2012 Instream Flow Study Agency Meeting on 2012 Draft Study Descriptions January 24, 2012 1.

Slides:



Advertisements
Similar presentations
UW Offsite Habitat and Fish Survival Effectiveness Monitoring Objective: Assist in developing and applying central guidance and criteria for improving.
Advertisements

Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
Information Needs for the Integrated F&W Program (ESA and Power Act) Jim Geiselman - BPA.
Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Middle Fork Project AQ 6 – Fish Passage Technical Study February 3, 2009.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Step 1: Valley Segment Classification Our first step will be to assign environmental parameters to stream valley segments using a series of GIS tools developed.
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Loxahatchee River Management Coordinating Council – January 30, 2012 Patti Gorman Science Supervisor, Applied Sciences.
HOOD RIVER TRIBUTARIES DRAFT AREA WEIGHTED SUITABILITY Presented by: Thomas Gast, Normandeau Associates Presented to: Hood River Water Planning Group Instream.
Watershed System Physical Properties Stream flow (cfs) Stream Channel Pattern Substrate Chemical Properties pH Dissolved Oxygen Temperature Nutrients Turbidity.
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting July 21, 2008.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Plenary Meeting January 6,
Influence of Geomorphic Complexity on Hyporheic Flow and Nutrient Processing Prepared by Dan Baker for CE 413.
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Lindsay Carr, Joey Kleiner, Kinsey Hoffman
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A First Assessment of U.S. In-Stream Hydrokinetic Energy Resources Since the.
FNR 402 – Forest Watershed Management
Watershed Assessment and River Restoration Strategies
Lower Saluda River Instream Flow Study TWC Study Team Workshop December 11, 2007.
US Army Corps of Engineers BUILDING STRONG ® 2012 Changes to Stream Mitigation Procedures and Guidelines Mike Moxey USACE, Mobile District IRT Chair May.
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
Klamath Coho Integrated Modeling Framework (IMF)
King County Normative Flow Project Parametrix, King County, Herrera, & Foster Wheeler Normative Flow Studies King County Department of Natural Resources.
Thomas R. Payne & Associates Update on Flood Storage Fish Study Presented by Paul Schlenger, Bob Montgomery, Jim Shannon June 15, 2011.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Middle Fork Project AQ 12 - Attachment A California Red-legged Frog Site Assessment March 10, 2008.
Suggested Guidelines for Geomorphic aspects of Anadromous Salmonid Habitat Restoration proposals G. Mathias Kondolf.
Understanding Instream Flow Incremental Methodology (IFIM) Joey Kleiner.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Inventory and Monitoring Terrestrial Fauna Inventory and Monitoring Terrestrial Fauna Linking Field Activities to Budget Processes.
PNAMP Habitat Status and Trends Monitoring Management Question: Are the Primary Habitat Factors Limiting the Status of the Salmon and Steelhead Populations.
Claytor Lake Debris Study. Hydro Environmental Services of Kleinschmidt Associates  Shoreline Management Plans (SMP)  Aquatic & Terrestrial Habitat.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Baird Claytor Hydroelectric Project Sedimentation Study.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O Don Pedro Project Relicensing.
Comparison of Benthic Invertebrate Communities Upstream and Downstream of Proposed Culvert Installations in Alabama Amy C. Gill USGS, Alabama Water Science.
October 28, 2015 Yuba River Development Project Slide 1 Licensee Response to Relicensing Participant Tunnel Closure Proposal Yuba County Water Agency Yuba.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Former Channel Habitats of the Sacramento River: Physical and Ecological Processes and Restoration Potential Presented by Ingrid C. Morken By G. M. Kondolf,
Aquatic Resources Work Group Meeting December 18, 2008.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Middle Fork Project Existing Resource Information Reports July 18, 2006.
Nehalem River Basin: Technical Assistance for Watershed Data Synthesis, Restoration, and Outreach Priorities 4/16/2008.
PCWA Study Plan Physical Habitat Characterization Study Plan –Geomorphology Study Plan –Riparian Habitat Mapping Study Plan –Aquatic Habitat Characterization.
Iowa Rivers Information System Inventory, Modeling, and Evaluation of Basin, In-Stream Habitat, and Fishery Resource Relationships Kevin Kane, Iowa State.
Middle Fork Project AQ 3 – Macroinvertebrate and Aquatic Mollusk Technical Study Report Overview May 5, 2008.
Middle Fork Project Relicensing Process Plan April 25, 2006.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
A Framework for Assessing Needs Across Multiple States, Stakeholders, and Topic Areas Stephanie Wilkerson & Mary Styers REL Appalachia American Evaluation.
Reservoir and Flow Routing Model Transect Data Collection Water Resources Study Planning Meeting January 25, 2012 Prepared by 1.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Habitat suitability and availability for rainbow trout Oncorhynchus mykiss in the Canyon Reservoir tailrace Greg Cummings.
December 14, 2011 California Natural Resources Agency Public Meeting.
Snohomish County Surface Water Management R2 Resource Consultants
“Low Flow” “Water is taken out of the stream for a variety of uses, such as irrigated agriculture, municipal and industrial. Low flow means that amount.
Middle Fork Project Overview of 2008 Technical Study Plan Implementation April 21, 2008.
TERMINOLOGY Macrohabitat – water quality and hydrology
Mississippi River Hydrodynamic and Delta Management Study
Study Update Tailrace Slough Use by Anadromous Salmonids
Streams Hydrodynamics
Decision support for watershed assessment, protection and restoration
Presentation transcript:

