1 Pressure observations at TDI till fill 2158 V. Baglin (27/08/11) CERN TE-VSC, Geneva 1. 2.

Slides:



Advertisements
Similar presentations
Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
LHC Beam Operation CommitteeJune, 14 th UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S.
Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Beam load estimates for the PS2 Beam Dump Systems T. Kramer, M. Benedikt, B. Goddard.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
TE-VSC Group J.M. Jimenez Installation (temporary) in the RP Bunkers (UJs)
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Electron cloud in the LHC: lessons learnt from 2015 experience with 25 ns beams G. Iadarola, H. Bartosik, K. Li, L. Mether, A.Romano, G. Rumolo, M. Schenk.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Pressure data from SPS MDw35 H.Neupert, M.Taborelli For SPSU, 23/09/2010.
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
SPSU M.Taborelli Results from MD week 45 Views of extracted liners and RF shields M. Taborelli for SPSU team.
Polarized internal gas target at LHC
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
BEAM LOSS MONITORING SYSTEM
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Electron cloud & vacuum pressure observations: 2011 proton run
TDI Coating test at HiRadMat Proposal 1605 HiRadMat Scientific Board Meeting 27th June 2016 I. Lamas Garcia, M. Calviani, R. Ferreire, A. Perillo-Marcone.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Observations with different bunch spacings
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
BEAM LOSS MONITORING SYSTEM
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 09/12/2012
Scrubbing progress - 10/12/2012
Sensitivity tests of BLM_S chamber in PSB dump
Saturday 2/4/ :00-09:00 Problems with SPS:
Wednesday 03/11 – The Plan Finish electron-cloud program:
Monday – Morning Fill 3265 stable beams since 1:31
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Summary first Scrubbing test 31/10/2010
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Tuesday – Morning and Evening
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Presentation transcript:

1 Pressure observations at TDI till fill 2158 V. Baglin (27/08/11) CERN TE-VSC, Geneva 1. 2.

Effect of particle loss 2

Fill 2040 : Injection 3 A pressure increase is observed at each injection shot  TDI8R = 2 to mbar  TDI2L = 1 to mbar Pressure increase slopes are different between TDI2L and TDI8R At 23h42 pressure increased in both TDI : moving injection collimators out Final values at 3.5 TeV are the same.

Direct proton losses on TDI 4 A pressure in the range of a few mbar correspond to a proton loss of some Today we have p/beam and a proton burn rate of p/s

Effect of heating 5

History at TDI 6 mATDI2LTD8Rkbppb (x10 10 ) 1727↘↘336 b ↘↘480 b ↘↘480 b ↘↘480 b ↘↘480 b

History at TDI 7 mATDI2LTD8Rkbppb (x10 10 ) 1743↘↘624 b ↘↘624 b ↘↘624 b ↘↗768 b ↘↗ ?768 b

History at TDI mATDI2LTD8Rppb (x10 10 ) ↘↗ ↗↗ ↗↗ ↗ ?↗ ↗↗

History at TDI mATDI2LTD8Rppb (x10 10 ) ↗↗ ↗13.5 Long stop4 days

History at TDI mATDI2LTD8Rppb (x10 10 ) ↗ ?↗ ↗↗12.7

Pressures at TDI - fills Fill : 50ns_13080b+1small_1318_39_1296_144bpi mA/beam to pbb At 3.5 TeV, pressures at both TDI are mbar. Pressure at TDI8R has a slow increase with time. However, there is a delay of a few hours after stable beams P = mbar at ~ 286 mA/beam P = mbar

Fill 2040 : TDI8R 12 There are no linear relation between total beam current and total pressure The pressure decreases faster than the beam current proton burn rate ~ p/s

Fill 2156 : Equilibrium Pressure 13 Fill : 50ns_13080b+1small_1318_39_1296_144bpi mA/beam down to pbb At 3.5 TeV, pressures at both TDI are mbar. Pressure at TDI2L has a also slow increase with time. However, there is a delay wrt to TDI8R Both TDI reached a maximum pressure P = mbar at ~ 311 mA/beam P = mbar at ~ 307 mA/beam

Fill 2158 : confirm previous observation 14 Fill : 50ns_13080b+1small_1318_39_1296_144bpi mA/beam down to pbb At 3.5 TeV, pressures at both TDI are mbar. Pressure at TDI2L has a also slow increase with time. However, there is a delay wrt to TDI8R P = mbar at ~ 312 mA/beam P = mbar at ~ 303 mA/beam Beam was dumped to early …

TS During the TS 4, wk 35, the TDI.8R and TCTVB.8R were equipped with thermocouples TC1 and TC2 are located on TCTVB.8R TC 4 and TC11 are located are located on TDI.8R transitions TC5,6,9 and 10 are located on TDI.8R extremity TC 7,8 are located at the centre of TDI.8R TC3 and TC12 are located at reference vacuum chambers NEG coated. Pressure is measured at TDI by VGPB.231.4R8.X

“Nominal” fills Temperature increased 1h30 and 45 min after machine full for fills 2101 and 2103 respectively. For fill 2103, pressure started to decrease again after having increased. TC10 reached 36 deg TC9 reached 29 deg TC5 reached 27 deg Fill Nb1380 I (mA) Ppb (x1E11) TCdegDeltaWhat ? 1213TCTVB 2244TCTVB TDI 52810TDI extremity TDI extremity 6223TDI extremity 92910TDI extremity 7190TDI centre 8223TDI centre 3171Reference 12212Reference GeV

“Nominal” fills : history

“Nominal” fills For fill 2156, pressure started to decrease again after having increased. TC10 reached 34 deg TC9 reached 28 deg TC5 reached 28 deg Fill Nb1380 I (mA) Ppb (x1E11) TCdegDeltaWhat ? 1213TCTVB 2233TCTVB TDI 52810TDI extremity TDI extremity 6245TDI extremity 9288TDI extremity 7201TDI centre 8223TDI centre 3182Reference 12212Reference

Effect on outgassing rate A temperature increase of ~ 50 degrees increase the outgassing rate by one order of magnitude

Summary 20 Both TDIs behave similarly during injection, they are sensitive to particle loss TDI8R has a systematic slow transient since beginning of May Most of the time, TDI2L pressure decrease or is constant. However, some transient are occasionally observed since beginning of August and confirmed since then Following transient, equilibrium pressure are observed at both TDIs for long fills Transient pressure is correlated with temperature increase of at least 15 deg as measured at TDI8R extremity