ISSUE RESOLUTION & ESCALATION Training Pack

Slides:



Advertisements
Similar presentations
Learning from Events 12th June 2013 The Tata Steel Approach
Advertisements

Airbus Production System
Performance Management System
Airbus Production System
Tactical Implementation Plans (TIP’s)
Airbus Production System
Pre Planning: Identification of Need 1. Develop/Review Student Learning Expectations 2. Examine alignment of learning expectations with assessments 3.
EMS Checklist (ISO model)
SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
Effectively applying ISO9001:2000 clauses 6 and 7.
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
 Truths About Change  Work Smarter, Not Harder  Lean Processing  Wants and Needs  How do we begin?
Tools & Techniques Plan-Do-Review PLAN DO REVIEW.
Stability Tools TPM What is TPM ?
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
Issue Identification, Tracking, Escalation, and Resolution.
Standard Work Standard Operations Training Pack. Aims & Objectives Target Audience Production staff, ME & Training personnel Aim To give attendees the.
“Into The Future” CCM Guidance draft version 2 June 2012.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
Project Management Workshop. Nick Cook  Citigroup Corporate and Investment Bank  European Technology Business Office Manager Edinburgh University April.
Business Operating System
Project Control Techniques
ICASAS305A Provide Advice to Clients
Best Practices – Overview
Problem Management Overview
ASPEC Internal Auditor Training Version
Implementation of Project Governance at the Center Level
Problem Management SDG teamIT Problem Management Process 2009 Client Services Authors: M. Begley & R. Crompton, Client Services.
Accelerated EMS Session 4 – 28 January 2008.
Release & Deployment ITIL Version 3
Key Performance Indicators - KPI’s
S/W Project Management
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
ISSUE RESOLUTION & ESCALATION Training Pack
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Remedy – Customer Portal Fiona Gregory McKesson CRM 1.
Service Transition & Planning Service Validation & Testing
Project monitoring and Control
Skills and Techniques Intermediate 2 & Higher Physical Education.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
Standardised Work: Creating Workpackages. The 2 Routes to Workpackage Implementation Identify Work Sequence Identify Categories of Work Calculate Takt.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
X Project Highlight Report – (Date) Achievements  Key high level outputs delivered by the project this month. Communications Key high level communications.
Introducing Project Management Update December 2011.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.
Project management Topic 1 Project management principles.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Project Management Risk and Quality.
Operations & Maintenance Working Together. To CP4 and beyond...
S D BELLAMY - Group Total Quality Manager - 22 August 2000 ( 5TH Revision - Health Version ) PDCA Problem Solving Guide A Guide to a Team Approach to.
1 Home Care Support Outcome Based Specification Workshop 26 th November 2009.
Supplier Corrective Action Request (SCAR) Supplier Training
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
ROLE of a Continuous Improvement LEADER
Causal Analysis & Resolution (CAR) Support Category
PDCA Problem Solving Guide
Supplier Improvement Program
Guidance notes for Project Manager
Change Assurance Dashboard
Supplier Problem Resolution Problem Improvement Request
ISSUE MANAGEMENT PROCESS MONTH DAY, YEAR
Presentation transcript:

ISSUE RESOLUTION & ESCALATION Training Pack Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Aims and Objectives Target Audience : All Operations and Support Management Teams Purpose of Module : To understand the need for a consistent root cause problem resolution process which encourages problem solving at every level. To provide a framework for a common system to be utilised. Aims & Objectives : Explain basic Problem Solving Importance of PDCA To explain the common framework enough for the team to set one up unsupported Duration : 1.5 hours Attendees : 5-15 Run through aims and objectives. Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Contents Why do we need an Escalation Process? Common Approach to All Issues Problem Solving Operations Issue Escalation Change Process Issue Escalation Quality Issue Escalation How to Complete an Issues Sheet How to Complete an Escalation Strip Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Why do we Need an Escalation Process? Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Why do we need an Escalation Process? WE HAVE No visibility of actions or ownership. No formal containment/customer protection. No monitor of countermeasure effectiveness. No indication of when issues are closed. WE WANT All issue escalation, across all functions and work streams to be addressed in a consistent/standardised manner. Consistent approach for all issues generated from projects, change process, operations, quality, etc Problems we see at the moment can often be traced back to poor communication in both directions, i.e. people believe they haven’t got a “voice” and that if they are “listened” to they never seem to hear back on a resolved. Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Escalation Escalation is a last resort. Prior to escalation there must be the capability and the capacity to attempt root cause problem solving. Ownership of the issue must be agreed at whatever level the issue is raised, e.g. by engineer at team level or by EGL at department level. Progress of issues should be formal review at daily or weekly sessions. Issues raised should not just be EXTERNAL, i.e. issues that are judged to be “someone else’s fault!” Communication of progress is critical, particularly to those who raise the issues initially (take them to see escalated strips if necessary). Satisfy the need for increased visibility, i.e. do not “fire and forget”, we need to see the progress of an issue and the appropriate counter-measure. Problem solving at any level should involve the wider team, i.e. if the problem is raised at team level and problem solving is being attempted, do you need Quality, Engineering, Logistics representation? Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Problem Solving Slide Verbal Flip Chart Training Matl. Photo Prepared Extra Info Available

