H. MatisTracking Upgrade Review – Dec. 7, 20061 SSD Update Howard Matis.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Test of the SSD Electronics for the STAR HFT Upgrade Howard Matis - LBNL 1SLAC ESTB Workshop – March 2011.
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Topological D-meson Reconstruction with STAR Using the Silicon Vertex Tracker (SVT) Sarah LaPointe Wayne State University SVT review, BNL, July 7 th /8.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
1 Jim Thomas - LBL STAR Inner Tracking Upgrades with an emphasis on the Heavy Flavor Tracker presented by Jim Thomas Lawrence Berkeley Laboratory 11 /
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
STAR RHIC AGS users meeting, May 30, Star Inner Tracking upgrade F. Videbaek STAR collaboration for the HFT upgrade group.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
Y.Fisyak, BNL - STAR Upgrade workshop, 12/2/ Integrated Tracker – STAR tracking framework of the future update on  status and  perspective IT(TF)
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
STAR Operations Workshop 2007 H. Matis1 SSD Operations August 20, 2007 H. Matis for the SSD group.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
G. Contin | The STAR Heavy Flavor Tracker (HFT) and Upgrade Plan Quark Matter 2015 – Kobe, Japan Session : Future Experimental Facilities,
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
The Jülich Digital Readout System for PANDA Developments
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Software Overview S. Margetis Kent State University HFT CD0 Review.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
The Silicon Track Trigger (STT) at DØ
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
SVT detector electronics
Presentation transcript:

H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis

H. MatisTracking Upgrade Review – Dec. 7, Outline  What is the SSD?  Why we need it?  Some tracking results  Current Status  How to upgrade?  Manpower needed to run the detector at its potential  What is the SSD?  Why we need it?  Some tracking results  Current Status  How to upgrade?  Manpower needed to run the detector at its potential

H. MatisTracking Upgrade Review – Dec. 7, The SSD is a Beautiful Detector  The SSD is thin  1% radiation length - double sided Si  The SSD lies at an ideal radius  23 cm - midway between IP and IFC  The SSD has excellent resolution  The SSD is too large to be replaced  The money is better spent elsewhere  The SSD is thin  1% radiation length - double sided Si  The SSD lies at an ideal radius  23 cm - midway between IP and IFC  The SSD has excellent resolution  The SSD is too large to be replaced  The money is better spent elsewhere

H. MatisTracking Upgrade Review – Dec. 7, ~ 60 cm  95  m  4.2 cm strips  300  m thick  Double sided  Crossed at 35 mrad  20 ladders  67 cm long  Air cooled   < 1.2  95  m  4.2 cm strips  300  m thick  Double sided  Crossed at 35 mrad  20 ladders  67 cm long  Air cooled   < 1.2 Two Layers of Tracking

H. MatisTracking Upgrade Review – Dec. 7, Inside the IFC ~ 1 m   xy = 30 µm   z = 700 µm  TPC pointing resolution at the SSD is ~ 1 mm  SSD pointing at the IST is ~ 300  m   xy = 30 µm   z = 700 µm  TPC pointing resolution at the SSD is ~ 1 mm  SSD pointing at the IST is ~ 300  m SSD Facilitates Tracking from the TPC to IST

H. MatisTracking Upgrade Review – Dec. 7, SSD has been used in STAR analysis  Needed for SVT tracking  SSD is essential for SVT analysis  Needed for SVT tracking  SSD is essential for SVT analysis

H. MatisTracking Upgrade Review – Dec. 7, Improves the Impact Parameter Measurement analysis by Jonathan Bouchet cm

H. MatisTracking Upgrade Review – Dec. 7, Resolution here includes vertex and hit resolutions. Real values 20% smaller. Huge difference in pointing between SVT and everything else At infinite momentum limit is ~150 µm in XY and 80 µm in Z (~vertex resolution) At 1 GeV/c, it is 220 µm in xy and 150 µm in z z is our good (not shifting) coordinate! MISSION ACCOMPLISHED TPC +SSD +SVT 1,2,3 Data - Cu + Cu 62 GeV – Impact Parameter 1/p

