Ongo 2-C Radio Telescope

Slides:



Advertisements
Similar presentations
The York College Radio Telescope Ian OLeary, Tim Paglione, & Waynewright Joseph (York College, CUNY) Introduction Radio telescopes allow us to observe.
Advertisements

Chapter 2Test Specification Process. n Device Specification Sheet – Purpose n Design Specification – Determine functionality of design n Test List Generation.
MIS 2000 Class 20 System Development Process Updated 2014.
Design and Computer Modeling of Ultracapacitor Regenerative Braking System Adam Klefstad, Dr. Kim Pierson Department of Physics & Astronomy UW-Eau Claire.
RF Circuit Design Chris Fuller /7/2012.
myDAQ Biomedical Instrumentation Board
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
Exhaust Emissions Analyzer Introduction In a day when global CO 2 levels are one of the greatest concerns of society, surprisingly few advances have been.
Wind Turbine Design and Implementation.. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Multidisciplinary Engineering Senior Design Automated Plasma Generator Test System Preliminary Design Review 11/11/05 Project Sponsor: MKS, ENI Incorporated.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Habitat for Humanity Final Presentation May 3, 2002.
Characterization of Optical Devices Using Magnitude and Group Delay Measurement Haiqiao Lin, Undergraduate Student Dr. Christi Madsen, Professor Department.
Diffusion Furnace Controller Design Team 14 Joe Grady James Crow Hongyu Chen Prakalp Sudhakar Victor Villagomez Client/Faculty Advisor: Dr. Gary Tuttle.
SD Dec Team Members Client / Advisor Acknowledgements Victor Villagomez Cpr E Joe Grady E E Dr. Gary Tuttle Leland Harker Prakalp Sudhakar E E James.
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
Abstract In 2008 President Geoffrey introduced the Live green program which called for environmentally conscious living. In light of this initiative, it.
Automated Feeding Solutions for Dog Owners Preliminary Design Review October 19, 2007 Project Automated Dog Feeder Project Advisor Dr. Hongwei Wu The Canine.
P13071 – Non-Invasive Blood Glucose Monitor Team Members Jared Bold Yongjie Cao John Louma Andrew Rosen Dan Sinkiewicz Faculty Advisor Professor George.
Stand-Alone and Mesh Networks of Dissolved Oxygen (DO) Monitors Sd-May11-20 Betty Nguyen Scott Mertz David Hansen Ashley Polkinghorn Advisors Joseph Shinar.
Ground Station for Satellite Operation (CySat) May Client: Matthew Nelson Advisor: John Basart Team: Karl Deakyne, SungHo Yoon, Luke Olson Cyclone.
Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
1 Business Development (Service). What is DTH How DTH works How DTH works Type of DTH Connections Type of DTH Connections Advantages of DTH Advantages.
General Engineering Polytechnic University Laboratory 9: Electrical Filters.
Department of Electrical and Computer Engineering Lighting Tool Box Winter 2004 ECE 498 Team Members: Nick Sitarski Blaine Thompson Brandon Harris Dave.
May Team Information Client Department of Electrical and Computer Engineering, Iowa State University Faculty Advisor Professor Gary Tuttle Team Members.
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 4 1 Chapter 4: Basics of Preventive Maintenance and Troubleshooting IT.
U-SAFE Insurance Company–Sale and Recordkeeping of Insurance Policies.
SSOL: Radio Telescope Industrial Review Panel Presentation Team Ongo-02c December 7 th, 2005 Client: Iowa Space Grant Consortium Advisor: Dr. Basart.
