Mitigation of Possible GPS Brownouts Professor Bradford Parkinson Chief Architect of GPS Original GPS Program Manager Stanford University Department of.

Slides:



Advertisements
Similar presentations
Defence Project Management 2007 Learning to love project risk management Dr Andrew Tyler DG Ships, DE&S.
Advertisements

DC Access System (DCAS)
Anatomy of 4GL Disaster CS524 - Software Engineering I Fall I, Sheldon X. Liang, Ph.D. Nathan Scheck CS524 - Software Engineering I Fall I, 2007.
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
Monitoring and Control
Introductory Comments. Selected Background Constellation (Currently ~29 on orbit) –Average Age on orbit about 9 years –IIF #1 not yet through Thermal.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
GAO Report on GPS “Significant Challenges in Sustaining and Upgrading Widely Used Capabilities” Presented on 30 April 2009 to Subcommittee on National.
Encouraging Adoption of Enterprise Applications Leadership Challenge Presentation December 3, 2010 Virginia Executive Institute 1.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
The Natick Soldier Center Matthew Hill | Bret Richmond Polina Segalova | David Yoshida Franklin W. Olin College of Engineering 3 November 2003.
STEPPING STONE PROJECT STEPPING STONE PROJECT designing a new engineering discipline presented by team 1.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
By Jim Halios.  Healthcare.gov  State of California payroll system  State of Pennsylvania unemployment compensation system.
1 Presentation to: Civil GPS Service Interface Committee (CGSIC) U.S. States and Localities Subcommittee (USSLS) U.S. Coast Guard Integrated Support Command.
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
U.S. Space-Based Positioning, Navigation, and Timing Policy and Program Update The Third Annual European Defence Geospatial Intelligence Conference (DGI.
Version 1.0– June 18, Leveraging the Texas Project Delivery Framework and.
ENC-GNSS 2006 – Manchester, UK Civil GPS Interface Committee International Sub-Committee May 7, 2006 John E. Augustine Acting Director, Office of Navigation.
Modernization and GPS III Southern California Section ION Meeting 11 March 2009 Lt Col David Goldstein, US Air Force Chief Engineer GPS Wing This briefing.
ERTMS state of the art and evolution of the applications considering customer’s orientations.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
University of Sunderland COM369 Unit 8 COM369 Project Monitoring and Control Unit 8.
“WHY AFFORDABILITY IS A SYSTEMS ENGINEERING METRIC” Quentin Redman Director – Solutions Architect PRICE Systems L.L.C.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
Protecting GPS Transportation Infrastructure – Action Plan Status Report 43rd CGSIC Meeting Washington, DC March 10, 2004  CDR Peter Keane U.S. Department.
COMPETITION REQUIREMENTS
A GENERIC PROCESS FOR REQUIREMENTS ENGINEERING Chapter 2 1 These slides are prepared by Enas Naffar to be used in Software requirements course - Philadelphia.
Boeing Space & Intelligence Systems Non-ITAR Data 1 GPS IIF Program Update National Space-Based PNT Advisory Board Presented by Mr. Ken Torok V.P. Navigation.
NDIA Small Business Division Subcommittee on Improving IP Protection for Small Businesses Mission Statement Overview Alison Brown.
University of Virginia Software Development Processes (CS340 John Knight 2005) 1 Software Development Processes.
FUTURE’S PANEL Presentation To National Space-Based PNT Advisory Board March 27, 2008 Washington, DC.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
QA Methodology By Rajib Roy Independent Consultant Qcon.
Inception Chapter 4 Applying UML and Patterns -Craig Larman.
U.S. Space-Based Positioning, Navigation, and Timing Programs and Policy Steve Sidorek Legislative Affairs Advisor September 17, 2009.
National Space-Based PNT Coordination Office Global Positioning System: A Policy and Modernization Review United Nations International Committee on GNSS.
For Official Use Only National Space-Based PNT Advisory Board Mr. Michael Shaw Director National Coordination Office 28 March 2007.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
GPS POLICY AND PLANNING Mr. Joe Canny US Department of Transportation Presented at IISC Meeting December, 1999.
Excerpt from SAE 550 Lecture Series: Systems Architecting and the Political Process What’s Next for Manned Space Programs? University of Southern California.
CS223: Software Engineering Lecture 4: Software Development Models.
Management of GPS as a Dual Use System Mr Robert Dickman Under Secretary of the Air Force Deputy for Military Space.
Presentation to Post Primary Review Working Group Development Proposals & Capital Allocation Process 14 August 2003.
Joint Report to Select Committee on Appropriations by Northern Cape Department of Health Northern Cape Department of Roads & Public Works supported by.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
December 13, G raphical A symmetric P rocessing Prototype Presentation December 13, 2004.
0 Due Diligence Monitoring and Auditing of Third Party Vendors October 28, 2008 Pharmaceutical Regulatory and Compliance Congress and Best Practices Forum.
CS-EE 481 Spring March, 2007 University of Portland School of Engineering Project ZigZag Team Adam Russell Will French Matt Heye Advisor Dr. Rylander.
CGSIC International Subcommittee Prague, Czech Republic March 14, 2005 Michael E. Shaw Director, Navigation and Spectrum Policy U.S. Department of Transportation.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
Aligning the connections and capacity processes 1 Mike Wassell Transmission workstream, January 2012.
DAU Hot Topics Forum February 15, 2017
Assembling A Space Mission
Design Process You already know the Scientific Method process. Today we are going to learn about the process engineers use when inventing new products.
DAU Hot Topics Forum February 15, 2017
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Mitigation of Possible GPS Brownouts
Royalty Accounting and Revenue Processing System (RAPS) Certification
Risk Analysis & Success Driven Project Management
Design Process You already know the Scientific Method process. Today we are going to learn about the process engineers use when inventing new products.
Cost Containment Working Group Board Update
Project Plan MS Project Example (Optional)
Presentation transcript:

Mitigation of Possible GPS Brownouts Professor Bradford Parkinson Chief Architect of GPS Original GPS Program Manager Stanford University Department of Aeronautics and Astronautics May 5, 20091Dr. Parkinson – Congressional Testimony

Background May 5, 20092Dr. Parkinson – Congressional Testimony GPS now has over 50 Million Civil Users and up to 100,000 DOD users – Vital to infrastructure – especially FAA’s NextGen – Essential to virtually every DOD Weapon System Current “Requirement” is for 24 sats, but level of service is 29 to 30 –Independent review teams repeatedly advocated requirement be raised to 30 Defense Science Board, GPS Independent Review Team, PNT Advisory Board say 30 European and Chinese competitors both set at 30 Sats

GPS Brownouts - Satellite numbers fall to less than current service Risk of Brownouts repeatedly pointed out by independent review teams – IIF Replacements greatly delayed Congenital Defects due to bad procurement practices imposed on the Developers in late 90s Design now quite old – many parts no longer available – IIIA now underway (finally) Delayed by DOD for at least 3 years Independent reviewers believe it is potentially a model procurement/development Main impediment is multilayered approval process above the Program Office May 5, 20093Dr. Parkinson – Congressional Testimony

GAO Report Omission 44 months Award-to-Launch Demonstrated by GPS I List of historic development times omitted the most significant one – GPS I (June 74 to Launch Feb 78) – Brand new design – no prototype Keys included: – Streamlined Approvals – Only one small change to contract – Integrated Product team – heavy USAF involvement at contractor – Top notch Blue suit engineers (Masters and PhD degrees) It can be done – goal was 36 months! May 5, 20094Dr. Parkinson – Congressional Testimony

GPS Constellation Size (Currently 31 sats – could be down to 24 or less in 2018) Constraints on Brown-out Mitigations – Only current GPS signals will help (Civ and Mil) User equipment for new signals will not be fielded – Brand New Foreign Satellite Developments of no help Options– in order of value 1.Use previously retired GPS satellites still available 2.Speed up GPS IIIA (expedite milestone approvals) 3. Develop a simplified GPS IIIA satellite (IIIS) in parallel with IIIA (no extra payloads) X. Restart /Extend IIF line (would be risky, expensive, and late) Desired: about 6 more Satellites by 2016 to help insure a constellation of 24 to 30 May 5, 20095Dr. Parkinson – Congressional Testimony

1. Reactivate Previously Retired GPS satellites still available (in operational orbits) Pros – USAF has already prepared for this (~5 sats available) – Procedures well established – low operational risk – More older satellites will probably qualify to do this – Option is virtually free Cons – Old satellites – will only give a few years each & will not completely resolve problem – Will not activate non-GPS functions May 5, 20096Dr. Parkinson – Congressional Testimony

2. Speed up GPS IIIA (expedite milestone approvals) Pros – Already on contract – Design underway and going well – Includes new International signal – Almost ten times more military power Cons – Speedup constrained by funding and budgeting process – Earlier DoD level management impediments Confusing chain of command Many can say no – no one can say yes Considerable unnecessary delay May 5, 20097Dr. Parkinson – Congressional Testimony

3. Develop simplified GPS IIIA satellite (IIIS) in parallel with IIIA (no extra payloads) Pros – All essential boxes already at PDR for IIIA – Has modernized signals and additional power – Also would need streamlined decision making – Could be dual launch – savings about $75M/ sat – Could be accommodated with current contract Cons – Additional Payloads not included – Not budgeted – Strain on contractor and Program Office May 5, 20098Dr. Parkinson – Congressional Testimony

X. Restart /Extend IIF line Pros – Already designed Cons – Design and Parts obsolete – must be redesigned – Still untried – may have further congenital defects – Lacks Powerful Military signal (Hostile Jammers have seven times more effective area with IIF signal than GPS IIIA) – Does not have new International Signal (L1C) – Probably would have to be recompeted (a “new” design) – Major near term budget hit – IIF is still overrunning May 5, 20099Dr. Parkinson – Congressional Testimony

Conclusions options can be done in parallel, where reasonable Option #1 (Reactivating retired satellites) should be continued and expanded where feasible Option #2 (speeding up IIIA schedule) should be encouraged and supported Option #3 (IIIA derived spartan satllite – IIIS) should be seriously explored and used if possible Option X is a non-start, IIF design is dead end – an old design against old requirements Above all, the senior decision chain has to become a part of the solution with appropriate urgency A risk mitigation plan is needed, using options 1, 2, and 3 May 5, Dr. Parkinson – Congressional Testimony