H. MatisTracking Upgrade Review – Dec. 7, Situation for Upcoming Run  Ran detector on Tuesday  System ran and stable  Obtained pedestals and noise  70% of the detector good for physics - NOW  Should be able to recover rest to 95%  L2 aborts acceptable for rate <30 Hz  SSD not useful for p-p running  Jerome Baudot will visit BNL and instruct new people early next year  Need beam and full detector  Manpower?  Ran detector on Tuesday  System ran and stable  Obtained pedestals and noise  70% of the detector good for physics - NOW  Should be able to recover rest to 95%  L2 aborts acceptable for rate <30 Hz  SSD not useful for p-p running  Jerome Baudot will visit BNL and instruct new people early next year  Need beam and full detector  Manpower?

H. MatisTracking Upgrade Review – Dec. 7, PedestalNoise Ladders

H. MatisTracking Upgrade Review – Dec. 7, PedestalNoise Ladders

H. MatisTracking Upgrade Review – Dec. 7, Maintenance Needed Next Summer Shutdown  Solve the problem with one of the LV power supply boards (ladder 5)  Check all cooling pipes. Understand HV trips (cooling problem?)  Solved if SVT removed  One ladder side (7P) is silent  Fix ADC Board  Might need to replace ladder  Check optical fibers  Need specialized equipment. At BNL?  Fix L2 abort problem  Need 1 month of a SSD Engineer and Tonko  Solve the problem with one of the LV power supply boards (ladder 5)  Check all cooling pipes. Understand HV trips (cooling problem?)  Solved if SVT removed  One ladder side (7P) is silent  Fix ADC Board  Might need to replace ladder  Check optical fibers  Need specialized equipment. At BNL?  Fix L2 abort problem  Need 1 month of a SSD Engineer and Tonko

H. MatisTracking Upgrade Review – Dec. 7, SSD Electronics and the Future Module level strips per side ( P and N side ) - Analog signal of 1.5  s - 50 mV/MIP - Readout speed : 3 MHz Ladder level - 2 Connexion boards ( 1 per side ) - 2 ADC boards ( 1 per side ) SSD level - 4 Readout Boards (RB) located on the TPC wheels - Each RB interfaces 10 ladders with trigger / daq / slowcontrol - Readout speed : 30 MHz

H. MatisTracking Upgrade Review – Dec. 7, Current Readout Speed  Front end Digitization  FEE runs at 3 MHz  96 chips/ladder side with 128 channels/chip  4.1 ms to digitize a ladder side  Transfer to DAQ via RDO  Readout at 30 MHz  1 RDO/10 ladder sides  4.1 ms for readout  3 ms for 0’s to match TPC DAQ format  7 ms total  Front end Digitization  FEE runs at 3 MHz  96 chips/ladder side with 128 channels/chip  4.1 ms to digitize a ladder side  Transfer to DAQ via RDO  Readout at 30 MHz  1 RDO/10 ladder sides  4.1 ms for readout  3 ms for 0’s to match TPC DAQ format  7 ms total RDO Board

H. MatisTracking Upgrade Review – Dec. 7, How to Upgrade for DAQ1000  For 1.2 ms readout time  Digitize at 10 MHz  Have a RDO for 3 ladder sides -  3  No zeros to fill the ASICS –  2  Opportunity to upgrade firmware  Solve L2 abort problem  Estimated cost (mostly to produce new RDOs ) : ~100 k$  Must verify power distribution and cooling  Need to test concept  To go faster  Add more ADCs on a ladder  Increase # of RDOs  Maximum readout speed at FEE level – 10 MHz  For 1.2 ms readout time  Digitize at 10 MHz  Have a RDO for 3 ladder sides -  3  No zeros to fill the ASICS –  2  Opportunity to upgrade firmware  Solve L2 abort problem  Estimated cost (mostly to produce new RDOs ) : ~100 k$  Must verify power distribution and cooling  Need to test concept  To go faster  Add more ADCs on a ladder  Increase # of RDOs  Maximum readout speed at FEE level – 10 MHz