Problem Resolution Detailed Problem Resolution Asking Why 5 times will only help to identify a potential root cause. The ‘Strip’ is a summary of an issue. The ‘Corrective Action Report’ is a tool for ensuring more in depth, problem resolution and Root Cause Analysis. Evidence that systematic problem solving has been attempted at each level prior to escalation. Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Cause and Effect Diagram Analysis of Problems Qualitative tools Tools which are used to obtain and structure ideas during the problem solving cycle Flow Chart Cause and Effect Diagram Out of specification Method Man Materials Machinery Environment Brain Storming !!! Problem solving tools can be classed as “Qualitative” or “Quantitative” Qualitative - tools that are used to obtain and structure ideas during the problem solving cycle Flow Chart - links activities using ASME symbols useful for removing waste from a process. Cause and effect - sometimes know as…….. Will go into more details during this presentation. Brainstorming - getting peoples ideas light comes on people think out of the box. 5 x why - Getting people not to accept the first answer. General these tools will be gone through in more detail in the “Problem Solving” Training Pack. 5 x WHY Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

1 2 3 4 5 5 Why’s Example Root-cause Q : WHY has machine stopped ? A : Overload tripped out ! 1 Q : WHY overload trip ? A : Insufficient oil on shaft ! 2 Q : WHY Insufficient oil ? A : Oil pump inefficient ! 3 4 Q : WHY is pump not efficient ? A : Pump drive shaft worn ! 5 Q : WHY is this shaft worn ? A : Oil filter blocked with swarf ! Root-cause Each mouse click moves the example along to the next stage Talk around the steps.. Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Analysis of Problems Pareto Check Sheets Quantitative Tools Tools that are used to gather and analysis numerical data during the problem solving cycle. Pareto Defects Welding Grinding Cleaning Painting Packing Week No. Check Sheets The other types of tool are Quantitative tools, Tools that gather and analyse numerical data during the problem solving cycle. Check sheet - Simple data capture sheet using 5 bar gate. Pareto - Combination bar and line chart used to priorities activity and to show the relationship between two variables . Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Analysis of Problems Histograms Control Charts Scatter Diagram Quantitative Tools Histograms UCL LCL Control Charts Scatter Diagram Control charts - These charts are used to track performance and will help identify when an abnormality has occurred . Histograms - These charts are used to show frequency and profile of either outputs or inputs. Scatter Diagram - These charts are used to establish if there is a relationship between a cause and effect. Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Problem Solving The 5 Principles :- Problem Definition Identify Root Cause Customer Protection and Countermeasure(s) Confirm Effectiveness of Countermeasure Feedback / Feed forward Talk around the 5 principles :- Problem definition - does everyone see the problem in the same way Root cause - focus on the cause not the effect solve the problem Customer Protection - important first action!!! Countermeasure - what is the action that is going to stop the problem from re-occurring . Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Customer Protection and Confirm Effectiveness Problem Solving Cycle Problem Definition Identify Root Cause Feedback / Feed forward Plan Do Check Act Customer Protection and Countermeasure Talk around the problem solving cycle and where the five principles of problem solving fit into the Plan Do Check Act cycle. This brings each stage up at a time give a brief over view. At check the red arrow appears at the next important point if the check fails to show improvement go back to DO and review countermeasure. Confirm Effectiveness Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Issue Escalation Slide Verbal Flip Chart Training Matl. Photo Prepared Extra Info Available

