September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

Managing the Health and Safety of Contractors
Contract CloseOut.
Build a Better Mousetrap: Quality Assurance and Call Specialist Performance Evaluation.
Job Loss Analysis Overview
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Building Tribal Capacity for a Workplace Safety Task Force John J. Schmitz REHS/RS Tucson Area Indian Health Service.
SODIUM CYANIDE SAFETY - SLIDE 1 OF 98 © Copyright SafetyInstruction.com 2006 WELCOME SODIUM CYANIDE SAFETY CORPORATE SAFETY TRAINING REGULATORY STANDARD.
OSHA Office of Training and Education 1 Hazard Communication.
Hazard identification and Risk assessment
How to Prepare for a FTCA Site Visit Office Hours
Penn State University Environmental Health and Safety Hazard Assessment and Personal Protective Equipment Training.
OSHA Office of Training and Education 1 Hazard Communication.
Utilizing Only Qualified Persons for Electrical Work can Reduce Risk Presented by: Dennis K. Neitzel, CPE Director Emeritus AVO Training Institute, Inc.
EMS Training, Awareness & Competence Norma Murphy
Implementation of Project Governance at the Center Level
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Risk Assessment – An Essential Standard
© Mahindra Satyam 2009 Project Metrics QMS Training.
Hazard Communication Training
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
Process Safety Management
OSHA Office of Training and Education 1 Hazard Communication.
HAZARD COMMUNICATION JANUARY 2010 Code 12/2010. Hazard Communication HAZARD COMMUNICATION.
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
NECA & Salisbury Assessment Solutions Partnership.
Company Confidential Registration Management Committee 1 Completing Independent Assessments Robert Flaharty & John Horan January 17, 2013 OP Assessor Workshop.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Hazard Communication. Introduction !About 32 million workers work with and are potentially exposed to one or more chemical hazards !There are approximately.
CONTRACTOR MANAGEMENT AT XSTRATA COAL. INDEX Location of sites Employees vs. Contractors Contractor selection phase Pre-engagement operational phase Engagement.
“Safety Self-Inspection of the Workplace – An Integral Element of Integrated Safety Management” Prepared by: M. E. “Rick” Du Bose Mgr, Safety & Occupational.
Penn State University Environmental Health and Safety Hazard Assessment and Personal Protective Equipment (PPE) Training.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
Job Safety Analysis.
ACETONE SAFETY - SLIDE 1 OF 95 © Copyright SafetyInstruction.com 2006 WELCOME ACETONE SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING REGULATORY STANDARD.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Stakeholders Communication and Barriers to Consultation
FINAL RULE 30 CFR PART 46 Training and Retraining of Miners Engaged in Shell Dredging or Employed at Sand, Gravel, Surface Stone, Surface Clay, Colloidal.
SULFURIC ACID SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING
Operational Awareness Program at ORNL DOE ISM Conference Feedback and Improvement Becky Webb August 27, 2009.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
OSHA Safety and Health Program Management Guidelines
Date and page number - 1 Safety Management at the NNSA Service Center (Albuquerque) Dennis Curtis Complex Support Department Occupational Safety and Health.
Project Specific Safe Work Plan Team Engagement Starts HERE!
OSHA Office of Training and Education 1 Hazard Communication.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Chicago Area Facilities (CAF) Electrical Safety Program.
Methods of Training Starter Create your own definition of training. Give an example of training you have undertaken in your life so far. Did you have a.
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Global Marketing © Chevron 2009 Rev. 1 Electrical Safety Awareness Plus.
Pipeline Safety Management Systems
Safety Committee Formation
IMS Implementation Project
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
SAF603S Switching of Electrical Equipment 6/23/2017 Revision 3.
FAA MMAC Electrical Safety Program Implementation & Culture Change
Personal Protective Equipment (PPE)
IS&T Project Reviews September 9, 2004.
Research and Test Reactor Decommissioning Inspections
Personal Protective Equipment (PPE)
Trending Requirements and Results
Personal Protective Equipment (PPE)
Personal Protective Equipment (PPE)
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation

Agenda  Welcome/Introductions  Assessment Objective  Results  Questions Agenda

Welcome & Introductions Team Members: Todd Kujawa, Team Lead [ ] Paul Powers, Electrical Engineer, FM [ ] Steve Neilson, Industrial Health & Safety, TJSO-DOE [ ] * DOE-Oak Ridge (unable to attend) Sign-in Sheet

Independent Assessment Objective Electrical Safety Program  The primary focus is geared toward compliance with the 10 CFR 851 standard.  Review of the over-site relationship towards safe electrical work practices for the lab’s service contractors.  Lab’s in-house staff work, planning, and control for electrical work. Lock, Tag and Try (LTT)  The primary objective is to identify any potential weaknesses in the procedure, in employee training, or in enforcement of the requirements.

Independent Assessment Results Typical Lines of Inquiry (Objectives/CRAD-LOI) Met (the specified criteria are substantially met) Partially met (some but not substantially all of the specified criteria are met) Not met Classification of Results  Findings (non-compliance with a requirement)  Observations/Opportunities For Improvement (deviation from best practice or minor deviation from procedural requirements that can be considered a ‘quick fix’)  Noteworthy Practices (positive aspects of a program) Recommendations (where appropriate) Team Follow Ups

Independent Assessment Results RESULTS SUMMARY FOR ELECTRICAL SAFETY:  (1) Finding  (5) Opportunities for Improvement  (2) Noteworthy Practice  (3) Recommendations  (2) Team Follow Ups

Independent Assessment Results  FINDINGS (MINOR NON-CONFORMANCE): 1.) BOAs continuing to operate while in a state of flux; deliverables to the contractual requirements (i.e. electrical safety program, LOTO program….) are not all on record with the contracting officer/SOTR.

Independent Assessment Results  OPPORTUNITIES FOR IMPROVEMENT: 1.) Some panelboard schedules are still misrepresented of actual circuit identification and circuit breaker sizing. (This is a repeat OFI from the 2013 LTT review). 2.) Improvement on Work, Planning & Control (WPC) in the task involving non-electrical workers; when their work is in close proximity to the exposed magnet terminals in the tunnel/halls. This OFI is to include equipment specific LTT training when required.

Independent Assessment Results  OPPORTUNITIES FOR IMPROVEMENT: 3.) Follow up on the temporary wiring discrepancies discovered during the field visit portion of the assessment. 4.) Follow up on the unprotected (open closures) electrical discrepancies discovered during the field visit portion of the assessment. 5.) Improvement on the oversight of electrical work, on service type contracts (BOA), by SOTRs not having adequate electrical training/knowledge.

Independent Assessment Results  NOTEWORTHY PRACTICES: 1.) SOTR monthly safety meeting is very informative and discusses current safety related incidents, lesson learned and OSHA related requirements. (this is considered a good training tool for SOTRs). 2.) The RF group uses a spreadsheet to track equipment specific trained LTT persons to play the role as a second person during off shift hours.

Independent Assessment Results  RECOMMENDATIONS: 1.) All panel schedules be updatedin FY14 with the newer style AutoCAD displays; during the annual panelboard maintenance check. 2.) The Electrical Safety Committee to revisit the changes, between the 2004 edition and 2012 edition of NFPA 70E, in electrical work ppe and make appropriate changes to the electrical safety program if deemed necessary. 3.) Track the work being done by Contracts, with the updating of the BOAs, in the lab’s issue management process (CATS).

Independent Assessment Results  ASSESSMENT TEAM FOLLOW UPS: 1.) To provide feedback to Sam Holben (and lab wide) on the availability of newly developed technology regarding ARC rated face shields. The concern brought up during the field observation portion of the assessment was that it was difficult to read the multi-meter display while donning the ARC rated face shield. 2.) Follow up with DC power on the measurement device (meter) to be used on the new 12GeV magnets since the voltage levels will exceed current handheld multimeter capabilities.

Post Assessment Schedule  Draft IA report to Quality Assurance (QAS) [Target 10/17]  Submit IA report for factual accuracy check [Target 10/18]  Reconcile comments and transmit final report to QAS [Target 11/11] Note: Dates may be extended due to some team members being away from the lab in the upcoming week (this will be worked through the QAS).

Independent Assessment Results

Questions???