H. MatisTracking Upgrade Review – Dec. 7, Lessons Learned from STAR Operations  Detector must be tested with full system before each run at BNL  Experts must be available to assist ASAP  Come to BNL if necessary  Train shift crews  Testing slots are limited  Schedule access is not fixed  “Scheduled” accesses should stick to the schedule  SSD must have a “mother” at BNL making sure detector is being used  Detector must be tested with full system before each run at BNL  Experts must be available to assist ASAP  Come to BNL if necessary  Train shift crews  Testing slots are limited  Schedule access is not fixed  “Scheduled” accesses should stick to the schedule  SSD must have a “mother” at BNL making sure detector is being used

H. MatisTracking Upgrade Review – Dec. 7, Need a team to succeed  Physicists  Subsystem leader (1/4 time)  Software coordinator (1/2 time)  Calibration and detector expert (1/2 time BNL)  Subsystem Expert (need at least 1/4 time)  Slow controls (1/8 time)  Advice from present experts  People who want to use it for physics  Engineers  French Support (need shops and some travel to BNL)  Mechanical and electrical tech support (several weeks during shutdowns)  Electrical Engineer (when problems occur)  Physicists  Subsystem leader (1/4 time)  Software coordinator (1/2 time)  Calibration and detector expert (1/2 time BNL)  Subsystem Expert (need at least 1/4 time)  Slow controls (1/8 time)  Advice from present experts  People who want to use it for physics  Engineers  French Support (need shops and some travel to BNL)  Mechanical and electrical tech support (several weeks during shutdowns)  Electrical Engineer (when problems occur)

H. MatisTracking Upgrade Review – Dec. 7, Runtime hardware support  Requires less effort than the TPC or EMC  Needs person at BNL watching SSD  Advocating and assuring for its inclusion in the run  Basic knowledge of system  Answer simple questions from shift crews  At least two people who can provide  Backup  Advise  Help in access (need fixed access times from RHIC)  Real expert who can consult  FPGA Programming support  Should only need this help during shutdowns  Requires less effort than the TPC or EMC  Needs person at BNL watching SSD  Advocating and assuring for its inclusion in the run  Basic knowledge of system  Answer simple questions from shift crews  At least two people who can provide  Backup  Advise  Help in access (need fixed access times from RHIC)  Real expert who can consult  FPGA Programming support  Should only need this help during shutdowns

H. MatisTracking Upgrade Review – Dec. 7, Shutdown hardware support  Fix known problems  Tend to routine maintenance  Assist if changes needed to SVT cone area  Routine work on infrastructure  People  Team of physicists to work on the detector  Electrical and hardware techs to do infrastructure maintenance  Fix known problems  Tend to routine maintenance  Assist if changes needed to SVT cone area  Routine work on infrastructure  People  Team of physicists to work on the detector  Electrical and hardware techs to do infrastructure maintenance

H. MatisTracking Upgrade Review – Dec. 7, Software support  One person doing daily calibration and checks of the performance  Jerome Lauret requires a software detector leader  responsible for making sure SSD is ready when production starts  People who need SSD for their physics analysis  One person doing daily calibration and checks of the performance  Jerome Lauret requires a software detector leader  responsible for making sure SSD is ready when production starts  People who need SSD for their physics analysis

H. MatisTracking Upgrade Review – Dec. 7,

H. MatisTracking Upgrade Review – Dec. 7,

H. MatisTracking Upgrade Review – Dec. 7, Summary  SSD provides valuable tracking for current detector and the Inner Tracker  “Low” maintenance calibration  Should be supported by STAR  Can be maintained  Should work for this Au-Au run  STAR must provide sufficient manpower for the SSD to succeed  SSD provides valuable tracking for current detector and the Inner Tracker  “Low” maintenance calibration  Should be supported by STAR  Can be maintained  Should work for this Au-Au run  STAR must provide sufficient manpower for the SSD to succeed