MSP430 Group Project ECE 300 Spring 2007 Dr. Walter Green Jeffrey Logsdon John Ly Daniel Henderson Nataly Sumarriva.
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
DEC RADIO TELESCOPE Dane Coffey, Charles Wakefield, Stephanie Kaufman, Seung Hyun Song.
Educational Laboratory Virtual Instrumentation Suite (ELVIS) May Client: National Instruments Advisors: Dr. Mani Mina, Dr. Diane Rover Group Members:
Mixed-Signal Option for the Teradyne Integra J750 Test System May08-12 Emily Evers Vincent Tai.
Lab Group L2Bx EECE 380 – Electrical Engineering Design Studio (Spring 2014) 1 Spectrum Analyzer Michael Halpenny-Mason, Presenter 2, Presenter 3, Presenter.
ASHOR CHIRACKAL MICHELLE TAN IMRAN BUTT LUKE LEHMAN CLIENT: MR. JOSH UNDERWOOD, ASC ADVISOR: DR. TIM BIGELOW ISU SODAR Team sddec
SSOL: Radio Telescope IRP Presentation Team Ongo-02c April 26, 2006 Client: Iowa Space Grant Consortium Advisor: Dr. Basart.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
Abstract The purpose of this project is to create a fully functional 8.5 meter radio telescope which can receive signals at a frequency of 1.42 GHz. The.
SSOL: Radio Telescope IRP Presentation Team Ongo-02c December 6, 2006 Client: Iowa Space Grant Consortium Advisor: Dr. Basart.
Systems Analysis and Design in a Changing World, Fourth Edition
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Wind Turbine Project Plan (Dec08-04) ‏ Lindsay Short Nick Ries Luke Donney Dario Vazquez Chris Loots Advisor: Dr. Ajjarapu Client: Dr. Aliprantis.
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Embedded Design Using ARM For Strong Room Security System
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Abstract The goal of our project is the continued restoration of the 8.5 meter dish at the Fick observatory in Boone, IA. Before restoration began, the.
Note: This brochure is designed to be printed. You should test print on regular paper to ensure proper positioning before printing on card stock. You may.
Electronic. Analog Vs. Digital Analog –Continuous –Can take on any values in a given range –Very susceptible to noise Digital –Discrete –Can only take.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
Angle of Incidence Detection Team Members: Chris Bridges and Gary Porres Project Adviser: Dr. Kent A. Chamberlin.
May08-21 Model-Based Software Development Kevin Korslund Daniel De Graaf Cory Kleinheksel Benjamin Miller Client – Rockwell Collins Faculty Advisor – Dr.
第 11 組 MIS 報告. Phases of any information system ~ recognition of a business problem or opportunity ~ recognition of a business problem or opportunity.
Introduction ProjectRequirements Project Requirements In a previous senior design project, a wireless front-end was added to Iowa State University’s Teradyne.
Plasma Sense Amplifier
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Solar Patio Umbrella Final Presentation May 3 rd, 2016 Team #37 ECE 445 – Spring 2016.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Inertial Measurement Unit. Project Advisor: Dr. Basart Client: Matt Nelson Team Members (491): Matt Ulrich Luis Garcia Amardeep Jawandha Julian Currie.
VEX IQ Curriculum Smart Machines Lesson 09 Lesson Materials:
How SCADA Systems Work?.
Planetarium Resuscitation Ongo-06 May 1, 2002
Circuit Analysis and Troubleshooting
Planetarium Resuscitation Ongo-06 February 14th, 2002
Presentation transcript:

Ongo 2-C Radio Telescope Greg Bonett Laura Janvrin Project Advisor: John Basart Ali Abdelsalam Osman Abdelsalam

Project Goal Develop a working radio telescope for Iowa State, thus increasing research opportunities for students and faculty on campus, especially in the Physics and Astronomy Department

Concept Sketch (carries radio signal)

System Block Diagram

Start of Year Status Wiring issues on tower prevented operation of coaxial switch, noise source, and inhibited data collection Limit Switch Relay board was not functioning properly, which prevented movement of the dish Positioning software did not include tracking over time, and raster scan was inefficient No documentation existed for limit switch relay board or terminal blocks within interface box

Deliverables New Interface Box with permanent PCBs capable of reliable operation without frequent maintenance Functional Tracking and Raster Scan software Functioning positioning feedback, basic calibration routines, basic positioning correction Limit Switch circuitry to stop motors when limits are reached Complete, useful documentation

Operating Environment Ambient temperatures range from -20ºF – 110ºF Strong wind, snow, ice, and rain Vulnerable to lightning

Project Risks Dish hardware is custom built for our observatory, and cannot be replaced if broken. Outdoor hardware can withstand temperature extremes, but there is a potential for ice buildup to prevent telescope operation. Much of the existing hardware is old and prone to breaking down, much of the wiring is unreliable. As this project has moved to a phased approach, critical information about the system could be lost if the new group and the returning group do not work together.

Risk Management Maintenance must be performed each semester to make sure all of the telescope hardware is working. Outdoor work on the telescope was all performed when the weather allowed. The team has been replacing old cables and resealing weatherproof boxes to ensure reliability of equipment. In both the fall and spring, returning members worked with new members to help share knowledge of the entire system.

System Components

Positioning Specifications Reported dish position shall be accurate to within 0.1 degrees for both azimuth and elevation. Azimuth and Elevation calibration shall be performed automatically or through a very simple (one or two step) process. Continuous position updating shall allow tracking of objects and performing raster scans.

Positioning This semester, the team focused on characterizing the positioning capabilities of the telescope and began calibrating the positioning. Preliminary characterization and calibration was accomplished by aiming the dish at sun and comparing positioning feedback to the known coordinates of the sun.

Interface Box Specifications Interface Box shall be properly labelled to allow ease of troubleshooting and maintenance. Interface Box shall allow connection between the computer’s data acquisition card, and the receiver, limit switch circuit, coaxial switch actuation, and motor control box. Interface Box circuitry shall be solid state components mounted on a printed circuit board. Interface Box documentation shall include schematics for all circuits, as well as details for all wiring connections.

Interface Box – Limit Switch Circuitry In the fall, a PCB layout was designed based on the current limit switch relay board, but re-examination this semester revealed missing connections. A much simpler circuit was designed and tested that performs the required functions. The new circuit was created using a PCB, which will improve reliability of the limit switch circuitry.

Interface Box – Positioning Circuit Positioning circuit includes new Limit Switch circuit as well as a voltage divider circuit for positioning feedback

Interface Box – Positioning PCB Layout

Interface Box – Power Relay An existing power relay circuit was modified and installed into the interface box, and software was modified to allow the relay to be tripped remotely. With the relay installed, all components of the interface box can be controlled using a Remote Desktop connection.

Interface Box – Voltage Regulator PCB Voltage Regulator circuit maintains a constant voltage in the Interface Box

Interface Box – Coax Switch Relay PCB Coax Switch Relay circuit grounds the antenna when the switch is activated via software or physically. It also powers the LNA, mixer, and noise source, and can switch on the receiver.

Interface Box – New Box Old Interface Box The new rack-mounted box will be neat and organized. PCB boards will replace existing boards. Ribbon cables and new connectors will be used to make the box reliable New Interface Box

Software Specifications Software shall support all system, component, and user interface specifications. Software must possess an efficient raster scan function. Software must be able to track celestial objects over time. Software shall be organized according to semester and frequently backed up to prevent loss of work. Software documentation shall allow future team members to pick up where previous team left off.

Software – Raster Scan Old Raster Scan software in LabVIEW was modified to eliminate unnecessary and time-consuming motion of the telescope dish.

Software – Raster Scan User Interface

Software – Software Limits for Dish Movement Only allow opposite voltage to pass to Motor Control Box when dish is 2 degrees from each physical limit

Software - Wiki To facilitate the passing of knowledge from semester to semester, the team has implemented a Wiki. Existing documentation was uploaded to the Wiki and indexed on the Wiki. This will also allow team members to search through all the documentation contained on the Wiki for needed information. The wiki can be accessed at: www.sscl.iastate.edu/wiki/

Complete System Specifications System shall be operable remotely. Software shall be comprehensible to astronomy students. System equipment shall not require maintenance more than twice per semester.

