AMS Cabling CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common.

Slides:



Advertisements
Similar presentations
AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
Advertisements

AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
AMS - ECAL Feb 17 th, 2003 Page 1 M. Incagli - INFN Pisa Part III cabling Part III cabling + weight S. Di Falco, M. Incagli, F. Pilo, F. Spinella, G. Venanzoni.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
AMS-02 Delta CDR Thermal. Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible”
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Tracker Thermal Control System 1 AMS Tracker Thermal Control System (TTCS) Phase II Safety Presentation SRII meeting, 21 May 2007, Houston Johannes van.
AMS TIM July, 2008 – CERN 1 AMS 02 –Thermal Control System Design AMS-02 Thermal Control System (TCS)
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Vacuum system.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Channelization Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
Status of NA62 straw electronics Webs Covers Services Readout.
1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
POCC activities AMS02 meeting at KSC October 11 th 2010.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
CR AMS-02 D-0161 AMS Configuration Control Board Comments for AMS-02/D-016 Magnetic Spectrometer – 02 (AMS-02) Assembly and Testing Integration Plan.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
AMS-02 JMDC On-Board Application Software Review Xudong CAI / M.I.T. Mar. 1, KSC.
AMS TIM January, Houston 1 AMS 02 –Thermal Control System Design AMS Thermal Control System (TCS): A Status Report Group Leaders: Drj Sun – AIDC,
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Progress with System Integration of the CBM Silicon Tracking Detector
Baby-MIND Modules & Services
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DAQ for ATLAS SCT macro-assembly
Preparations for test of
AMS 02 Electronics TRD Crate Arrangement
Pierluigi Paolucci - I.N.F.N. Naples
UK CMS Oversight Committee Mtg
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

AMS Cabling CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common cables (Mike & Alexei) -Subsystem / detector cables 2) Mock-up tour. (To understand what the starting point for Cad modeling is) 3) Discussion on how best to organize the activity: a) Central CAD designer? Who is willing to CERN for the length of time required to do the job b) under what conditions? c) How best to organize the detector cabling with detector CAD designers remote from CERN.

Electronics subsystem Cabling (integration team +M.Capell+A.Lebedev A.Roishkov) Lower USS Cabling (F.Cadoux, C.Guandalini) TRD / Upper-TOF cabling (Isatec, C.Guandalini) Zenith Radiator Plumbing (? CGS?) Tracker Cooling Plumbing (A.Alvino, E.Perrin, C.Gargiulo) NASA / Shuttle / ISS Cabling (Jacobs: J.Kastelic) Tracker Cabling (E.Perrin, A.Alvino, D.Rapin, CERN integration) ACC (Isatec) UGBS (R.Becker)

Starting points for cabling model:

Magnet and External Magnet hardware

ACC Cabling To S-Crate Al-Cover on PMTs (schematic)

ACC Cabling To S-Crate Al-Cover on PMTs

Cable clasp On the border of VC ring

TRD And ACC Cabling And Thermal Insulation Al- Cover

Dallas sensors (DTS) on ECAL back panels To be fixed on ECAL before EIB assembly (accessibility) Intermediate bracket BP4R routing (… BP5R is about the same routing) DTS routing ECAL Bracket DTS board (glued on End caps) Intermediate bracket 1

ECAL cabling to the Crates ECrate (DAQ,EDR…) HV cables to HVBrick LUSSII ECAL ECAL Integration on LUSSII DTS cables (from ECAL brackets to Crates) DAQ Cables

Still to be assembled on ECAL EIB Cabling + Radiator fixation (36 Boards / 20 Mechanical supports) EIB frame “heaters” cabling + Terminal Bock DAQ cables HV cables Trigger cable support DAQ cable support EIB frames

As you can see, except for F. Cadoux’s lower USS model Most of the cabling models are under developed or missing!..

Mock-up Tour!

How do we resolve Cabling? Tasks: Cable routing Mockup Cable routing CAD Bracket design, calculation, manufacture 3) Discussion on how best to organize the activity: a) Central CAD designer? Who is willing to CERN for the length of time required to do the job b) Under what conditions? (only work share etc, not contractual) c) How best to organize the detector cabling with detector CAD designers remote from CERN.

Tasks: Critical Cables: Installation Priority??! 1) CAN Bus 2) AMS Wire1 3) PDS2 4) XPD cabling 5) Sub-detectors (need to prioritize) n) GTSN (Dallas) Critical Brackets: 1) vertical tubes on VC 2) Front panels 3) Balconies (info from Mockup?)

Possible Solutions (pending agreement internal to each person’s institute / Co.) a)Franck 4 CERN from February, need full funding for this time -need to guarantee maintenance time -% work time designated to AMS cabling for follow-up. To what %age (min 1-2 days a week supported by LAPP) a)Antonella: Contract with CGS 4 months, from Feb -need to guarantee maintenance time -% work time designated to AMS cabling for follow-up. To what %age Uses UG compatible with NASA model. Will need training period for new NX4 version and harnessing module. c) Serena Starting Now! Supported by INFN Perugia (?!) –learning CAD and harness program, Follow-up possible? To what %age? (will have to attend TVT-test starting end February-July but can support to a degree) d) Combined: Serena starts immediately with Franck joining February. Follow up? Who? (Franck can support 1-2days/week) What %age. (Serena? ) Need Big! Computer + CAD licenses Office in 892 RBxx double office for 4 engineers. Available!

Input Needed: List of cables (Xcel table) Front panel drawings – labeled. Or clarification!.. Ask Mike.. Or CGS web-site Updated detector models (and simplifying when necessary) Cables routed on mockup & photos (when needed) Fixation points (USS, crates, links, detectors, etc.) Cable properties Cross section (sleeves, MLI?), weight, bending radius Sticky tab properties (load rating) Plumbing routing (magnet, TTCS, UGBS, Zenith radiator,) (MLI) CAD Licenses

Electronics Boxes installed in this step: ERPD0, ERPD1 All Electronics and structural links have now been installed forming a self supporting “Gemini” structure The Crate Jigs are now ready to be replaced with the flight radiator S0 U0U1S1UG SHV1 SHV0 UGB UGPD UPD0 UPD1 SHV2 S2 TT TTT TT T TSPD3 TMPD2TSPD1 TSPD0 TPD7TSPD6 TPD5 TSPD4 GPS PDS JT CCEB JPDJ CAB UPS CDD TTCS M TT TTPD S3 SHV3 CVB ERPD1 ERPD0 Ram Crates Wake Crates Radiator Electronics Installation (step 5)

Crate Jigs Wake Ram

Ram Crates & Jig

Wake Crates & Jig