2012 Instream Flow Study Agency Meeting on 2012 Draft Study Descriptions January 24,

Susitna River Miles and Flow Distribution 2

3 Instream Flow Study Objectives A comprehensive instream flow study plan ( Instream Flow Study Plan) will be developed during 2012 as part of the Project licensing process. The Instream Flow Study will describe the response of aquatic habitats to Project-induced changes in river flow, water temperature, turbidity and other river channel/water quality parameters, as appropriate.

4 Provide information that will be a foundation for the Instream Flow Study and will assist in the development of the Instream Flow Study Plan. Synthesize the 1980s instream flow study information and evaluate the applicability of the studies to the current Project; Identify appropriate species/life history stages, study reaches, study sites, and instream flow modeling methods for the Instream Flow Study; and Coordinate instream flow study data needs across resource disciplines and studies. Develop the Instream Flow Study Plan Instream Flow Study Objectives

5 A ll aquatic habitats and riparian areas (related to river flow) in the Susitna River downstream of Watana Reservoir (RM 0 to RM 184) Above Devils Canyon (RM 150 to 184) Three Rivers to Devils Canyon (RM 98 to 152) Below Three Rivers (RM 0-98) Study Area

6 1980s Instream Flow Study Documents Target Species, Lifestages and/or Guilds Periodicity (seasonal timing) Observed Habitat Utilization by Target Species/lifestages/guilds Important Physical Habitat Processes River Stratification and Study Sites Habitat Suitability Criteria Habitat Modeling Water Temperature Modeling Instream Flow Study Plan Development Methods and Analysis

7 Identify the key 1980s instream flow study documents; Ensure documents are available in the ARLIS system digitally; and Index the key instream flow study elements within each document. 1980s Instream Flow Study Documents

8 Target Species, Lifestages and/or Guilds Review and synthesize the target species/lifestages/guilds analyzed in the 1980s instream flow studies and the rationale. Develop a preliminary selection and rationale for target species/lifestages/guilds by river segment. Identify how species/lifestages not selected or included in guilds would be addressed.