System Maintenance In the fall, the team replaced faulty cable and conduit going up to the dish. A weather-proof seal was added to the feedhorn cap to prevent water from leaking in. Feedhorn was checked in the spring for water.

Testing Areas RF Section – All components relating to radio signals (feedhorn, amplifier, mixer, coaxial line) Positioning Hardware – Detection equipment and motors Positioning Software – Software programs used to position the dish for data acquisition Interface Hardware – All circuitry used to connect the computer to the other system components

Testing Objectives Confirm basic operation of all components Individual electrical components RF Section Positioning hardware Positioning software Interface hardware Quantify system parameters Measure RF losses Determine positioning accuracy

Testing – RF Section Individual RF components in the front-end box (mixer, LNA, noise source) were tested using a signal generator and spectrum analyzer The entire signal path was tested using a signal generator at the observatory Noise Source off

Testing - RF Section Measured appropriate gain/loss through the entire system and through the front-end components

Testing – RF Section Component Gain/loss Low-noise amplifier 28 dB Converter 19 dB Noise source 10 dB

Testing - Positioning Hardware Confirmed dish will move to known degree limits Verified position detection hardware is accurate After calibration, software (without software limits in place) shows 0° for minimum elevation, 86.5° for maximum elevation, etc. Verified that position output is precise Positioning variation is less than 0.05 degree if dish is not moving

Testing - Positioning Software Confirmed software function by measuring DAQ output Verified functionality by running positioning software Input coordinates of known source (the sun) Positioning software with correction placed dish in proper position Verified tracking software functionality Verified raster scan software functionality by performing raster scan of area of sky including the sun

Testing – Intensity Graph Tested the intensity graphing capabilities of our system Performed a manual scan across the sun and recorded the intensity every 10 ms Amplitude of 385 corresponds to a solar flux value of 490000 Jansky

Testing - Interface Hardware Performed continuity checks to ensure components are properly connected Confirmed all software programs properly activate appropriate hardware relays Verified input and output voltages meet component specifications

Work Descriptions Green = Task Complete Yellow = Task In Progress

End of Semester Status We are testing the new Interface Box. All three new PCBs in the Interface Box have been installed. Raster Scan and Tracking software have been tested. The RF system has been extensively tested and recommendations made for repairs. All relevant interface box circuitry and positioning circuitry has been documented and labelled.

Earned Value Analysis The old Interface box has been causing problems since its creation. The new box will reduce the amount of maintenance required. The preliminary positioning calibration done this semester will give future teams a basis for more precise calibration and correction. Documentation that has been created will improve future teams’ abilities to familiarize themselves with the project quickly and solve problems faster.

For the Next Team Now that the basic software is available and working, unified user interface software should be written to make the system more user-friendly. Pointing correction software can be written to further calibrate the positioning of the telescope. The impedance of the feed horn should be matched to the line. The raster scan software should be modified to do successive scans to reduce image noise.

Lessons Learned Conscious effort needs to be made to stay on schedule. Proper documentation saves time and work in the long run. It is impossible to plan all tasks at the beginning and work through them – problems will always arise and require adjustments and new planning.

Conclusions The new Interface Box will be a great benefit to future teams in terms of reliability and ease of understanding. The intensity of the sun has been successfully measured, and all components of the RF system have been characterized. All of the software needed to run the telescope is complete, but improvements can still be made in terms of making one unified program. At the end of this semester, the radio telescope system will be operational for future teams to add additional astronomy features.

Acknowledgements Dr. John Basart for work as advisor Dr. Gregory Smith for feedback and providing funds for parts Matt Nelson for help with PCB ordering Jesse Griggs and Matt Clausman for Eagle software training Ryan Cragg for help with making a lid for the Motor Control Box