Joe Baca, Travis Cano, Ray Pasco, A.J. Quartararo ACME WIDGETS.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

Systems Investigation and Analysis
Preparing the System Proposal Chapter 13 Topics: –Systems proposal –Determining hardware needs –Determining software needs –Decision to rent, lease, or.
7 Chapter 7 The University Lab: Conceptual Design Database Systems: Design, Implementation, and Management, Fifth Edition, Rob and Coronel.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Network Design and Implementation
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
© Prentice Hall CHAPTER 9 Application Development by Information Systems Professionals.
Statistical Metadata Strategy Elham M. Saleh - Acting Director of Economic Statistics - Director of Technical Resources Central Informatics Organisation.
Managing the Information Technology Resource Jerry N. Luftman
Systems Development I—Overview Ken PeffersUNLVMarch 2004.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
SDLC. Information Systems Development Terms SDLC - the development method used by most organizations today for large, complex systems Systems Analysts.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 16-1 Accounting Information Systems 9 th Edition Marshall.
The Agile vs. Waterfall Methodologies Systems Development:  the activity of creating new or modifying / enhancing existing business systems.  Objectives.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Introduction to Computer Technology
IT CAREERS Prepared by: Careene McCallum-Rodney. Computer Technician  Computer technicians:  install,  repair,  maintain,  and analyze many different.
What is A-Tracker A-Track is a Palm OS application that allows a company to track its equipment - office equipment, computers, vehicles, automobiles, library,
SYSTEM ANALYSIS AND DESIGN
Organizing Information Technology Resources
Computers & Employment By Andrew Attard and Stephen Calleja.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Pertemuan 5 Pengembangan Teknologi Informasi Matakuliah: H0402/PENGELOLAAN SISTEM KOMPUTER Tahun: 2005 Versi: 1/0.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
5.1 Basics of Office Automation
Project Feasibility Presentation Helping People Be Healthy!
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
Bayu Priyambadha, S.Kom Teknik Informatika Universitas Brawijaya.
CS 425/625 Software Engineering Legacy Systems
Chapter 14 Information System Development
Team Members David Haas Yun Tang Robert Njoroge Tom Kerwin Clients Facilities Management Don Anderson Rick Klein.
Computers Are Your Future © 2006 Prentice Hall, Inc.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Operating Systems JEOPARDY Computer Repair NetworkOS OS Tasks ConceptsComponentsMisc
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Advanced Higher Computing SOFTWARE DEVELOPMENT PROCESS.
Bayou Corporate Airways Project Identification Presented By: Manan Mehra Gerson Morales Mayuri Sriram.
El-Omari, Samir Hartline, Chris M. Hau, Jenny H. Huynh, Nhi T. Johnson, Rodger D. Kwan, Winnie W.
Systems Analysis and Design
Computers Are Your Future © 2008 Prentice Hall, Inc.
Systems Analysis and Design in a Changing World, Fourth Edition
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Database Systems. Role and Advantages of the DBMS Improved data sharing Improved data security Better data integration Minimized data inconsistency Improved.
Company small business cloud solution Client UNIVERSITY OF BEDFORDSHIRE.
CISB113 Fundamentals of Information Systems IS Development.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
IS2210: Systems Analysis and Systems Design and Change Twitter:
State of Georgia Release Management Training
Database Systems: Design, Implementation, and Management Eighth Edition Chapter 1 Database Systems.
Expense Assignment System Version IV, release 3.1 Presented by Audrey Heil, RITPO.
BSA 385 Week 3 Individual Assignment Frequent Shopper Program Part 2 Check this A+ tutorial guideline at
Information Systems Development
Principles of Information Systems Eighth Edition
IS Development Methodology
Information Systems Development
Computer Jobs Data Entry Operators Computer Librarians
System Design, Implementation and Review
Information Systems Development
Implementation of Computer Maintenance Management system - CMMS
Fundamentals of Information Systems, Sixth Edition
Fundamentals of Information Systems, Sixth Edition
Introduction to Projects
(System Development Life Cycle)
The Software Development Process
Project Name Here Kick-off Date
Presentation transcript:

Joe Baca, Travis Cano, Ray Pasco, A.J. Quartararo ACME WIDGETS

AGENDA Background Information Problem Definition Current System Definition Project Feasibility Assessment Project Plan Recommendations ERD Diagram System Output User Interface Appendix