Issue Escalation A Rank B Rank P D C A Issue First Raised ? Issue Identified affecting Ops Issue Identified affecting Ops Rank Issue (if required) A Rank Impacts on next process T/L, S/L A or B i.e. Chasing the part via phone, fax, feet or Andon and delivering it late Protect Customer (Get Job Going) Write on Team Issues Board B Rank Will not impact on next process T/L Monitor Occurrences (e.g. 4 weeks) Occurrences (e.g. 5) Sign-off board No Yes Problem Solving lead at Team Level This may look complicated on the screen but the basic mechanics are very simple at each level. From an operations view point we can identify issues at a team level, get the job going (protect the customer/contain the problem) and then monitor to see whether the problem is likely to re-occur. If the problem becomes one of the top issues then attempt to resolve using a structured approach. Was the counter-measure successful? Did it stick (PDCA)? Should the team try again? Should the problem be escalated? P D C A Problem Solved by Team Yes Monitor Successful? Sign-off board Yes No (Re-Issue or Escalate?) Escalate Strip Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Stakeholders Involved Operators Functional Representatives Team Leaders Cell Leaders Product Unit Managers Direction Of Escalation Functional manager Assembly Manager GM Involvement in exceptional circumstances Key Involvement / Responsibilities / SLA Involvement when earlier process exhausted or in case of MAJOR issue Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Escalation process Stage 1 Operator Team Leader Shift Leader D/Mgr Mgr Once an abnormality is identified it is escalated to the Team Leader to resolve it. The Issue is not escalated beyond this point until the Team Leader has tried everything in his power to resolve the issue If TL cannot resolve it, then, and only then raise it to Shift Leader. Operator Team Leader Shift Leader The escalation process should endeavour to be contained within the 1st level of management. Once the light has been triggered anf the Team leader is aware of the abnormality they should try to eliminated it as soon as possible. IT IS THE TEAM LEADERS ABNORMALITY, and he/she should do everything in his/her power to solve the problem. If the problem continues to threaten the workpackage, the T/L should raise the problem to the next level. The organisation should be in place to support this decision HELP! D/Mgr SUPPORT Mgr Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Protecting the Customer Agree with suppliers an agreed level of support (Service Level Agreements). Might include:- Response times. Attendance at issue escalation meetings, i.e. IPT, Ops Reviews, etc. Ensure expected levels of service are clearly communicated and visible, i.e. what is acceptable! Ensure an effective communications system, e.g. “hot lines”, radios, Andon Signals. Approach suppliers/support with a consistent system, i.e. agreed standards. Ensure the root cause is understood! Do not pass on issues that you could be unwittingly causing yourself…. Protect the Customer / Contain the Problem:- Ensure that awareness is raised of an issue so that the chances of it being repeated until the full counter-measure is in place, are minimised. A Customer Protection process should still be as robust as a long term counter-measure but would typically cost more, i.e. more time, slower pace of production, more inspection, etc. Service Level Agreements must include an agreement of the requirements of a customer on a supplier and vice-versa, i.e. the customer can do to ensure the service level is met. Processes for communicating problems and need for support, must be consistent, i.e. if every model line contacts H&S, Facilities, ME, etc. in a different way, then efficiency is going to suffer. Imagine that there was no 999 service an some people rang, some faxed, some radioed!!!! Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Fully supported by SLA’s Natural Workgroups Fully supported by SLA’s Department contact/Representatives

Issue Escalation Escalate Strip Issue First Raised ? Present Strip at IPT Present Strip at Shift IPT Raise the issue at the point in the process that you have the capacity to problem solve at! Problem solve at the higher level if the issues are highly visible. Only when the “bigger” issues have been removed can this give the team and team leaders the capacity to problem solve. Since those “smaller” issues are not as visible at a higher level, the ability for the team and team leaders to address is critical. Agree that it can’t be resolved at Team level Establish Issue Owner Yes Root Cause Countermeasure Established Monitor Yes Successful? No Sign-off board/strip No (Re-Issue or Escalate?) Escalate to Weekly Dept. Ops Review Escalate to Dept. Ops Review Each layer of the Management System has the ability to both raise and solve problems. Raise the problems at the point at which there is the capacity to do something about it! DO NOT get 30 T/Ls to all raise the same issue if the problem is highly visible at PUM level and the T/Ls would not have had the capacity to resolve anyway. Establish Issue Owner Yes Root Cause Countermeasure Established Monitor No Successful? Sign-off board/strip Yes No (Re-Issue or Escalate?) Escalate to Model Line Review Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Issue Resolution Sheet - Process TEAM LEADER NUMBERS AND DATES THE ISSUE, THIS WILL BE SPECIFIC TO A UNIT 7