9 Identify and synthesize the periodicity for target species/lifestages used in the 1980s studies. Coordinate with the 2012 Synthesis of Existing Fish Population Data Study F-S1 ● Obtain fish timing and distribution information from the 1980s studies and from recent and concurrent ADF&G studies. Develop a target species/lifestage periodicity for each river segment and identify any important data gaps in the periodicity information. ● If a species/lifestage occurs in only a portion of the river segment, then identify the portion of the river segment. ● If the distribution is unknown, identify the data gap. Periodicity (seasonal timing)

10 Review and synthesize the macro, meso, and micro scale habitat utilization data collected (by species/lifestage) as part of the 1980s studies. Compare/contrast this information to the current state of knowledge regarding habitat utilization in similar river systems in Alaska. ● For example, review recent studies that have identified spawning habitats (turbidity, upwelling, etc.) and rearing habitats for target species/lifestages Coordinate with the 2012 Middle River Habitat Utilization Study F-S3. ● Ensure that the study methods and results provide appropriate habitat utilization data for the instream flow study. Habitat Utilization by Target Species/lifestages/guilds

11 Identify and synthesize the important physical habitat processes that were observed or anticipated to be Project and flow dependent in the 1980s studies. Develop recommendations for addressing and integrating these processes in the instream flow study. ● Upwelling and downwelling with respect to spawning and incubation and the relationship of upwelling rates to main channel discharge and/or ice cover elevation. ● Turbidity/suspended sediment with respect to clear water or turbid water habitats and the relationship of main channel discharge to the turbid/clear water habitats. Important Physical Habitat Processes

12 Develop recommendations for addressing and integrating these processes in the instream flow study (cont). ● Substrate quality for primary/secondary productivity and spawning and the relationship of substrate composition to the Project and Project flows. ● Ice and water temperature with respect to migration, holding, spawning incubation and rearing habitat and the relationship to reservoir operations and river discharge. Important Physical Habitat Processes

13 Identify and synthesize the stream segment or reach scale river stratification scheme used in the 1980s studies. ● Hydrology, channel geomorphology, channel slope, water temperature, ice cover, turbidity, riparian vegetation, etc. Identify and synthesize the sub-reach river stratification used ● Such as, riverine habitat types (main channel, side channel, sloughs, tributary mouths, and tributaries) and/or mesohabitat types (e.g., run, pool, riffle), if used. River Stratification and Study Sites

14 Locate and synthesize the 1980s study site locations and identify the overall approach used (or envisioned) to extrapolate the instream flow study site results to river segments and/or the entire Project area Evaluate the representativeness of the 1980s study sites with respect to: ● Pre-Project habitat that was usable by each target species/lifestage/guild; and ● Post-Project habitat that would become usable as a result of Project modifications to flow, temperature, turbidity and other parameters (substrate composition, channel structure, inundation frequency, etc.). River Stratification and Study Sites (cont.)

15 Coordinate with the 2012 Geomorphic Assessment of the Middle River Reach Using Aerial Photography Study G-S2 ● Mapping of geomorphic channel types (channel width, valley width, confinement, slope) and riverine habitat types (main channel, side slough, upland slough, tributary mouths, tributaries). ● River into segments/reaches ● Study Sites ● Channel dynamic equilibrium and stability of 1980s study sites River Stratification and Study Sites (cont.)

16 Coordinate with the 2012 Middle River Habitat Utilization Study F-S3 regarding the locations of habitat utilized by adult salmon. ● Ensure appropriate locations and descriptions of turbid and clear water habitats used by adult salmon are developed based on the 2012 field study, etc., to help evaluate instream flow study sites. River Stratification and Study Sites (cont.)

17 Preliminary study site selection ● Use 1980s studies, 2012 geomorphic studies/photography, and 2012 habitat utilization studies to initiate preliminary study site selection where appropriate data exists (e.g., Middle River below Devils Canyon). ● Conduct field visits, in September/October, to identify potential study sites and assess potential modeling approaches and logistics constraints. River Stratification and Study Sites (cont.)

18 Develop a preliminary approach(s) to determine: ● Segment/reach scale river stratification, ● Sub-reach habitat stratification, ● Study site selection, and ● Expansion of instream flow study site results to river segments and the Project area. River Stratification and Study Sites (cont.)

19 Synthesize the 1980s micro habitat (depth, velocity, substrate, cover) and meso/macro habitat suitability criteria (turbidity, upwelling flow, temperature). ● Consider its applicability to the current Project Compare the suitability criteria to empirical habitat utilization data and suitability criteria currently being used in applicable instream flow applications in Alaska and/or the Northwest USA/Canada. Habitat Suitability Criteria

20 Identify any important habitat suitability criteria data gaps that may require habitat suitability criteria data collection. For the purpose of facilitating discussions with stakeholders, develop a preliminary approach for selecting/developing habitat suitability criteria (micro, meso, and macro criteria). ● Coordinate with other studies regarding criteria for riparian vegetation and algae/macroinvertebrates (primary/secondary production habitat). Habitat Suitability Criteria (cont.)