BACKGROUND INFORMATION Tracking hardware/software assets Collect and manage information Computers, Printers, and Software Initial method not multiuser and scalable $100,000 budget for a six month project Covers the cost of labor, new hardware/software, and training

PROBLEM DEFINITION MS Excel and Access Company has two locations now New system needs to be multiuser, scalable Minimizing Change in Work Assignments Union must approve Ensures greater acceptance Main issue lies with equipment used and process to maintain quality data A technical solution is necessary

CURRENT SYSTEM DEFINITION Software inventory tracked in MS Excel Hardware inventory tracked in MS Access The system operates on individual computers The files are shared among managers and technicians on a central server No way to track when a file is being modified

PIECES FRAMEWORK Performance – Files located on a server where managers can update them, as long as someone else is not doing so. Makes difficult to coordinate between two sites Information – Asset information stored in two different file types. Hard to combine reports Economics – Budget is $100,000 Control – Managers can update files, but must assume that no one else is trying to do the same Efficiency – Two different file types diminishes efficiency of information and generating reports. Collaboration is difficult on current system Service – Current system can lead to inconsistencies in data as managers at multiple sites update files located on a central server

FISHBONE DIAGRAM

PROJECT FEASIBILITY ASSESSMENT Operational – Proposed solution satisfies the system requirements Cultural/Political – Obtaining input from managers both willing and unwilling to change Technical – New system is technically feasible Schedule – Six month timeline is adequate. If need arises, this could be pushed back Economic – Expected cost is $86,500. This allows for about $13,500 of cost overrun. Legal – Union approval is possible with the proper channels. Minimal impact to work assignments will aid in this process.

PROJECT FEASIBILITY ASSESSMENT Development Costs Personnel: 2Systems Analysts ($50.00/hour)$30,000 2Programmer/Analysts ($35.00/hour ea)$19,000 1GUI Designer ($40.00/hour)$5,000 1Telecommuncations ($50.00/hour)$2,500 1System Architect ($50.00/hour)$6,000 1Database Specialist ($45.00/hour)$500 1System Librarian ($15.00/hour)$2,000 Expenses: Training$3,500 New Hardware & Software 1Development Server$10,000 1Server Software (operating system, etc)$3,000 1DBMS Server Software$2,000 Client Software$3,000 Total Development Costs $86,500 Projected Annual Operating Costs Personnel: 2Programmer/Analysts ($35.00/hr)$40,000 1System Librarian$6,000 Expenses: 1Maintenance for server$1,000 1Maintenance for DBMS Software$1,000 Total Projected Annual Costs$48,000

PROJECT PLAN Design the interface using an in-house database Allow access via a website that allows multiple users and continuously updates, and allows simultaneous updates Both locations will have the latest data

RECOMMENDATIONS Web based solution that will allow multi-user access Continuous update across locations Satisfy manager request to stay in house Iterate implementation and test at one location first Offer training in order to ensure proper system use

ERD DIAGRAM

SYSTEM OUTPUT

USER INTERFACE

APPENDIX

PIECES FRAMEWORK Performance – Files located on a server where managers can update them, as long as someone else is not doing so. Makes difficult to coordinate between two sites Information – Asset information stored in two different file types. Hard to combine reports Economics – Budget is $100,000 Control – Managers can update files, but must assume that no one else is trying to do the same Efficiency – Two different file types diminishes efficiency of information and generating reports. Collaboration is difficult on current system Service – Current system can lead to inconsistencies in data as managers at multiple sites update files located on a central server

FISHBONE DIAGRAM

PROJECT FEASIBILITY ASSESSMENT Development Costs Personnel: 2Systems Analysts ($50.00/hour)$30,000 2Programmer/Analysts ($35.00/hour ea)$19,000 1GUI Designer ($40.00/hour)$5,000 1Telecommuncations ($50.00/hour)$2,500 1System Architect ($50.00/hour)$6,000 1Database Specialist ($45.00/hour)$500 1System Librarian ($15.00/hour)$2,000 Expenses: Training$3,500 New Hardware & Software 1Development Server$10,000 1Server Software (operating system, etc)$3,000 1DBMS Server Software$2,000 Client Software$3,000 Total Development Costs $86,500 Projected Annual Operating Costs Personnel: 2Programmer/Analysts ($35.00/hr)$40,000 1System Librarian$6,000 Expenses: 1Maintenance for server$1,000 1Maintenance for DBMS Software$1,000 Total Projected Annual Costs$48,000

THANK YOU