Issue Resolution Sheet - Process THE ISSUE RAISER ENTERS HIS / HER NAME IN THE RAISED BY BOX 7

Issue Resolution Sheet - Process A CUSTOMER PROTECTION IS PUT IN PLACE BY THE TEAM LEADER, ALONG WITH THE NAME OF THE RESPONSIBLE PERSON 7

Issue Resolution Sheet - Process THE DEPARTMENT RESPONSIBLE IS IDENTIFIED WITH A NUMBER / COLOUR CODED CIRCLE 7

Issue Resolution Sheet - Process THE PERSON RESPONSIBLE IS CALLED TO THE BOARD TO SIGN, ACKNOWLEDGING THE ISSUE AND ACCEPTING RESPONSIBILITY TO RESOLVE 7

Issue Resolution Sheet - Process THE PERSON RESPONSIBLE ENTERS THE COUNTERMEASURE TO BE TAKEN. PROGRESS IS TRACKED USING THE STATUS QUADRANT 7

Issue Resolution Sheet - Process THE DATE THAT THE COUNTERMEASURE IS TO BE PUT IN PLACE IS ENTERED (OR UNIT No IF ITS AN ENGINEERING CHANGE) 7

Issue Resolution Sheet - Process UPON THE DATE ARRIVING, THE PERSON RESPONSIBLE COMPLETES THE TRACKER BOX FOR 5 UNITS GREEN – OK, RED – NOT OK 7

Issue Resolution Sheet - Process WHEN THE PERSON HAS SATISFACTORILY TRACKED 5 UNITS THEY COMPLETE THE SIGN OFF BOX TO STATE THE RESOLUTION WAS EFFECTIVE, AND HAS PROVED ROBUST ….if the countermeasure fails, the issue is re-raised using the old number, prefixed by R. (R is for REPEAT issue) 7

Escalation process Stage 2 Operator Team Leader Shift Leader D/Mgr Mgr Once all effort to solve the problem have been exhausted at Team Leader level, the problem is escalated to the highest level to avoid non completion of a process or avoidance of program slip. Operator Team Leader Shift Leader Again the Shift leader or equivalent should do everything in his/her power to alleviate/ eliminate the problem. At a point where the shift leader is having no luck in solving the problem the issue should be elevated to the next level etc. etc. until the problem is solved. The timing of this escalation should be agreed as part of the escalation process and should be strictly adhered to. D/Mgr Mgr HELP! SUPPORT Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

IPT or Operations Issue Board - Example IPT ISSUES BOARD Measure ISSUES Top 10 Issues Monitored ISSUES Escalated Issues Closed Issues Proposed ‘Standard Issues Board” At daily IPTs or weekly Ops Reviews use as a focus for either raising issues or displaying issues escalated up to the particular meeting. Display general issues in the left hand “Issues” column and obtain ownership, countermeasure, plans, dates, etc. If the issue is one of the top 10 for the department place in the middle column. At the meeting track progress, i.e. suggest that time and number of issues permitting that the top 10 would have the focus and progress monitored each week. Once a countermeasure implementation date is reached and the issue is resolved?Move the strip into the “Monitored” column. Monitor it for the pre-determined period, i.e. 5 weeks, 5 Units, 5 months. Did it work? If the issue could not be resolved at this level move the strip into the “Escalated” box ready for the designated person to move them to the Operations Centre? Any issues that were monitored and did not failed should be placed in the “Closed Issues” box in case of failure at some point past the monitoring period, i.e. a brief history to refer back to. A record of the PRD process (root cause problem solving, etc.) should be kept close to the board to re-enforce the process. PRD File Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

