Managing A Migration Project Neil Phinney EMS Users Group June 7, 1999.

Slides:



Advertisements
Similar presentations
OC ORSTF Position WECC Board Meeting December 8, 2006.
Advertisements

COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
Preparing the System Proposal Chapter 13 Topics: –Systems proposal –Determining hardware needs –Determining software needs –Decision to rent, lease, or.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
PacifiCorp-CAISO EIM Initiative Overview
Network Design and Implementation
Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Shmuel Oren University of California, Berkeley Joint.
University of Southern California Enterprise Wide Information Systems Functionality and the Reference Model Instructor: Richard W. Vawter.
1 Chapter 12 Planning for Electronic Business: Resource and Implementation Issues.
Development plan and quality plan for your Project
Boston College Three Best Practice Models for for Student Service Delivery Student Service DeliveryEDUCAUSE October 3, 2002 Rita R. Owens Associate Academic.
Planning. SDLC Planning Analysis Design Implementation.
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
Introduction to Computer Technology
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Supervisory Systems.
CORE 1: PROJECT MANAGEMENT Overview TECHNIQUES FOR MANAGING A PROJECT Communication Skills Active Listening Mirroring Paraphrasing Summarizing Clarifying.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Effective Methods for Software and Systems Integration
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
Business Processes and Workflow How to go from idea to implementation
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Module 2.1 Finance and Administration Cabinet Organizational Changes and Agency Impact March
Server Virtualization: Navy Network Operations Centers
AMR Deployment Managing All That Data The Typical Process Buy Meter Test Meter Ship Meter Issue Install Setup Account Start Billing Remov e Meter.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Tacoma Power’s Compaq Server and Ethernet RTU Performance Testing Presented By Joe Orth 253/ EMS Group Meeting Presented.
Configuring Electronic Health Records Migration to an Electronic Health Record System Lecture b This material (Comp11_unit1b) was developed by Oregon Health.
Chapter 10 Information Systems Analysis and Design
NAPA Integrated Business Solutions
ISYS 562 Microcomputer Business Applications David Chao.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Listen to Your Meters! Pradeep Murthy SunTec Business Solutions.
Project Life Cycle.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Systems Analysis and Design
Core Banking Transformation: A Roadmap to a Successful Core Banking Product Implementation - PMI Virtual Library | | © 2008 Kannan S. Ramakrishnan.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Managing Reliability and the Markets with PI
This material was developed by Oregon Health & Science University, funded by the Department of Health and Human Services, Office of the National Coordinator.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
GIS Implementation: Issues and Strategies RNR-GEOG 417/517 Fall, 2000.
Chapter 12 The Network Development Life Cycle
Project Management.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
CS523 Database Design Instructor : Somchai Thangsathityangkul You can download lecture note at Class Presence 10% Quiz 10%
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Lecture Notes - Richard Ssembatya1 Information System Project Management Lecture Five By Richard Ssembatya MSc. Cs, BSc CS, CCNA, IT Essentials, ICDL Institute.
Chapter 7 Preliminary Construction The broad scope of implementation Preliminary construction in the SDLC Preliminary construction activities Preliminary.
Army Directorate of Public Works Support Contractor of the Year Building a government contractor for the 21 st century By Carlos Garcia Owner and CEO KIRA.
1 Keep the Money Flowing Victoria Edwards Clarence M. Hicks.
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Unit 8 – Project Management Lesson 4 –definition of scope.
Migration to an Electronic Health Record System
Project Management Processes
The New Texas Wholesale/Retail Market
Fereshte Shabany Moghadam
Department of Licensing HP 3000 Replatforming Project Closeout Report
Project Management Processes
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Managing A Migration Project Neil Phinney EMS Users Group June 7, 1999

First Rule of Project Management Choose from the following Low Cost Fast Delivery Quality System But you can’t have all three !

b Generation & Transmission Cooperative  Serving >650,000 Customers  Facilities in 45 Counties  Winter Peaking  1999 Peak Demand > 3,100 MW  350+ miles of Transmission  91.5% of Load Outside CA  10 members

b Delivered in 1986 b MB Disks b Aydin Display Generators b 108 RTUs b Mosaic Mapboard Legacy EMS Hardware b Gould \ SEL \ Encore CPUs

b Load Estimation b Demand Side Management b Forecasting b Interchange Scheduling b Member Billing Legacy EMS Applications b Data Exchange

EMS Support Staff b Small Staff - 6 people 2- Analysts 1 - Engineer 3- Technicians b No Formal Project Team b No Additional Staff

Replacement Approaches b Phased b Migration b Fork Lift

Bid Process b Bids Mailed - 4/15/98  6 vendors  5 Bids Received  3 Evaluated b Bid Awarded - 9/10/98 b First Project Meeting - 10/2/98 b RFI - FALL 1996

SECI’s Decision b Reasons For Selection  No project team  Gain experience  Cash flow spread  Logical contract terminated  Overall project cost less  Applications delivered as required

Project Implementation Plan b Stage 1 Real Time Data Interface  L A N  I U D L  Duplicate data base  Gateway

Project Implementation Plan b Stage 2 Transaction Evaluation Standalone UC/TE

Project Implementation Plan b Stage 3 Scheduling & Accounting  Historian  Control Criteria  I T S

Project Implementation Plan b Stage 4 System Stage  Integrated  Interfaced

Project Implementation Plan b Stage 5 AGC and SCADA  DSM  Load Estimation  Load Forecasting  Listening & Parallel

Project Implementation Plan b Stage 6 Mapboard 3 X 2 Video Board

Project Implementation Plan b Stage 7 System Acceptance  RTU Cut Over  System Testing

Status of Project  Stage 2 - Transaction Evaluation  Stage 3 - Scheduling & Accounting  Stage 1 - Real Time Interface

Lessons Learned  Managing Expectations  Project Coordination  Maintaining Schedule  Scope of Work

Lessons Learned  Legacy Work  Project Control  Training  Office Space  Testing

Overall Conclusion  Migration Complex  Advantages Outweigh  Reservations  Overall Pleased

The Money Theorem Power = Work / Time  Postulate 1: Knowledge is Power  Postulate 2: Time is Money Knowledge = Work /Money Then Less You Know The More You Earn Money = Work / Knowledge