Holmes Lot. Holmes Lot Week 1 Discussed and reviewed framing, mapped and measured kitchen cabinet layout and bathroom cabinet layouts, Inspection for.

Slides:



Advertisements
Similar presentations
For XYZ Company Presented by INSERT YOUR NAME Internet Marketing Consultant INSERT YOUR CITY office.
Advertisements

Construction Explanation.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Why we need a new Building We are now a 1,000 member club. The current structure was designed to accommodate 200 (on its best day) The current.
This is a Redneck Handy Mans reference book. Feel free to use any of the ideas. (Click to See Next Slide) Not responsible for fires, flooding, electrocutions,
INTD 59 bathroom design basics. five basic steps in bath design 1.gathering client & project information 2.setting priorities 3.researching and selecting.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Chapter 7 Estimating Plumbing, HVAC, and Electrical Work.
Skyscraper Construction
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Keeping you updated In your neighbourhood… General public notice of upcoming work issued door-to-door Signs will be posted to give general information.
Building Drawings and Symbols
Civil Engineering & Architecture 2.3 Residential Design.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Stick Mann Remodeling a Bathroom. My Background Interested in construction from a young age Took 5 sections of woodshop in high school.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
EDT 51-Floor Plan Design1 Weekend Cabin Retreat Project Basements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
KILSYTH ACADEMY TECHNICAL DEPARTMENT INTERMEDIATE 2 GRAPHICS KNOWLEDGE AND INTERPRATATION REVISON BOOKLET PLANOMETRI C VIEWS Click to edit Master title.
Standard Grade Graphic Communications
Competency: Draw Floor Plans Objective: Identify floor plan symbols.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Chief Architect Unit Identify the Part Grade 7 Computer Unit.
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
Project Management What is Project Management? Why do Project Management? Tracking project timing and cost. Managing project resources (people, materials,
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
HVACR116 – Trade Skills Mechanical Drawings.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Architectural Graphics UNT in partnership with TEA. Copyright ©. All rights reserved.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Allison Morrow’s Senior Project 5/18/15 – 6/9/15.
Copyright © Texas Education Agency, All rights reserved. Architectural Graphics.
Every Drop Counts: Conserve WATER. Townes at Old Stone Crossing Water Leak DID WE Find Source? YES.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Bathrooms & Kitchens Water, Grey Water & Waste-Water.
Sanitary Installers -What does a sanitary installation contractor sell? _____________________________________________________________________ -Who do they.
August 4, 2008 Smoke Testing Public Informational Meeting Smoke Testing Project – University/Prior Avenue Area Hamline Midway Library August 4, 2008 Short.
Objective 7.06 INTERPRET simple drawings. Draw the symbols onto graph paper. Cut out each symbol and glue onto a notecard.
Smoke Testing Information
Slide 1 of 33 Home Inspection Class Redfin’s Montgomery Team September 5, Bethesa, MD Host: Michael Wells & Margaret Plumly Like:
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
Government Engineering College, Rajkot Subject- Building Construction
City of Franklin Department of Building and Neighborhood Services Transitioning from Private Sewage Disposal to Public Sanitary Sewer September 30, 2010.
Introduction to Building Trades Denver High School.
By: Tiilene Barber & Carman Dorsey. $219,777 ( MORTAGE ) 5 BEDROOMS, 4 BATHS, 0.14 Acres $13, ( this times.06) $ 232,963.62( this is for when u.
DREAM BUILDERS, INC. SKETCH PLAN OF MLD DREAM BUILDERS, INC.
IET 120 Project #4 Matthew Porter Construction Project.
Major Steps In Building a SFR
Construction Documents
(Refer to Chapter 2 of the textbook)
Building Planning And Drawing
This is a Redneck “Handy Man’s” reference book
What You Need To Know About Basement Toilet Installation in Chicago
Competency: Draw Floor Plans
Both D bathrooms and e kitchen What makes you special!
STRUCTURAL TIMBER FRAMING
Competency: Draw Floor Plans
Competency: Draw Floor Plans
J bathroom/ hi bedroom/ I kitchen
n/o back to back kitchens
RISER PROJECT F bathroom.
Project 2018 October 31, 2018.
C bathroom/AB and B Kitchens
This is a Redneck “Handy Man’s” reference book
Building standards Mr. Da Silva.
This is a Redneck “Handy Man’s” reference book
This is a Redneck “Handy Man’s” reference book
Presentation transcript:

Holmes Lot

Holmes Lot Week 1 Discussed and reviewed framing, mapped and measured kitchen cabinet layout and bathroom cabinet layouts, Inspection for Sewer and Water Lateral Connections Reviewed basics of Invoicing, scheduling, and billing on computer excel Learned and studied architect maps, grading maps, and importance of excavating dirt for level plane for new construction. Met with HVAC contractor and mapped were ventilation will go through floor joists Video

Holmes Lot Week 1 Witness Sewer and water hookup with house line and main city line (on right). Street patching in video shown below. Gravel was dumped into cut area then pounded in with special machinery. Video

Holmes Lot Week 2 Marked where bathroom shower heads and drains were to be plumbed out. Configured new location for master bath tub to be placed (conflicted with plumber’s plans) and the locations of hose bibs and sump pump drain on exterior. Consulted with HVAC company about location of certain ducts and ventilation will be placed. ed and called new inspector for Nicholas Street. Spoke with Holmes inspector regarding remains of dirt and silt in street. Videos

Holmes Lot Week 3 Laid boards out for roofer truck so mud wouldn’t stick to tires, roofers began lifting crates of shingles to rooftop. Stone for retaining wall was delivered – consulted landscape crew on where to start and place supplies. HVAC crew still punching out duct work, spoke with Fairfax Water about water meter and the fitting/sizing for main water drain Video