No (Re-Issue or Escalate?) Issue Escalation Model Line Review Establish Issue Owner Yes Root Cause Countermeasure Established Monitor No Sign-off board/strip Yes Successful? No (Re-Issue or Escalate?) Escalate to Ops Centre After exhausting all possibilities going up the hierarchy, then finally there is the potential to escalate to Business Level. Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Issue Escalation Monday 10.00am Ops Review Priority Issues : Escalate to Ops Centre Monday 10.00am Ops Review Issues Escalation Priority Issues : Prioritise and ask whether the Ops Review is the right vehicle Need ownership / champion Added to Issues & Actions Register, RAG status, etc. GM to ensure communication of status back to team level Logistics Facilities Human Resources Engineering Outstanding Issues : Are owned Still open as no countermeasure in place (issues at this level could be open for a number of months) Procurement Finance Lean Quality Closed Issues ? : Countermeasure in place Being monitored for 5 Units before removed from board Closure of issues communicated back to Team level Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Stakeholder responsibilities Team Leader; Enters issue raised by operator onto board as he deems necessary Dates and numbers the issue Determines the natural work group owner of the resolution Determines Customer Protection action Calls owner from natural workgroup, requests that the board is visited in a timely manner (before the end of the shift). If problem is urgent then assistance may be required immediately Reviews actions planned and checks progress with owners as appropriate. Update the board during shift with Natural Work Group Owners TL collects downtime logs from operators each shift, identifies any issues that are repeating issues or his largest cause for concern or downtime,prioritises these and enters onto the issues sheet for resolution.

Stakeholder responsibilities Shift Leader; Ensures that issues from previous shifts are communicated to current T/L Ensures that new issues are recorded appropriately during shift Ensures that the natural work group owners have signed to accept issues by end of shift. Ensures that countermeasures due to be implemented during the current shift are checked for status Ensures that issues on monitor are assessed by the T/L on shift Reviews status of problems with the Team Leaders daily Assists teams with issue resolution Raises any escalated issues through daily IPT meeting

Stakeholder responsibilities Deputy Manager; Friday 8.30-9.30am Attends IPT meeting once weekly to review outstanding issues with operational equivalents/ reps from the supporting departments by EXCEPTION. Reviews resolution progress as presented by the Shift leader. Identifies areas where extra support is required Tasks operational equivalents/reps for support departments to provide appropriate support where it is required Determines with the D/Mgr team any issues that require escalation Raises ‘Escalation Strips’ as appropriate

Stakeholder responsibilities The Assembly Manager/GM Thursday 10.30am Attends weekly ‘Strip Meeting’ with GM for all stakeholders in the Natural Workgroup Presents ‘Escalation Strips’ to senior team Pins strip under the department responsible on the ‘Strip Board’ Seeks support and accountability from Senior Team Does not discuss individual issues, but aspects that are appropriate for senior level review Records actions on strip, and seeks review of the ‘Escalation Strip’ outside of the meeting

Stakeholder responsibilities Support Head/Representative of Function ; Ensures that a you respond to call to visit department Board in a timely manner I.e. within the shift. (or immediately if the issue is urgent) Be responsible for the issue by signing the sheet & accepting responsibility and customer protection action. Ensures that countermeasures due to be implemented during the current shift are checked for status. Reviews actions planned and checks progress with Customer as appropriate. Update the board during shift with customer. Rep/Head of function to attend weekly meeting with D/Mgr for department (Friday 8.30am IPT) to address any issues with appropriate support where required. Head of function to attend weekly GM meeting(Thursday 1.15pm) on specific Strip issues to discuss aspects that are appropriate for senior level review.

Escalation Criteria / process 1.Issues are raised on the board when; There has been an accident or near miss on section There is a repeating cause of disruption The issues lead to a Defect The issue leads to scrap/rework The issue impedes Program achievement 2.Issues are flagged to Shift leader when; Resolution is not progressing as planned A customer protection action must be relayed to opposite shift An owner has not visited the board during the shift A countermeasure has failed when monitored The issue has prevented productivity achievement for the shift There has been an accident or near miss on section All attempts to resolve have failed and action is required Urgently - FAST TRACK the issue

Escalation Criteria / process Cont; 3.Issues are raised to D/Mgr Level When; Counter measures have failed on more than one occasion. The issue owner has not visited the board during week. Implementation dates have been missed on more than one occasion. More than 1 shifts productivity has been impeded by the issue. An accident has occurred on section. All attempts to resolve have failed and action is required Urgently - FAST TRACK the issue 4. Issues are Now raised at Support Review Support Stakeholders to address any issues Highlighted at this stage.