21 Flow range(s) modeled ● Identify the range of flows that were modeled during the 1980s. ● Assess the adequacy of the modeled flow range for quantifying habitat under pre-Project and post-Project conditions. ● Develop recommendations for the flow range to be modeled in the Instream Flow Study. Habitat Modeling

22 Physical/biological habitat modeling approach that was utilized or envisioned if not completed in the 1980s studies. For example, identify and synthesize the following: ● Empirical surface area versus flow relationships approach for riverine habitat types (main channel, side channel, sloughs, tributary mouths). ● Usable habitat area analyses approach within the riverine habitat types (e.g., ADF&G PHABSIM studies). ● The approach for incorporating turbidity and upwelling into the analysis. ● The approach used for comparing pre-Project habitat with post-Project habitat Habitat Modeling (cont.)

23 Develop recommendations for: ● The Instream Flow Study regarding integration of habitat modeling including how various habitat modeling methods might be used most effectively to represent the habitat ● Empirical mapping of habitat over a range of flows ● 1-dimensional hydraulics and habitat modeling ● 2-dimensional hydrodynamics and habitat modeling ● And how the various physical and biological habitat process can be integrated and used to analyze existing and post- Project habitat Habitat Modeling (cont.)

24 Develop recommendations for: ● Incorporating hydrology (period of record, water year types) and habitat time series analysis in the Instream Flow Study. ● A temporal habitat modeling approach to address load following and or peaking operation in the Instream Flow Study. Habitat Modeling (cont.) Water Temperature Modeling Participate with AEA and licensing participants to develop the Water Temperature Modeling Study Plan.

25 Develop a formal study plan through consultation with AEA and the licensing participants that incorporates the synthesis of information described above Instream Flow Study Plan

26 Work Products Development of Final 2012 Study Plan Finalized through consultation with AEA, the resource agencies and other licensing participants. The AEA-selected environmental consultant will participate in the Working Group meetings as the technical lead and will prepare interim materials and revise the study plan accordingly.

27 Draft Technical Memoranda Draft technical memoranda will be prepared for each work group meeting. The topics for the draft memoranda will be developed in coordination with AEA and the licensing participants to meet the needs for developing the Instream Flow Study Plan. Preliminary memoranda topics are indicated below. In addition, each memo will summarize progress, identify data gaps, and indicate coordination efforts with other studies. Key Instream Flow Documents and Contents Target Species/Lifestages, Periodicity, and Observed Habitat Utilization Important Physical Habitat Processes, River Stratification, and Study Sites Habitat Suitability Criteria Habitat Modeling Preliminary Study Site Selection Work Products (cont.)

28 Relational Database A geospatially-referenced relational database of historic data used in the analysis and data collected during 2012 field season, if applicable, will be prepared. Instream Flow Study Plan The Instream Flow Study Plan will be developed through consultation during the Instream Flow Work Group Meetings under the formal FERC ILP study plan process. The AEA-selected environmental consultant will participate in the Work Group meetings as the technical lead and will prepare interim materials and revise the study plans accordingly Final 2012 Technical Memorandum A technical memo summarizing all of the 2012 results will be presented to resource agency personnel and other licensing participants, along with spatial data products. Work Products (cont.)

29 Final 2012 Study Plan – April 1, 2012 Draft Proposed Study Plan – April 27, 2012 Final Proposed Study Plan – June 15, 2012 Draft Revised Study Plan – August 15, 2012 Final Revised Study Plan – September 10, 2012 Original QC’d Data - November 9, 2012 QC’d Geospatially-referenced relational database – November 9, 2012 Final Technical Memorandum on 2012 Activity – November 9, 2012 Schedule

30 Comments/Discussion 2012 Instream Flow Study