Pile32 0 2Pile Load Test11 0 3Pilecap8 80 4Pier88 0 5Piercap66 0 6Girders8 80 7Deckslab Handrails,KERB & footpath slab casting88 0 9Retaining Wall100% 0% 10Diversion Road works100% 0% 11Adjacent span-Girder 12Adjacent span- Slab

ROB AT ALOOR – MALA PROGRESS PHOTOS Railway Span work ROB View from Aloor side ROB View from Mala SidePainting works in progress

ROB AT ANGADIPURAM PROGRESS GRAPH

ROB AT ANGADIPURAM PROGRESS REPORT Sl No Activity Description Total Quantity Cumulative progress up to May 2015 Balance work up to May 2015 Work planned for May 2015 Actual work done during May Pile Pilecap Pier Pier cap Girders Deckslab

ROB AT ANGADIPURAM PROGRESS PHOTOS – Dismantling of Existing Buildings Girder work at span P3-P4 Shuttering works for P 14 Pier cap

Airport Seaport Road Phase II to Construction of Two River Bridges across Periyar- Progress Graph

5.ONGOING PROJECT-PROGRESS REPORT Airport Seaport Road Airport Seaport Road Phase II to Construction of Two River Bridges across Periyar Airport Seaport Road Phase II to Construction of Two River Bridges Airport Seaport Road Phase II to Construction of Two River Bridges across Periyar- Progress Report Sl NoActivity Description Total Quantity Cumulative progress upto May 15 Balance work up to May 15 Cumulativ e delay in days from Baseline Work planned for May 15 Actual work done-May 15 Delay in Qty in May 15 Remarks 1Pile Pile Load Test321 3Pilecap Pier Piercap Dirt wall422 6Girders ( Main Bridge) Girders ( Main Bridge) launching Deckslab Handrails & footpath slab casting100%0%100% 9 Retaining Wall Aluva side100%0%100% 10 Retaining Wall Thuruthu side100%0%100% 11Road work Aluva side100%0%100% 12 Road work Thuruthu side100%60%40% 13 Girders ( Minor bridge)16 97

Airport Seaport Road Phase II to Construction of Two River Bridges across Periyar- Progress Photos Shuttering works for 38 th GirderSide Bracket fixing for deck slab P6-P7 (Main birdge) Kerb shuttering works for 5 th deck slab Stressing of 37 th Girder 1 st Stage

ROB AT KUMARANELLUR PROGRESS PHOTOS – ROB at Kumaranallor was inaugurated on

ROB AT KUNHIPALLI- PROGRESS GRAPH

7.ONGOING PROJECT-PROGRESS REPORT ROB AT KUNHIPALLI ROB AT KUNHIPALLI- PROGRESS REPORT Sl NoActivity Description Total Quantity Cumulative progress upto May 15 Balance work up to April 15 Cumulative delay in days from Baseline Work planned for April 15 Actual work done- April 15 Delay in Qty in April 15 Remarks 1Pile60 0 2Pile Load Test1 10 3Pilecap Pier16.0 5Piercap16 0 6Girders Deckslab Handrails & footpath slab casting100%30%70% 9Retaining Wall NH side100%0%100% 10 Retaining Wall Mondhal Bridge side100%95%5% 11Road work NH side100%0%100% 12 Road work Mondhal Bridge side100%30%70% 13 Drain Mondhal Bridge side100% 0% 14Service road side100%30%70% 15 Culvert Mondhal Bridge side100% 0%

ROB AT KUNHIPALLI- PROGRESS PHOTOS Hand Rail work in progress P11-P12 Monthal side Service road work in progress RCC Retaining wall works in progressView of Railway portion

ROB AT EROOR PROGRESS GRAPH

ROB AT EROOR PROGRESS REPORT Sl No Activity Description Total Quantity Cumulative progress up to May 2015 Balance work up to May 2015 Work planned for May 2015 Actual work done during May Pile Pilecap Pier Piercap Girders (8+2) Deckslab (8+2) Drainage 40 m30 m100m30m

ROB AT EROOR PROGRESS PHOTOS – P1 A1 ViewShuttering works for P2-P3 slab P4 pier & Piling in Rail way portionPiling in P7 location