Escalation Criteria / process Cont; 5.Issues are Escalated to Assembly Manager when; An owner has not signed for the issue 2 weeks after it is raised. Counter measures have failed on three occasions. Timing to implement counter measures have failed on three occasions. The Natural Work Group does not have the resource to address the issue satisfactorily. All attempts to resolve have failed and action is required Urgently - FAST TRACK the issue 6. GM (strip) meeting ; Attended weekly by GM, Assembly Manager and Stakeholders from natural work groups. To present strips to senior team, seek support and accountability Discuss aspects that are appropriate for senior level review. Record actions on strip and seek to ensure review of the Escalation strip outside of the meeting. Failure of stakeholder to attend over an issue may cause issue to be raised at Manufacturing Management Team review.(MMT)

Review Structure for Escalation Daily TL TL and Operators raise issues to Issues sheet Daily- SL 5 minutes prior to Board Mtg, with each TL run through any escalation issues Daily Part of Go & See D/Mgr & SL propose,debate strips to escalate to next level Friday IPT 8.30-9.30 D/Mgr holds issue review with support equivalents representatives from natural work groups in IPT. Determines what to escalate to assembly manager THURSDAY drumbeat GM chairs meeting, Assembly manager & stakeholders from natural work Groups attend. Strips put on issues board.Assembly Manager Seeks support & accountability from senior team Records actions on strip, and seeks to ensure review of the ‘Escalation Strip’ outside of the meeting. WEDNESDAY afternoon Assembly Manager and D/Mgr review strips for escalation to Thursday meeting MONDAY Strips raised at MMT meeting

FAST TRACK Structure for Escalation If an issue arises that requires URGENT attention and is obviously outside your scope of authority, raise it verbally with your immediate senior. Then raise it as an issue on the sheet for a follow up and to receive feedback. Common Sense MUST Prevail ! If Joe Bloggs breaks his leg in the pit, you wouldn’t just write it on the Issues sheet. Good verbal communication is essential, the issue escalation process does not replace this.

ERRORS & DEFECTS / Unit Errors Defects 50 40 30 20 10 Ensure that any systems that are put in place are measurable, have acheivable targets and are monitored against them. 10 DATE 10/11 11/11 12/11 13/11 14/11 15/11 16/11 17/11 18/11 12/11 20/11 Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Team Boards - Example TEAM BOARD : STATION 99 SHIFT : TEAM LEADER : QUALITY COST DELIVERY PEOPLE SCRAP CONCESSIONS / DEFECTS PRODUCTIVITY SKILLS MATRIX ATTENDANCE HEALTH & SAFETY TAKT ADHERENCE 5C CURRENT PREVIOUS LOCAL INFORMATION DISRUPTIONS SHIFT : TEAM LEADER : SIGN OFF PRD File ISSUES RESOLVED Proposed ‘Standard Team Board’ with use of ‘Q’ Strip / Blue Card System Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

How to Complete an Escalation Strip Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Escalation Strip Number and Rank Countermeasure Who Resp Sign Off Date Rank A, B, (if required) Countermeasure Identified root cause and resulting countermeasure(s) Who Resp Who has taken ownership for the issue What function is responsible for the countermeasure Colour Code/Dept. No, etc. Sign Off Signed by the customer of the countermeasure Only after being monitored for agreed period Date Date escalated strip produced W/P Number The number of the Workpackage where the issue originated Monitor Tracking the success of a countermeasure State unit being measured, i.e. Unit No., days, shifts, etc. Mark number of successful periods/Unit When Planned date for introduction of countermeasure Issue Description of issue and its impact i.e. part not delivered on time Customer Protection What can be done to protect the QCDP until a root cause countermeasure is in place? What can be done to minimise the impact of an issue? What can be done to ensure that potential previous units are not affected? Date raised on Issues Board Date the issue was first logged, i.e. on team issues board. Raised By Who originally logged the issue on the Team Board Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available

Escalation Strip - Back Ask Why 5 times Basic technique to identify the actual root cause Customer Protection / Containment The Unit No. the defect was identified on and all current WIP checked for conformance to standards. Root Cause Root cause demonstrated through clear process NOTE:- USE AS A SUMMARY ONLY OF MORE COMPLEX PROBLEMS Slide Verbal Flip Chart Training Matl. Photo Prepared Flip chart Extra Info Available